Beacon_Warning_Signs_Bid_Result.pdf
PDF 14 MB Posted
- Contract number
- 395002-M21-0510382
- Issued by
- Wisconsin
About this file
This is a Wisconsin Department of Administration Simplified Bidding Record and Purchase Order Request for a project conducted by WisDOT SE Region Traffic Operations in Racine County, Wisconsin. The procurement was managed by Tom Heydel at WisDOT's SE Region office in Waukesha, with Arbor Green of Portage, Wisconsin serving as the selected contractor. The bidding process involved soliciting quotes from three suppliers, though only one responsive bid was received due to COVID-19 restrictions limiting sealed bid submissions.
The contract covers the furnish and installation of two solar-powered crossroad warning sign beacon assemblies at STH 38 and 4 Mile Road, with a total value of $13,000 ($6,500 per unit). The scope includes TAPCO Model 373-01299 12-inch yellow beacons with visors, Type I poles, Type 2 concrete footings, W2-1 crossroad warning signs (36" x 36"), and W13-1 speed plaques (45 MPH). Additional work involves relocating the existing northbound static sign to the left side of the roadway and removing the southbound static sign. The contract includes a 45-day completion timeline, one-year warranty, and requires the contractor to submit shop drawings and certificates of compliance prior to work commencement. Work zone traffic control and coordination with Wisconsin's Lane Closure System (LCS) are also required components of the project.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unit Price Total Unit Price Total Unit Price Total
Codes:
MBE: Minority Business Enterprise (Certified) WC: Work Center(Certified) DVB: Disabled Veteran-owned Business (Certified)
Instructions:
• Agency shall contact at least three (3) suppliers and use PRO-C-8 as guidance.
• The completed form shall be attached to the requisition or procurement/transactional contract.
• Generic specifications shall be used when possible.
• When necessary to use a brand name to identify a level of quality, suppliers must be informed that equivalent alternatives may be acceptable; agency will be the sole determinate of equivalency.
• The winning bidder should be indicated. Reasons for rejecting any bids shall be noted below.
Agency shall make an effort to solicit small businesses, veteran-owned businesses, disabled veteran-owned business and minority businesses and work centers.
Grand Total Grand Total
Reply Date Method of Bid: Phone, email, fax, website, etc.
Phone Number
Delivery
Contact Date
Wisconsin Department of Administration State Bureau of Procurement
DOA-3088 (R11/2016)
Simplified Bidding Record Purchases over $5,000 through $50,000;
Printing, $50 through $50,000
Additional information (note the following as appropriate: bids rejected and why; preferences exercised; explain reason if less than 3 suppliers were contacted;
Email Address
Item Description QTY
Contact Person
Grand Total
MBE WC DVB MBE WC DVB MBE WC DVB
Date Agency/
Person Completing
Simplified Bid Number
Supplier Name & Address
Supplier ID Supplier ID Supplier ID
Supplier Name & Address
Supplier Name & Address
Req or Reference Number
Location
Simplified Bidding Record
DOA-3088 (R11/2016)
Unit Price Total Unit Price Total Total
Item Description QTY
Email Address
Grand Total Grand Total Grand Total
Contact Date
Contact Person
Phone Number
Reply Date
Delivery
Method of Bid: Phone, email, fax, website, etc.
MBE WC DVB MBE WC DVB MBE WC DVB
Supplier IDSupplier ID Supplier ID
Supplier Name & Address
Supplier Name & Address
Supplier Name & Address
Unit Price
Order Placed By: Tom Heydel, SE Region Traffic Ops Vendor Name: simplified and sealed bid
Project ID: 0082-02-00 Project Location: STH 38 at 4 mile road
Account Code: 5558 Installation Number: NA
Address for Delivery: SE Region , 141 NW Barstow Street
Waukesha, Wis
Contact for Delivery: Tom Heydel, WisDOT Traffic Ops 262-548-6763 or 414-750-1147 (cell)
Line # Contract # Commodity Code Description Unit Price Qty Total Price
1 0082-02-00 NA Furnish and install 2 crossroad warning sign beacon assemblies - solar powered 6,500.00$ 2 $13,000 furnish and install type 1 pole and type 2 footing per SDD 9E7-5 and 9C2-7 (see attached specification and drawings move Northbound static sign and post to left side of road remove Southbound static sign and turn over to sign shop
Grand Total $13,000
Purchase Order Request Form
From: Owen Wade To: Heydel, Tom - DOT Cc: owenwade@arborgreenwi.com Subject: RE: sth 38 at 4 mile road solar beacon assemblies with crossroad warning sign and speed plaque Qty = 2 Date: Friday, September 4, 2020 9:29:23 AM Attachments: image001.png image002.png Heydel Warning Beacons 9-4-20.pdf
Tom, Attached is Arbor Green’s quote for the associated work for this project.
Owen
From: Heydel, Tom - DOT [mailto:Tom.Heydel@dot.wi.gov] Sent: Monday, August 24, 2020 6:30 AM To: Undisclosed recipients:
Subject: sth 38 at 4 mile road solar beacon assemblies with crossroad warning sign and speed plaque Qty = 2 Importance: High
Bidders:
Attached find a request for bid (quote) to furnish and install solar beacon assemblies and crossroad warning signs with 45 advisory speed plaque at STH 38 at 4 mile road Includes moving northbound static sign and post and removing southbound static sign and post. Please put quote on your company quote form and fill out the attached purchase order request form with bid.
Please fill in the unit price for each warning sign assembly with solar beacon installation x 2 = Total bid.
Work completion time – 45 days
Quote is due in 14 days by close of business on Sept 8, 2020
Due to Covid we won’t be taking mailed quotes but rather send quote by email to me along with attachment quote and filled in unit price for each assembly for a complete system meeting all the requirements of the specifications and drawings
Attached are:
PO request form mailto:OwenWade@arborgreenwi.com mailto:Tom.Heydel@dot.wi.gov mailto:owenwade@arborgreenwi.com
Bidder qualifications Specs Aerial location maps SDD’s and details solar beacon warning sign assembly cadd drawing
Thank you
Tom
Tom Heydel, P.E SE Region Traffic and Design Engineer WISDOT SE Region 141 NW Barstow St Waukesha, Wisconsin 53187 262-548-6763 (office) 414-750-1147 (Cell phone) tom.heydel@dot.wi.gov mailto:tom.heydel@dot.wi.gov
Solar Beacons, signs, poles, footings and all incidentals
STH 38 at 4 mile Road in Racine County
Yellow Solar Beacons: Furnish and install a complete system. Furnish and install 2 - 12” yellow solar flashing beacons, type I poles, permanent signing, and footings and all incidentals as herein described. Move Northbound static sign to left side of roadway.
Remove southbound static sign. Work to be in accordance with Wisconsin Standard Highway specifications 2020 Edition and as herein provided.
Model 373-01299 (TAPCO) 12” yellow beacons with visor or approved equal solar powered beacons Qty = 2
Includes
• Solar Powered 24 hr flashing beacon system
• Powered single red beacon includes cabinet W/flasher controller, back panel, and associated wiring solar panel with mounting rack, batteries and red LED signal
• 1 sec 12 Yellow Vertical No lens poly cut vsr SA101 1C12YBB (yellow equivalent)
• BRKT Poly Yellow 2 FR1JPYW1 (yellow equivalent)
• Visors above beacons
• Solar panels
• Pole height to be minimum 13 foot long as shown on detail and per SDD 9 E 7-5.
• Mounting of beacon above diamond warning signs similar to SDD 9 E 7-5 except it is a 36 x 36 diamond crossroad warning sign (W2-1) and W13-1 (45 MPH ) plaque.
• 6 foot vertical clearance to bottom of W13-1sign measure from right edgeline pavement marking.
• Footing per SDD 9 C 2-7 type 2 concrete base
Solar panels shall face south.
Type I pole and type 2 concrete base furnished by this contractor or by their supplier.
Battery Autonomy is 12 days
Other materials and installation requirements incidental to this contract modification and are part of this contract:
• Furnish and install two W2-1, crossroad warning signs (36 x 36) and two W13-1 (45 MPH ) plaques as shown on miscellaneous quantities per state plates with the assembly for a complete system. Pedestals shall be aluminum breakaway pedestal based per SDD 9E 7-5 attached. Beacons above warning sign per detail included.
• Northbound – move the existing right side W2-1 and W13-1 (45 MPH) and wood post to the left side of the roadway for northbound traffic. Install the new type I pole assembly and new signs where existing right side signs are.
• Southbound – remove the existing right side W2-1 and W13-1 (45 MPH) and wood post. Install the new type I assembly and signs where existing signs are now. Leave the left side W2-1 and W13-1 as is.
• Work zone traffic control for shoulder or partial lane closures. See attached work zone details.
Construction methods:
Work shall be done during daytime hours and all roads kept open to traffic during construction operations.
The contractor shall have available at all times sufficient experienced personnel to promptly install, remove and reinstall the required traffic control devices and to route traffic in order to perform the operations.
The contractor shall provide 24-hour a day availability of equipment and forces to promptly restore barricades, lights, or other traffic control devices that are damaged or disturbed. In no case shall any barricade, light or other traffic control device be out of service for more than two hours. The cost to maintain and restore the above items shall be incidental and no additional payment will be made therefore.
No equipment, vehicles or construction materials shall be parked or stored within 20 feet of the edge of the traffic lane of any roadway during nonworking hours except at locations and periods of time approved by the engineer. At such locations, the material and equipment involved shall not constitute a hazard to the traveling public.
All construction vehicles shall yield to all through traffic at all locations. All contractor’s vehicles or equipment operating in the live traffic lanes shall be equipped with a hazard identification beam (Flashing yellow signal light, 8-inch minimum diameter). The flashing yellow light shall be activated when merging into or exiting a live traffic lane. The flashing yellow beam shall only be operated when entering or exiting traffic lanes or when parked or operating on shoulders.
The contractor shall not disturb, remove or obliterate any traffic control signs, advisory signs, shoulder delineators or beam guard in place along the traveled roadways without approval of the engineer.
The traffic requirements are subject to change at the direction of the engineer in the event of an emergency.
No operation shall proceed until all traffic control devices for such work are in the proper location.
For daytime work, channelizing devices such as 28-inch high cones or 18-inch high cones may be used in lieu of drums.
LCS:
Contractor responsible to input into the LCS (lane closure system) and notify WisDOT Traffic Operations (Tom Heydel, Rebecca Klein and Karen Martens)
Work restrictions:
Holidays
Drawings and detail included in this contract modification:
1. plan sheets (aerials) showing signing and beacons
2. SDD 9 E 7-5
3. SDD 9C 2-7
4. SDD 15 D 28-3
5. work zone flagger detail
6. State plates W2-1, W13-1, A4-3, A4-8, A4-11
7. Beacon installation detail
Contractor responsible to contact Diggers Hotline prior to installation.
Place the new solar beacon pedestals in the location shown on plans. If questions contact Tom Heydel.
Submit shop drawings/ cut sheets for approval:
Of beacon, pedestal, mounting hardware, batteries and solar panel to Tom Heydel for approval prior to start of work. Submit certificate of compliance letters for pole, beacon, mounting hardware and batteries.
1 year warranty, full parts and labor
Work to be completed in 45 days from award of contract purchase order
Office Contact: Tom Heydel, WISDOT 262-548-6763 or 414-750-1147 (cell)
N:spo/operations/signing/purchase orders/38 at 4 mile road/spec 8-14-20
M.P.H.
E
| Sheet1 |
| STH 38 at 4 mile road Racine county contractor cost proposal form (002).pdf |
| Purchase Order Form |
| STH 38 at 4 mile road Racine county contractor cost proposal form (002).pdf |
| Purchase Order Form |
| Agency: WisDOT, SE Region Traffic Operations , Waukesha, Wis |
| Person Completing: Tom Heydel |
| Item Number DescriptionRow1: Furnish and install solar beacon warning sign |
| QTYRow1: 2 |
| Unit PriceRow1: 6500 |
| TotalRow1: 13000 |
| Unit PriceRow1_2: |
| TotalRow1_2: 0 |
| Unit PriceRow1_3: |
| TotalRow1_3: 0 |
| Item Number DescriptionRow2: assemblies and type 2 footings |
| QTYRow2: |
| Unit PriceRow2: |
| TotalRow2: 0 |
| Unit PriceRow2_2: |
| TotalRow2_2: 0 |
| Unit PriceRow2_3: |
| TotalRow2_3: 0 |
| Item Number DescriptionRow3: STH 38 at 4 mile Road in Racine county |
| QTYRow3: |
| Unit PriceRow3: |
| TotalRow3: 0 |
| Unit PriceRow3_2: |
| TotalRow3_2: 0 |
| Unit PriceRow3_3: |
| TotalRow3_3: 0 |
| Item Number DescriptionRow4: |
| QTYRow4: |
| Unit PriceRow4: |
| TotalRow4: 0 |
| Unit PriceRow4_2: |
| TotalRow4_2: 0 |
| Unit PriceRow4_3: |
| TotalRow4_3: 0 |
| Item Number DescriptionRow5: |
| QTYRow5: |
| Unit PriceRow5: |
| TotalRow5: 0 |
| Unit PriceRow5_2: |
| TotalRow5_2: 0 |
| Unit PriceRow5_3: |
| TotalRow5_3: 0 |
| Item Number DescriptionRow6: |
| QTYRow6: |
| Unit PriceRow6: |
| TotalRow6: 0 |
| Unit PriceRow6_2: |
| TotalRow6_2: 0 |
| Unit PriceRow6_3: |
| TotalRow6_3: 0 |
| Item Number DescriptionRow7: |
| QTYRow7: |
| Unit PriceRow7: |
| TotalRow7: 0 |
| Unit PriceRow7_2: |
| TotalRow7_2: 0 |
| Unit PriceRow7_3: |
| TotalRow7_3: 0 |
| Item Number DescriptionRow8: |
| QTYRow8: |
| Unit PriceRow8: |
| TotalRow8: 0 |
| Unit PriceRow8_2: |
| TotalRow8_2: 0 |
| Unit PriceRow8_3: |
| TotalRow8_3: 0 |
| Item Number DescriptionRow9: |
| QTYRow9: |
| Unit PriceRow9: |
| TotalRow9: 0 |
| Unit PriceRow9_2: |
| TotalRow9_2: 0 |
| Unit PriceRow9_3: |
| TotalRow9_3: 0 |
| Item Number DescriptionRow10: |
| QTYRow10: |
| Unit PriceRow10: |
| TotalRow10: 0 |
| Unit PriceRow10_2: |
| TotalRow10_2: 0 |
| Unit PriceRow10_3: |
| TotalRow10_3: 0 |
| Item Number DescriptionRow1_2: |
| QTYRow1_2: |
| Unit PriceRow1_4: |
| TotalRow1_4: 0 |
| Unit PriceRow1_5: |
| TotalRow1_5: 0 |
| Unit PriceRow1_6: |
| TotalRow1_6: 0 |
| Item Number DescriptionRow2_2: |
| QTYRow2_2: |
| Unit PriceRow2_4: |
| TotalRow2_4: 0 |
| Unit PriceRow2_5: |
| TotalRow2_5: 0 |
| Unit PriceRow2_6: |
| TotalRow2_6: 0 |
| Item Number DescriptionRow3_2: |
| QTYRow3_2: |
| Unit PriceRow3_4: |
| TotalRow3_4: 0 |
| Unit PriceRow3_5: |
| TotalRow3_5: 0 |
| Unit PriceRow3_6: |
| TotalRow3_6: 0 |
| Item Number DescriptionRow4_2: |
| QTYRow4_2: |
| Unit PriceRow4_4: |
| TotalRow4_4: 0 |
| Unit PriceRow4_5: |
| TotalRow4_5: 0 |
| Unit PriceRow4_6: |
| TotalRow4_6: 0 |
| Item Number DescriptionRow5_2: |
| QTYRow5_2: |
| Unit PriceRow5_4: |
| TotalRow5_4: 0 |
| Unit PriceRow5_5: |
| TotalRow5_5: 0 |
| Unit PriceRow5_6: |
| TotalRow5_6: 0 |
| Item Number DescriptionRow6_2: |
| QTYRow6_2: |
| Unit PriceRow6_4: |
| TotalRow6_4: 0 |
| Unit PriceRow6_5: |
| TotalRow6_5: 0 |
| Unit PriceRow6_6: |
| TotalRow6_6: 0 |
| Item Number DescriptionRow7_2: |
| QTYRow7_2: |
| Unit PriceRow7_4: |
| TotalRow7_4: 0 |
| Unit PriceRow7_5: |
| TotalRow7_5: 0 |
| Unit PriceRow7_6: |
| TotalRow7_6: 0 |
| Item Number DescriptionRow8_2: |
| QTYRow8_2: |
| Unit PriceRow8_4: |
| TotalRow8_4: 0 |
| Unit PriceRow8_5: |
| TotalRow8_5: 0 |
| Unit PriceRow8_6: |
| TotalRow8_6: 0 |
| Item Number DescriptionRow9_2: |
| QTYRow9_2: |
| Unit PriceRow9_4: |
| TotalRow9_4: 0 |
| Unit PriceRow9_5: |
| TotalRow9_5: 0 |
| Unit PriceRow9_6: |
| TotalRow9_6: 0 |
| Item Number DescriptionRow10_2: |
| QTYRow10_2: |
| Unit PriceRow10_4: |
| TotalRow10_4: 0 |
| Unit PriceRow10_5: |
| TotalRow10_5: 0 |
| Unit PriceRow10_6: |
| TotalRow10_6: 0 |
| Item Number DescriptionRow11: |
| QTYRow11: |
| Unit PriceRow11: |
| TotalRow11: 0 |
| Unit PriceRow11_2: |
| TotalRow11_2: 0 |
| Unit PriceRow11_3: |
| TotalRow11_3: 0 |
| Item Number DescriptionRow12: |
| QTYRow12: |
| Unit PriceRow12: |
| TotalRow12: 0 |
| Unit PriceRow12_2: |
| TotalRow12_2: 0 |
| Unit PriceRow12_3: |
| TotalRow12_3: 0 |
| Unit PriceRow13_2: |
| TotalRow13_2: 0 |
| Unit PriceRow13_3: |
| TotalRow13_3: 0 |
| Contact Person: Owen Wade |
| Check Box6: Off |
| Email Address: owenwade@arborgreenwi.com |
| Contact Date: August 24, 2020 |
| Reply Date: |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Supplier Name Address 1: Arbor Green, 430 E. Albert Street, Portage, Wisconsin 53901 |
| Contact Person_4: |
| Contact Person_5: |
| Contact Person_6: |
| Email Address_4: |
| Email Address_5: |
| Email Address_6: |
| Contact Date_4: |
| Contact Date_6: |
| Contact Date_5: |
| Reply Date_4: |
| Reply Date_5: |
| Reply Date_6: |
| Delivery_5: |
| Delivery_6: |
| Contact Person_2: Brian Scharles |
| Email Address_2: brianS@tapconet.com |
| Contact Date_2: 7-22-19 |
| Reply Date_2: |
| Contact Person_3: Kuehne Company@aol.com |
| Email Address_3: kuehnecompany@aol.com |
| Contact Date_3: 7-22-19 |
| Reply Date_3: |
| Supplier Name Address_2: TAPCO, 5100 Brown Deer Road, Brown Deer, Wisconsin , 54223 |
| Supplier Name Address_3: Kuehne Company, 6830 S. Howell Ave, Oak Creek, Wisconsin 53154 |
| Supplier Name Address_6: |
| Supplier Name Address_5: |
| Supplier Name Address_4: |
| Date: Sept 10, 2020 |
| Phone: 608-742-0055 |
| Phone_2: 262-814-7306 |
| Phone_3: 414-764-4340 |
| Method of Bid: quotes due Sept 8, 2020 |
| Method of Bid_2: quotes due Sept 8, 2020 |
| Method of Bid_3: quotes due Sept 8, 2020 |
| Method of Bid_4: |
| Method of Bid_5: |
| Method of Bid_6: |
| Phone_6: |
| Phone_5: |
| Phone_4: |
| Delivery: |
| Delivery_2: |
| Delivery_4: |
| Delivery_3: |
| Grand Total_3: 0 |
| Grand Total_2: 0 |
| Grand Total: 13000 |
| Grand Total_5: 0 |
| Grand Total_4: 0 |
| Additional Comments: sent email to 3 bidders and requested quotes by 9-8-20. Received 1 quote simplied bid by email due to covid there was no sealed bit possible. Tapco and Kuehne did not bid |
| Req Number: |
| Simplified Bid Number: |
| SuppID: |
| SuppID_2: |
| SuppID_3: |
| SuppID_4: |
| SuppID_5: |
| SuppID_6: |
| Item Number DescriptionRow13: |
| Item Number DescriptionRow14: |
| Item Number DescriptionRow15: |
| QTYRow13: |
| QTYRow14: |
| QTYRow15: |
| Unit PriceRow13: |
| Unit PriceRow14: |
| Unit PriceRow15: |
| Unit PriceRow14_2: |
| Unit PriceRow15_2: |
| Unit PriceRow14_3: |
| Unit PriceRow15_3: |
| TotalRow13: 0 |
| TotalRow14: 0 |
| TotalRow15: 0 |
| TotalRow14_2: 0 |
| TotalRow15_2: 0 |
| TotalRow14_3: 0 |
| TotalRow15_3: 0 |
| Grand Total_6: 0 |
File details come from the government source that posted it. Updated .