Beaufort_Executive_Airport_Transient_Hangar_Design_Build_(Addendum_#3_Revision).pdf
PDF 301 KB Posted
- Solicitation number
- 050826
- Issued by
- Beaufort County, South Carolina
About this file
This is a Request for Proposal (RFP) issued by Beaufort County, South Carolina for design-build services to develop a new 120-foot by 60-foot clear-span transient aircraft hangar at Beaufort Executive Airport. The project encompasses full professional and construction services including architectural and engineering design, site validation, building system evaluation, cost estimating, permitting, procurement, construction administration, and closeout documentation. A mandatory pre-proposal meeting is scheduled for 2:00 pm (EST) on Wednesday, April 22, 2026, via Microsoft Teams, with proposals due electronically through the Procurement Portal no later than 3:00 pm (EST) on Friday, May 8, 2026. The County anticipates selecting the top-ranked firm in late May 2026, with contract execution targeted for mid-June 2026. Proposals must remain firm for 90 days and are limited to 15 double-sided pages excluding cover pages. The project is pad-ready with site preparation anticipated to be complete at contract execution.
Pricing will be negotiated with the highest-ranked firm following qualifications-based selection; specific award values or budget ranges are not disclosed in the solicitation. The project is funded through American Rescue Plan Act (ARPA) allocations that must be expended by the end of 2026, with additional funding sources supporting full project delivery. No set-aside designations or incumbent contractors are identified. Required insurance includes Workers' Compensation, Commercial General Liability ($1,000,000 each occurrence/$2,000,000 aggregate), Comprehensive Automobile Liability ($500,000 combined single limit), Umbrella Liability ($2,000,000), Builders Risk coverage at finished replacement cost value, and Professional Liability/Errors & Omissions ($1,000,000 per occurrence). Evaluation criteria consist of team qualifications and relevant experience (30 points), project understanding and technical approach (30 points), design-build methodology and collaboration plan (20 points), and schedule strategy with early-phase work readiness (20 points).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Proposal_Meeting_RFP_Beaufort_Executive_Airport_Transient_Hangar_Design_Build_-_Attendance_report_4-22-26.xlsx | XLSX spreadsheet | |
| Geotechnical_Report_for_Proposed_Ladys_Island_Airport_T-Hangars.pdf | ||
| QUESTION_3_ANSWER_SKETCH.docx | DOCX document | |
| Beaufort_Executive_Airport_Transient_Hangar_Design_Build.pdf | ||
| ARW_hangar_attachment.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
BEAUFORT EXECUTIVE AIRPORT TRANSIENT
HANGAR DESIGN BUILD
RFP # 050826
Prepared By: Airports
Dated: Wednesday, April 8, 2026
Proposal Due Date: Friday, May 8, 2026, 3:00 pm (EST)
RFP #050826 DOCUMENTS Page 2
NOTICE
COUNTY COUNCIL OF BEAUFORT COUNTY
PROCUREMENT SERVICES DEPARTMENT
106 Industrial Village Road, Bldg. 2 Post Office Drawer 1228 Beaufort, South Carolina 29901-1228
PROPOSAL NOTICE NO. 050826
CLOSING DATE AND TIME: Friday, May 8, 2026, 3:00 pm PROPOSAL TITLE: Beaufort Executive Airport Transient Hangar Design Build
You are invited to submit a proposal, in accordance with the requirements of this solicitation which are contained herein.
There will be a Mandatory Pre-Proposal meeting at 2:00 pm (EST) on Wednesday, April 22, 2026 at Please email Gillian Murray at gmurray@bcgov.net for your TEAMS invitation.
Please contact victoria.moyer@bcgov.net for the meeting link. All vendors are encouraged to attend.
In order for your proposal to be considered, it must be submitted through the Procurement Portal no later than 3:00 pm (EST) on Friday, May 8, 2026, at which time respondents to this request will be recorded in the presence of one or more witnesses. RFPs received after the time specified will not be considered. Due to the possibility of negotiation with all respondents, the identity of any respondents or the contents of any proposal shall not be public information until after the contract award is made; therefore, the public is not invited to the proposal closing.
Proposals must be submitted through the Procurement Portal at https://procurement.opengov.com/portal/bcgov. If you are not already registered, please register as a Vendor. There is no cost to register your company. This will allow you to submit your RFP electronically.
All submittals (see Submission Requirements) received in response to this Request for Proposal will be rated by a Selection Committee, based upon the Evaluation Criteria contained within this
RFP. If the best proposal respondent is clearly identified from the point summary, there will not be a need for oral presentations. If not, then an oral presentation from a minimum of the top two rated firms shall be required.
This solicitation does not commit Beaufort County to award a contract, to pay any costs incurred in the preparation of a proposal, or to procure or contract for the articles of goods or services. The
County reserves the right to accept or reject any or all proposals received as a result of this request, to negotiate with all qualified firms, or to cancel in part or in its entirety this solicitation, if it is in the best interests of the County to do so.
Dave Thomas, Procurement Services Director
(843) 255-2304 https://procurement.opengov.com/portal/bcgov
RFP #050826 DOCUMENTS Page 3
RFP #050826 DOCUMENTS Page 4
IMPORTANT ELECTRONIC SUBMITTAL REQUIREMENTS
Response submittals for this Request for Proposal will ONLY be received electronically and must be submitted ONLINE, through the Procurement Portal, no later than 3:00 pm on Friday, May 8, 2026.
All responses must adhere to the following guidelines:
• Suppliers are encouraged to submit responses as soon as possible. Responses are received through our secure Procurement Portal and cannot be opened prior to the due date and time. The time and date of receipt as recorded by the server will serve as the official time of receipt. The County is not responsible for late submissions, regardless of the reason.
• All requested information and forms MUST be uploaded as indicated in the
PROPOSAL SUBMITTAL Section. If you have a problem with your submittal, you may contact Support through the Procurement Portal.
https://procurement.opengov.com/portal/bcgov/projects/254256/document?section=2432981 mailto:cservice@vendorregistry.com
RFP #050826 DOCUMENTS Page 5
TITLE VI STATEMENT
COUNTY COUNCIL OF BEAUFORT COUNTY
Title VI Statement to Prime Contractors, Subcontractors, Architects, Engineers, and
Consultants
It is the policy of the County Council of Beaufort County, South Carolina, hereafter referred to as
“Beaufort County” or “the County”, to comply with Title VI of the 1964 Civil Rights Act (Title
VI) and its related statutes. To this end, Beaufort County assures that no person shall be excluded from participation in, denied the benefit of, or subjected to discrimination under any of its programs or activities on the basis of race, color, national origin, age, sex, disability, religion, or language regardless of whether those programs and activities are Federally funded or not. The
County is also committed to assuring every effort will be made to prevent the discrimination of low-income and minority populations as a result of any impact of its programs or activities. Beaufort County also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. Additionally, the County will take reasonable steps to provide meaningful access to services for persons with limited English proficiency. In addition, Beaufort County will not retaliate against any person who complains of discrimination or who participates in an investigation of discrimination. Beaufort County will, where necessary and appropriate, revise, update, and incorporate nondiscrimination requirements into appropriate documents, directives, and regulations.
Pursuant to Title VI requirements, any entity that enters into a contract with Beaufort County including, but not limited to Prime Contractors, Subcontractors, Architects, Engineers, and
Consultants, may not discriminate on the basis of race, color, national origin, age, sex, disability, religion, or language in their selection and retention of first-tier subcontractors, and first-tier subcontractors may not discriminate in their election and retention of second-tier subcontractors, including those who supply materials and/or lease equipment. Further, Contractors may not discriminate in their employment practices in connection with highway construction projects or other projects assisted by the U.S. Department of Transportation (USDOT) and/or the Federal
Highway Administration (FHWA).
In all solicitations either by competitive bidding or negotiation made by the Contractor for work to Beaufort County to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Contractor of the Contractor's obligations under the contract and the Title VI regulations relative to nondiscrimination on the basis of race, color, national origin, age, sex, disability, religion, or language by providing such a statement in its bidding and contract documents.
RFP #050826 DOCUMENTS Page 6
Upon request, the Contractor shall provide all information and reports required by Title VI requirements issued pursuant thereto, and shall permit access to its books, records, accounts and other sources of information, and its facilities as may be determined by Beaufort County, USDOT, and/or FHWA to be pertinent to ascertain compliance with such regulations, orders, and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails or refuses to furnish this information, the Contractor shall so certify to USDOT or FHWA, as appropriate and via Beaufort County, and shall set forth what efforts it has made to obtain the information. In the event of the Contractor's non-compliance with nondiscrimination provisions of this contract, USDOT may impose such contract sanctions as it or FHWA may determine to be appropriate, including, but not limited to:
• Withholding of payments to the Contractor under the contract until the Contractor complies, and/or
• Cancellation, termination, or suspension of the contract, in whole or in part.
In the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of this direction to comply with Title VI, the Contractor may request USDOT to enter into such litigation to protect the interests of USDOT and FHWA. Additionally, the
Contractor may request the United States to enter into such litigation to protect the interests of the
United States. Any person or Subcontractor who believes that they have been subjected to an unlawful discriminatory practice under Title VI has a right to file a formal complaint within one hundred eighty (180) days following the alleged discriminatory action. Any such complaint must be filed in writing or in person:
Beaufort County Government Post Office Drawer 1228 | Beaufort, SC 29901-1228
843-255-2304 Telephone | E-mail: dthomas@bcgov.net mailto:dthomas@bcgov.net
RFP #050826 DOCUMENTS Page 7
INSURANCE REQUIREMENTS
4.1. INSURANCE REQUIREMENTS
4. 1.1 INSURANCE REQUIREMENTS: Prior to commencing work/delivery hereunder, contractor/vendor, at his expense, shall furnish insurance certification showing the certificate holder as Beaufort County, P. O. Drawer 1228, Beaufort, SC 29901, Attention: Risk Management Director, and with a special notation naming Beaufort County as an additional insured on the liability coverages. Minimum coverage shall be as follows:
4.1.2 Worker’s Compensation Insurance – Contractor shall have and maintain, during the life of this contract, Worker’s Compensation Insurance for his or her employees connected to the work/delivery, in accordance with the Statutes of the State of South Carolina and any applicable laws. Employers Liability minimum limits required $500,000
4.1.3 Commercial General Liability Insurance - Contractor shall have and maintain, during the life of this contract, Commercial General Liability Insurance. Said Commercial General Liability Policy shall contain
Contractual Liability and Products/Completed Operations Liability subject to the following minimum limits:
$1,000,000 Each Occurrence/ $2,000,000 General Aggregate and $2,000,000 Products/Completed
Operations Aggregate naming Beaufort County as an additional insured.
4.1.4 Comprehensive Automobile Liability Insurance – The Contractor shall have and maintain, during the life of this contract, Comprehensive Automobile Liability, including non-owned and hired vehicles, of at least $500,000 COMBINED SINGLE LIMIT.
4.2.1 ADDITIONAL INSURANCE REQUIREMENTS: Umbrella Liability Insurance – Contractor shall have and maintain, during the life of this contract, Umbrella Liability Insurance with a minimum limit of $2,000,000
4.2.2 Builders Risk/Instillation (For Construction Projects Only) Contractor is to provide
Builders Risk/Instillation coverage at finished replacement cost value. The coverage is to include building materials in transit or at the job site location.
4.2.3 Professional Liability (Errors & Omissions): (For Professional Services Only) Professional
Liability Insurance protects against losses that occur when a “professional” errors in judgement, planning, and design could result in economic loss to the entity or county. In order to determine if Professional Liability should be required ask yourself: Is the professional licensed or certified (i.e. architects, consultants, auditors, attorneys, engineers, etc.)? Required if a contractor is performing any type of design/build for a particular project. The vendor shall maintain a limit no less than $1,000,000 per occurrence:
4.3 The required insurance policy at the time of issue must be written by a company licensed to do business in the
State of South Carolina and be acceptable to the County.
4.4 The Contractor/vendor shall not cause any insurance to be canceled or permit any insurance to lapse. All insurance policies shall contain a clause to the effect that the policy shall not be canceled or reduced, restricted or limited, until fifteen (15) days after the County has received written notice, as evidenced by return receipt of registered or certified letter. Certificates of Insurance shall contain transcript from the proper office of the insurer, the location, and the operations to which the insurance applies, the expiration date, and the above-mentioned notice of cancellation clause.
4.5 The information described above sets forth minimum amounts and coverages and is not to be construed in any way as a limitation on the Contractor’s liability.
SCOPE OF WORK
RFP #050826 DOCUMENTS Page 8
5.1. Project Intent
Beaufort County seeks to procure design-build services for the development of a new transient aircraft hangar at Beaufort Executive Airport (ARW) 39 Airport Circle, Beaufort, SC 29907.
The proposed facility is a 120-foot by 60-foot clear-span hangar intended to support transient general aviation activity and enhance the Airport’s operational and revenue-producing capacity.
The County’s objective is to engage a qualified design-build team capable of advancing the project efficiently from concept validation through design, pricing, procurement, and construction.
5.2. Project Site and Existing Conditions
The proposed hangar site has been identified and is expected to be pad-ready at the time of contract execution. Site preparation is anticipated to include completion of grading and pavement tie-ins necessary to support hangar construction.
The County expects the selected design-build team to validate site conditions as part of its preconstruction services and incorporate those conditions into its final design and implementation approach.
5.3. Desired Delivery Method
The County intends to utilize a design-build delivery method for this project. The County believes this approach is best suited to the project because it allows for:
• prompt initiation of design services;
• collaboration between the owner, designer, and constructor during scope development;
• early evaluation of building systems, constructability, and cost;
• identification of early procurement or construction activities that may be advanced ahead of full project buildout; and
• development of a practical, phased path to implementation.
The County is not seeking to impose an artificially compressed overall construction schedule.
Rather, the County seeks a qualified design-build partner that can begin promptly, sequence the work intelligently, and support early project expenditures associated with available funding.
5.4. Project Goals and Priorities
The selected design-build team shall be expected to support the following project priorities:
RFP #050826 DOCUMENTS Page 9
Efficient project initiation and advancement The County seeks a team that can begin work promptly upon award, organize the project effectively, and advance design and preconstruction activities without unnecessary delay.
Cost-effective and constructible solutions The project should reflect a practical, durable, and economical approach appropriate for an airport transient hangar facility.
Structural and operational efficiency The County is interested in hangar and door systems that reduce unnecessary structural complexity, minimize material demands where feasible, and provide a functional and maintainable facility.
Collaborative scope and pricing development The County expects the selected team to work collaboratively through design development, system evaluation, cost refinement, and final price establishment.
Timely funding deployment The County seeks an approach that allows eligible design, procurement, and/or construction activities to proceed in time to support expenditure of certain project funds within required timeframes.
5.5. Performance-Based Project Expectations
The County intends to describe the project primarily through performance requirements, rather than a fully prescriptive design. Proposers should be prepared to provide a complete and functional hangar solution that satisfies the County’s operational needs and project objectives.
The design-build team should anticipate that the project will include, at a minimum, the following elements:
• an approximately 120-foot by 60-foot hangar building;
• clear-span functionality appropriate for transient aircraft storage;
• a large clear-opening hangar door system, with opening width to be confirmed during design development;
• structural and door system solutions that emphasize efficiency and constructability;
• compliance with applicable code, wind-load, and coastal design requirements; and
• all design, engineering, coordination, and construction necessary to deliver a complete and operational facility.
The hangar door system shall be designed to provide the required aircraft clear opening while minimizing dead load and promoting a lightweight overall door assembly on the primary building structure.
RFP #050826 DOCUMENTS Page 10
Respondents should demonstrate experience with door system solutions that promote efficient structural design, including approaches that may reduce supporting structural steel and related building components while maintaining durability, wind-load resistance, operational reliability, and suitability for a coastal airport environment. The proposed system shall include a practical means of manual or emergency operation in the event of power loss. The Airport seeks door system solutions that deliver long-term value through structural efficiency, safe and reliable operation, and low maintenance requirements.
The County may express preferences for certain functional or performance outcomes associated with the hangar door and structural system; however, proposers may offer alternative systems provided they satisfy the County’s stated requirements and do not adversely affect cost, structural efficiency, schedule, or functionality.
5.6. Anticipated Scope of Design-Build Services
The selected design-build team is expected to provide all professional and construction services necessary to deliver the project, including, but not limited to:
• project management and coordination;
• architectural and engineering design;
• validation of site and interface conditions;
• building system evaluation and recommendations;
• cost estimating and pricing development;
• schedule development and phasing recommendations;
• permitting and code coordination, as applicable;
• procurement of materials and equipment;
• construction and construction administration;
• commissioning/startup as applicable; and
• closeout documentation, operations and maintenance manuals.
The County also expects the design-build team to identify any logical early work packages, long-lead procurement items, or phased implementation opportunities that may support efficient project advancement and timely funding expenditure.
5.7. Funding Considerations
This project includes
RFP #050826 DOCUMENTS Page 11
American Rescue Plan Act (ARPA) funding that must be expended by the end of 2026.
Additional funding sources are expected to support full delivery of the project.
Accordingly, the County is interested in receiving proposals from teams that can demonstrate a practical strategy for initiating eligible design, procurement, and/or construction activities in time to satisfy that funding requirement. This milestone should not be interpreted as requiring full completion of the hangar by the end of 2026.
5.8. Procurement Intent
The County anticipates selecting a design-build team on a best-value basis, taking into account qualifications, relevant experience, project understanding, proposed approach, team composition, schedule strategy.
Pricing will be requested from the top ranked firm following evaluation based on the criteria set forth in this solicitation.
The County is particularly interested in teams with demonstrated experience in:
• design-build delivery;
• aviation or similar industrial/facility construction;
• pre-engineered metal building systems or comparable clear-span structures;
• large aircraft hangar door systems; and
• efficient, well-sequenced project execution.
5.9. Anticipated Procurement Schedule
The County’s current target schedule is as follows:
• issuance of solicitation: mid April 2026;
• receipt of proposals: mid May 2026;
• selection of top ranked vendor and request of pricing (subject to County
Committee/Council approval): late May 2026; and
• contract execution: target mid-June 2026.
These dates are preliminary and may be adjusted by the County as needed. The County expects proposers to address how they would promptly initiate work following award and how they would structure early-phase services to support the project’s funding and implementation objectives.
5.10. Owner Commitment
The County views this as a focused, pad-ready project with a defined purpose and a strong opportunity for efficient implementation. The County intends to work collaboratively with the
RFP #050826 DOCUMENTS Page 12 selected design-build team to confirm the project scope, refine the design, establish pricing, and advance the project in a practical and disciplined manner.
The County seeks a partner that understands how to move a relatively straightforward aviation facility project forward efficiently while maintaining sound design judgment, cost discipline, and constructability.
PROPOSAL SUBMISSION INSTRUCTIONS
1. Award shall be posted on the County's Procurement Portal.
2. Prohibition of Gratuities: It shall be unethical for any person to offer, or give, or agree to give any County employee or former County employee, or for any County employee or former County employee to solicit, demand, accept, or agree to accept from another person, a gratuity or an offer of employment in connection with any decision, approval, disapproval, recommendation, or preparation of any part of a purchase request, influencing the content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any other advisory capacity in any proceeding or application, request for ruling, determination, claim or controversy, or other particular matter, pertaining to any program requirement or a contract or subcontract, or to any solicitation or proposal therefore.
3. Questions
A. Submit questions you have through the Procurement Portal no later than 5:00 pm on
Friday, April 24, 2026.
B. Answers to questions received that would change and/or clarify this solicitation will be posted on the Procurement Portal as addendum.
C. Selection Committee members SHALL NOT be contacted during the RFP process.
4. In order to do business with the Beaufort County, vendors must register through the
Procurement Portal at https://procurement.opengov.com/portal/bcgov. Registering allows businesses to identify the type of goods and services they provide so that they may receive email notifications regarding relevant solicitations out for bid.
EVALUATION CRITERIA
No. Evaluation Criteria Scoring Method Weight (Points) https://procurement.opengov.com/portal/bcgov
RFP #050826 DOCUMENTS Page 13
1. Team Qualifications & Relevant Experience
The County will evaluate:
• previous experience delivering design-build aviation or comparable industrial facilities;
• experience with pre-engineered metal buildings and clear-span hangar structures;
• experience designing and installing large hangar door systems, including non-hydraulic and alternative systems;
• proven ability to execute efficient, well-sequenced project delivery;
• resumes and roles of key personnel.
0-100 Points 30 (30% of Total)
2. Project Understanding & Technical
Approach
Evaluation will include:
• understanding of the County's project goals and performance-based requirements;
• approach to validating site conditions and integrating findings into design;
• understanding of pad-ready site expectations and interface needs;
• proposed strategies for structural efficiency, material optimization, and maintainability;
In evaluating qualifications, the Airport may consider the respondent’s experience with hangar door solutions that minimize structural demands, provide dependable operation including manual or emergency backup capability, and perform effectively in coastal conditions with low long-term maintenance requirements.
0-100 Points 30 (30% of Total)
3. Design-Build Methodology & Collaboration
Plan
The County will review:
• proposer’s progressive design-build process;
• methods for collaborative scope development, cost refinement, and design iteration;
• integration of constructability reviews;
• communication and decision-making protocols;
• approach to early-phase work packaging and long-lead procurement.
0-100 Points 20 (20% of Total)
RFP #050826 DOCUMENTS Page 14
4. Schedule Strategy & Early-Phase Work
Readiness
The County will evaluate the proposer’s ability to:
• begin promptly upon award;
• develop a logical and efficient project sequence;
• identify early eligible activities supporting required funding expenditure timelines;
• deliver a realistic schedule tied to design development and permitting needs.
0-100 Points 20 (20% of Total)
PROPOSAL SUBMITTAL
1. Proposer confirms the proposal is firm for a period of at least 90 days from the closing date for submission of proposal.*
☐ Please confirm
*Response required
2. Please Provide Licenses and Certificate of Insurance. *
*Response required
3. Certification regarding Debarment, Suspension, Ineligibility, and Voluntary exclusion*
The contractor certifies, by submission of this qualification statement or acceptance of a contract, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any State, Federal department, or agency.
It further agrees by submitting this qualification statement that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts, and subcontracts.
Where the bidder/contractor or any lower tier participant is unable to certify to this statement, it shall attach an explanation to this solicitation/bid.
☐ Please confirm
*Response required
4. State whether your company has been involved in any litigation within the past five (5) years, arising out of your performance. *
☐ Yes
☐ No
*Response required
When equals "Yes"
4.1. Explain fully any litigation involving performance.*
*Response required
RFP #050826 DOCUMENTS Page 15
5. Non-Segregated Facilities*
CERTIFICATION BY CONTRACTOR
Regarding
NON-SEGREGATED FACILITIES
The Bidder certifies that he does not, and will not, provide and maintain segregated facilities for his employees at his establishments and, further that he does not, and will not, permit his employees to perform their services at those locations, under his control, where segregated facilities are provided and maintained. Segregated fountains, transportation, parking, entertainment, recreation, ad housing facilities; waiting, rest, wash, dressing, and locker room, and time clock, work, storage, restaurant, and other eating areas which are set apart in fact, or by explicit directive, habit, local custom, or otherwise, based on color, creed, national origin, and race. The Bidder agrees that, except where he has obtained identical certifications from proposed subcontractors for specific time periods, he will obtain identical certifications from proposed subcontractors prior to the award of subcontractors exceeding $10,000.00 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files.
The Bidder agrees that a breach of this certification is a violation of the Equal Opportunity clause in this Contract. The penalty for making false statements is prescribed in 18 U.S.C. 1001.
☐ Please confirm
*Response required
6. Please upload any relevant certifications and/or licenses
7. Proposal (excluding pricing)*
To achieve a uniform review process and allow for adequate comparability, the information is to be organized in the manner specified below and the entire package must not exceed 15 double-sided printed pages excluding cover pages. Please include a cover page at the start of each section.
1. Executive Summary: Summary of your company's mission, management, services provided, and competitive advantage
2. Approach to the Planning Process: Explanation of the process to the Firm's Planning
Process for project kickoff
3. Work Plan and Scheduling: A summary of tasks to be performed from evaluation of data through County approval of the final plan. Include a timeline of key milestone to include overall durations for each major task.
4. Experience and Qualifications: Experience and qualifications of the team members, with an emphasis on similar type project completed within the last five (5) years. Provide an organization chart including sub-consultants and contractors.
5. List any exceptions, qualifications, or exclusions to this RFP
RFP #050826 DOCUMENTS Page 16
*Response required
RESERVED RIGHTS
The County shall not be responsible for any of the costs associated with responding to this request and all submitted materials shall become the property of the County. Furthermore, the County expressly reserves the right and options to:
• Reject any or all consultants and re-advertise if deemed necessary
• Waive any or all formalities and technicalities
• Approve, disapprove, or cancel all services associated with the project
The County has yet to decide whether to select one or more other firms to provide some or all of the professional services described in this document. All selected firms will perform such services under the direct supervision of Beaufort County.
SELECTION AND NOTIFICATION
The selected firms will be given written notification of being selected by the County. This work may be awarded in whole or in part at the sole discretion of the County. The County will negotiate and execute a contract with the selected firm(s) prior to the beginning of the actual services. Should contract negotiations fail, the County will negotiate with one or the other highly ranked firms. In general, the contract will comply with applicable laws and standard provisions and shall contain the following terms:
• Detailed scope of services
• Schedule for providing services
• Cost of services
BEAUFORT COUNTY STANDARDS FOR CONTRACTING
CHAPTER 1. TYPES OF CONSULTANT SERVICES REQUIRED:
Please see Scope of Work Section.
CHAPTER 2. PROCEDURES FOR SELECTION OF CONSULTANTS
2-1. GENERAL
Qualifications-based procedures require that a contract for consulting services be awarded pursuant to a fair and open selection process based on the qualifications of the firms. The fees for such services are established following selection of a firm through a negotiation process to determine a fair and reasonable price.
2-2. OBJECTIVE
RFP #050826 DOCUMENTS Page 17
Consultants employed for work on projects shall be responsible and possess the ability to perform successfully under the terms and conditions of the proposed procurement. Consideration shall be given to such matters as integrity, record of past performance, extent of experience with the type of services required by the sponsor, technical resources, and accessibility to other necessary resources.
2-3. QUALIFICATIONS-BASED SELECTION PROCEDURES.
Consultants shall be selected based on their qualifications and experience, with fees determined through negotiations following selection. The highest ranked offeror shall be selected, and price proposals shall be negotiated with one or more of the firms identified through the qualifications-based selection procedure.
2-4. SELECTION CRITERIA.
Criteria include, but are not limited to, the following:
1. Please see the Evaluation Criteria Section.
CHAPTER 3. CONTRACT FORMAT
3-1. MANDATORY CONTRACT PROVISIONS.
All contracts involving State or Federal funds must contain the applicable procurement standards in 49 CFR 18.36. Listed below are those provisions which pertain to consultant contracts:
1. Contracts shall contain provisions or conditions which will allow for administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms and provide for sanctions and penalties as may be appropriate.
2. Contracts over $10,000 shall contain suitable provisions for termination by the sponsor, including how it will be affected and the basis for settlement. In addition, contracts shall describe conditions under which the contract may be terminated for default as well as conditions where the contract may be terminated because of circumstances beyond the control of the consultant.
3. All negotiated contracts shall include provisions to the effect that sponsors, the Federal
Department of Transportation, the Comptroller General of the United States, or any of the duly authorized representatives shall have access to any books, documents, papers, and records of consultants which are directly pertinent to a specific grant program, for the purpose of making audits, examinations, excerpts, and transcriptions. Sponsors shall require consultants to maintain all required records for 3 years after the sponsor makes final payment and all other pending matters are closed.
4. In addition to the requirements contained in 49 CFR Section 23, Participation by
Minority Business Enterprises in Department of Transportation Programs, and AC
150/5100-15, Civil Rights Requirements for the Airport Improvement Program, current
RFP #050826 DOCUMENTS Page 18 edition, the Title VI, and Disadvantaged Business Enterprise Assurances in Appendix 1 shall be included in each contract.
3-2. TIME OVERRUNS BEYOND CONTROL OF THE CONSULTANT.
Frequently, the consultant is called upon to continue technical inspection services on construction contracts--overrunning the program schedule contemplated at the time of negotiation. In most instances, the time element is beyond the control of the consultant. To provide for the contingency of overrun of time, the agreement between the County and the consultant will state the period for which the compensation shall apply and that the consultant shall be reimbursed for services in excess of the specified period of time at a mutually acceptable fee negotiated at the time all the pertinent circumstances are known.
CHAPTER 4. METHODS OF CONTRACTING AND ALLOWABLE COSTS
4-1. ALLOWABLE COSTS.
1. Direct Salary Costs.
A. Direct salary cost is defined as the cost of salaries of engineers, draftsmen, surveyors, stenographers, clerks, etc., for time directly chargeable to the project.
B. Salaries or imputed salaries of partners or principals, to the extent that they perform technical or advisory services directly applicable to the project, are to be added to salary cost.
2. Overhead Costs. Overhead costs include overhead on direct salary costs and general and administrative overhead.
A. Labor Overhead. Overhead on direct salary costs includes sick leave, vacation, and holiday pay; unemployment, excise, and payroll taxes; contributions for social security, employment compensation insurance, retirement benefits, and medical insurance benefits; and any other benefits customarily paid to or enjoyed by all employees. The allowable percentage for labor overhead allocable to a project is the ratio of (a) a firm's total direct labor overhead costs to (b) a firm's total direct salary costs (excluding overtime) for a given period, usually the average for the past 3 years.
B. General and Administrative Overhead. General and administrative overhead includes the following indirect costs which are not directly attributable to specific projects.
a. Provisions for office, light, heat, and similar terms for working space, depreciation allowances or rental for furniture, drafting equipment and engineering instruments, and office and drafting supplies not identifiable to specific projects.
RFP #050826 DOCUMENTS Page 19
b. Taxes and insurance other than those included as salary cost but excluding state and Federal income taxes.
c. Library and periodical expenses, and other means of keeping abreast of advances in engineering such as attendance at technical and professional meetings and subscriptions to trade, business, professional, or technical periodicals.
d. Executive, administrative, accounting, legal, stenographic, and clerical salaries, and expenses (other than identifiable salaries included in salary costs and expenses included in reimbursable non-salary expenses, plus salaries or imputed salaries of partners and principals) to the extent that they perform general executive and administrative services as distinguished from technical or advisory services directly applicable to projects.
e. Costs of memberships in trade, business, technical, and professional organizations.
f. Incentive compensation for management employees, cash bonuses, suggestion awards, safety awards, and incentive compensation based on production, cost reduction, or efficient performance are allowable to the extent that the overall compensation is determined to be reasonable, and such costs are paid or accrued pursuant to an agreement entered into in good faith between the consultant and the employees before the services are rendered or pursuant to an established plan followed by the consultant so consistently as to imply, in effect, an agreement to make such payment. The allowable percentage for general and administrative overhead allocable to a project is the ratio of (a) all general and administrative costs to (b) total direct salary costs (excluding overtime) for a given period, usually the average for the past 3 years.
3. Direct Non-salary Expenses. Direct non-salary expenses usually incurred may include the following (detailed records must be kept supporting charges and allow auditing):
A. Living and traveling expenses of employees, partners, and principals when away from the home office on business connected with the project. (Records must include employee name, dates, points of travel, mileage rate, lodging, and meals.)
B. Identifiable communication expenses such as long-distance telephone, telegraph, cable, express charges, and postage, other than for general correspondence.
C. Services directly applicable to the work such as special legal and accounting expenses, computer rental and programming costs, special consultants, borings, laboratory charges, commercial printing and bindings, and similar costs that is not applicable to general overhead.
RFP #050826 DOCUMENTS Page 20
D. Identifiable drafting supplies and stenographic supplies and expenses charged to the sponsor's work as distinguished from such supplies and expenses that are applicable to two or more projects.
E. Identifiable reproduction costs applicable to the work such as blueprinting, photosetting, mimeographing, printing, etc.
F. Advertising costs which are solely for the recruitment of personnel required for the performance by the consultant of obligations arising under the contract.
4-2. NON-ALLOWABLE COSTS.
The expenses listed below are not allowable for reimbursement:
1. Costs of amusement and social activities and incidental costs relating thereto such as meals, lodging, rentals, transportation, and gratuities.
2. Contributions and donations.
3. Bad debts, including losses due to uncollectible customer's accounts and other claims, related collection costs, and related legal costs, arising from other businesses of the consultant.
4. Dividend provisions or payments and, in the case of sole proprietors and partners, distributions of profit.
5. Interest on borrowed capital.
6. Bonus payment for early completion of work.
4-3. FIXED PAYMENT.
To all the estimated costs, including overhead, a percentage rate is applied to determine payment for profit, willingness to serve, and assumption of responsibility.
CHAPTER 5. BEAUFORT COUNTY STANDARD CLAUSES
CONTRACTUAL REQUIREMENTS
1.0 EXCUSABLE DELAY: The Contractor shall not be liable for any excess costs, if the failure to perform the contract arises out of causes beyond the control and without the fault or negligence of the Contractor. Such causes may include, but are not restricted to, acts of God or of the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and unusually severe weather; but in every case the failure to perform must be beyond the control and without the fault or negligence of the Contractor. If the failure to perform is caused by the default of a subcontractor, and if such default arises out of causes beyond the control of both the Contractor and the subcontractor, and without the fault or negligence of either of them, the Contractor shall not be liable for any excess costs for failure to perform, unless the supplies or services to be
RFP #050826 DOCUMENTS Page 21 furnished by the subcontractor were obtainable from other sources in sufficient time to permit the
Contractor to meet the required delivery schedule.
2.0 S.C. LAW CLAUSE: Upon award of a contract under this Request for PROPOSALS, the person, partnership, association, or corporation to whom the award is made must comply with local and State laws which require such person or entity to be authorized and/or licensed to do business in Beaufort County. Notwithstanding the fact that applicable statutes may exempt or exclude the successful offeror from requirements that it be authorized and/or licensed to do business in
Beaufort County, by submission of this signed Request for PROPOSALS the offeror agrees to subject itself to the jurisdiction and process of the Fourteenth Judicial Circuit Court of Beaufort
County, as to all matters and disputes arising or to arise under the contract and the performance thereof including any questions as to the liability for taxes, licenses, or fees levied by State or local government.
3.0 OFFEROR’S PROPOSALS: Offeror must, upon request of the County, furnish satisfactory evidence of their ability to furnish products or services in accordance with the terms and conditions of this Request for PROPOSALS. The Procurement Services Department reserves the right to make the final determination as to the offeror’s ability to provide the services requested herein, before entering into any contract.
4.0 OFFEROR RESPONSIBILITY: Each offeror shall fully acquaint himself with conditions relating to the scope and restrictions attending the execution of the work under the conditions of this Request for PROPOSALS. It is expected that this will sometimes require on-site observation. The failure or omission of an offeror to acquaint themselves with existing conditions shall in no way relieve him of any obligation with respect to this Request for PROPOSALS or to the contract.
5.0 AFFIRMATIVE ACTION: The Contractor will take affirmative action in complying with all Federal and State requirements concerning fair employment and employment of the handicapped and concerning the treatment of all employees, without regard or discrimination by reason of race, religion, sex, national origin, or physical handicap.
6.0 PRIME CONTRACTOR RESPONSIBILITIES: The Contractor will be required to assume sole responsibility for the complete effort, as required by this RFP. The County will consider the
Contractor to be the sole point of contact with regard to contractual matters.
7.0 SUBCONTRACTING: If any part of the work covered by this RFP is to be subcontracted, the Contractor shall identify the subcontracting organization and the contractual arrangements made with same. All subcontractors must be approved, in writing by the County, or when applicable a political subdivision within the County with the County’s concurrence. The successful offeror will also furnish the corporate or company name and the names of the officers of any subcontractors engaged by the vendor. The County reserves the right to reject any or all subcontractors and require substitution of a firm qualified to participate in the work as specified herein.
RFP #050826 DOCUMENTS Page 22
8.0 OWNERSHIP OF MATERIAL: Ownership of all data, material, and documentation originated and prepared for the County pursuant to this contract shall belong exclusively to the
County.
9.0 PERFORMANCE AND PAYMENT BONDS: (NOT Required for Professional Services)
The successful Contractor shall furnish, within ten (10) days after written notice of acceptance of
Request for PROPOSALS, Performance and Payment Bonds. Contractor shall provide and pay the cost of a both bonds. The Bonds shall be in the amount of one hundred percent (100%) the contract, issued by a Surety Company licensed in South Carolina with an “A” minimum rating of performance as stated in the most current publication of “Best’s Key Rating Guide, Property
Liability” which shall show a financial strength rating of at least five (5) times the Contract
Price. The Bond shall be accompanied by a “Power of Attorney” authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond.
10.0 NONRESIDENT TAXPAYERS: If the offeror is a South Carolina nonresident taxpayer and the contract amount is $10,000.00 or more, the offeror acknowledges and understands that in the event he is awarded a contract offeror shall submit a Nonresident Taxpayer Registration
Affidavit (State form #1-312-6/94), before a contract can be signed. Affidavit must certify that the nonresident taxpayer is registered with the S.C. Department of Revenue or the S.C. Secretary of State’s Office, in accordance with Section 12-9-310(A) (2) (3) of S.C. Code of Laws (1976) as amended.
11.0 BUSINESS LICENSE In accordance with the Beaufort County Business License
Ordinance, 99-36, Article III, as enacted November 22, 1999, any business or individual generating income in the unincorporated area of Beaufort County is required to pay an annual license fee and obtain a business license. The ordinance referenced is available on the Beaufort
County website at www.beaufortcountysc.gov or by calling the Business License Administrator at
(843) 255-2270 for a list of schedules.
12.0 ADDITIONAL ELIGIBILITY: Other Beaufort County Public Procurement units shall, at their option, be eligible for use of any contracts awarded pursuant to this Invitation.
13.0 INSURANCE REQUIREMENTS: Prior to commencing work/delivery hereunder, Contractor/Vendor, at his expense, shall furnish insurance certification showing the certificate holder as Beaufort County, P.O. Drawer 1228, Beaufort, SC 29901-1228, Attention: Procurement
Services Director and with a special notation naming Beaufort County as an additional insured on the liability coverage. Minimum coverage shall be as follows:
1. Worker’s Compensation Insurance - Contractor shall have and maintain, during the life of this contract, Worker’s Compensation Insurance for his employees connected to the work/delivery, in accordance with the Statutes of the State of South Carolina and any applicable laws.
2. Commercial General Liability Insurance – Contractor shall have and maintain, during the life of this contract, Commercial General Liability Insurance. Said Commercial General
Liability Policy shall contain Contractual Liability and Products/Completed Operations
RFP #050826 DOCUMENTS Page 23
Liability subject to the following minimum limits: $1,000,000 Each Occurrence/
$2,000,000 General Aggregate and $2,000,000 Products/Completed Operations
Aggregate naming Beaufort County as an additional insured.
3. Comprehensive Automobile Liability Insurance - The Contractor shall have and maintain, during the life of this contract, Comprehensive Automobile Liability, including non-owned and hired vehicle, of at least $500,000 COMBINED SINGLE LIMIT.
4. ADDITIONAL INSURANCE REQUIREMENT: Umbrella Liability Insurance –
Contractor shall have and maintain, during the life of this contract, Umbrella Liability
Insurance with a minimum limit of $2,000,000
5. Professional Liability (Errors & Omissions) – The vendor shall maintain a limit no less than $1,000,000 per occurrence.
6. The required insurance policy at the time of issue must be written by a company licensed to do business in the State of South Carolina and be acceptable to the County.
7. The Contractor/vendor shall not cause any insurance to be canceled or permit any insurance to lapse. All insurance policies shall contain a clause to the effect that the policy shall not be canceled or reduced, restricted, or limited until fifteen (15) days after the County has received written notice, as evidenced by return receipt of registered or certified letter. Certificates of Insurance shall contain transcript from the proper office of the insurer, the location, and the operations to which the insurance applies, the expiration date, and the above-mentioned notice of cancellation clause.
8. The information described above sets forth-minimum amounts and coverages and is not to be construed in any way as a limitation on the Contractor’s liability.
14.0 INDEMNITY:
The Contractor hereby agrees to indemnify and save harmless the County, its officers, agents, and employees from and against any and all liability, claims, demands, damages, fines, fees, expenses, penalties, suits, proceedings, actions and cost of actions, including attorney’s fees for trial and on appeal of any kind and nature arising or growing out of or in any way connected with the performance of the Agreement, whether by act of omissions of the Contractor, its agents, servants, employees or others, or because of or due to the mere existence of the Agreement between the parties.
15.0 TERMINATION FOR DEFAULT:
15.1 The performance of Work under the Agreement may be terminated by the
Procurement Services Director, in accordance with this clause, in whole or in part, in writing, whenever the Director of Procurement Services shall determine that the Contractor has failed to meet the performance requirements of this Agreement.
RFP #050826 DOCUMENTS Page 24
15.2 The Procurement Services Director has the right to terminate for default, if the
Contractor fails to make delivery of the supplies or perform the Work, or if the Contractor fails to perform the Work within the time specified in the Agreement, or if the Contractor fails to perform any other provisions of the Agreement.
16.0 TERMINATION FOR CONVENIENCE: The County may without cause terminate this contract in whole or in part at any time for its convenience.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .