This document is Addendum No. 1 for the Traffic Signal at FM1626 and Old Black Colony Rd project, issued by the City of Buda on March 31, 2025. The addendum modifies the original bid documents dated January 2025, updating the bid form cover sheet with a new bid number (FY25-170), revising quantities for barricades signs and traffic handling, and removing force account rows from the Basis of Bid Table. The bid is scheduled to be accepted until 2 PM on April 10, 2025, with a 5% bid bond requirement. The project involves constructing a new traffic signal and intersection improvements, with a construction duration of 126 calendar days from the Notice to Proceed, and final completion 30 days after substantial completion.
The addendum includes updates to plan sheets, general notes, and a summary of quantities, along with pre-bid meeting minutes and responses to contractor questions. Key clarifications include the city's willingness to pay for stored materials before installation, confirmation that TxDOT will provide signal timing and retain maintenance of the signal, and specification that the contractor must be certified to work on TxDOT projects. The pre-bid meeting notes indicate the project site is publicly accessible, utilities have been surveyed, and the city has obtained a Temporary Construction Easement from the Whispering Hollow HOA for storage and staging at the northeast corner of the intersection. The project has no HUB/DBE participation requirement, and work can be performed during regular hours, seven days a week, including holidays.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidding Requirements, Contract Forms & Conditions of the Contract
Addendum
8/22/2024 1 of 1 Addendum No. 1
ADDENDUM NO. 1
Date: March 31, 2025
Owner: City of Buda
Project Name: Traffic Signal at FM1626 and Old Black Colony Rd
This Addendum forms part of the Contract and clarifies, corrects, or modifies original bid Documents, dated January 2025. Acknowledge receipt of this addendum in the space provided on the bid form. Failure to do so may subject bidder to disqualification.
A. Project Manual:
1) Bid Form
• Replaced Bid Form cover sheet with updated bid number FY25-170.
• Updated quantity of Barricades Signs and Traffic Handling & removed force account rows from Basis of Bid Table
• Replaced Bid Bond cover sheet with updated bid number FY25-170.
B. Plan Sheet Revisions:
1) General Notes
• Item 503 notes revised
2) Summary of Quantities
• Updated quantity of Barricades Signs and Traffic Handling
C. Pre-Bid Meeting Minutes and Sign In Sheet
D. Response to Questions
This addendum consists of 1 page and 5 attachment(s).
Approved by Engineer
No. Bid Item Description Quantity Unit Unit Price Cost
1 0100-7002 PREPARING ROW 2 STA -$
2 0416-7043 DRILL SHAFT (TRF SIG POLE) (30 IN) 11 LF -$
3 0416-7044 DRILL SHAFT (TRF SIG POLE) (36 IN) 13 LF -$
4 0416-7046 DRILL SHAFT (TRF SIG POLE) (48 IN) 22 LF -$
5 0502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING 4 MO -$
6 0503-7001 PORTABLE CHANGEABLE MESSAGE SIGN 21 DAY -$
7 0505-7001 TMA (STATIONARY) 5 DAY -$
8 0505-7003 TMA (MOBILE OPERATION) 1 DAY -$
9 0618-7054 CONDT (PVC) (SCH 80) (2") 130 LF -$
10 0618-7060 CONDT (PVC) (SCH 80) (3") 170 LF -$
11 0618-7061 CONDT (PVC) (SCH 80) (3") (BORE) 960 LF -$
12 0620-7007 ELEC CONDR (NO.8) BARE 1,225 LF -$
13 0620-7008 ELEC CONDR (NO.8) INSULATED 1,145 LF -$
14 0620-7009 ELEC CONDR (NO.6) BARE 35 LF -$
15 0620-7010 ELEC CONDR (NO.6) INSULATED 70 LF -$
16 0624-7008 GROUND BOX TY D (162922)W/APRON 4 EA -$
17 0628-7169 ELC SRV TY D 120/240 070(NS)AL(E)SP(O) 1 EA -$
18 0644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) 1 EA -$
19 0644-7004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) 1 EA -$
20 0644-7073 REMOVE SM RD SN SUP&AM 1 EA -$
21 0666-7024 REFL PAV MRK TY I (W)8"(SLD)(100MIL) 505 LF -$
22 0666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) 62 LF -$
23 0666-7042 REFL PAV MRK TY I (W)(ARROW)(100MIL) 2 EA -$
24 0666-7066 REFL PAV MRK TY I (W)(WORD)(100MIL) 2 EA -$
25 0666-7132 REFL PAV MRK TY I(Y)(MED NOSE)(100MIL) 3 EA -$
26 0666-7347 PAVEMENT SEALER 6" 1,653 LF -$
27 0666-7348 PAVEMENT SEALER 8" 505 LF -$
28 0666-7352 PAVEMENT SEALER 24" 62 LF -$
29 0666-7353 PAVEMENT SEALER (ARROW) 2 EA -$
30 0666-7354 PAVEMENT SEALER (WORD) 2 EA -$
31 0666-7355 PAVEMENT SEALER (MED NOSE) 3 EA -$
32 0666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) 1,653 LF -$
33 0672-7002 REFL PAV MRKR TY I-C 26 EA -$
34 0672-7004 REFL PAV MRKR TY II-A-A 124 EA -$
35 0677-7001 ELIM EXT PAV MRK & MRKS (4") 1698 LF -$
36 0678-7002 PAV SURF PREP FOR MRK (6") 1653 LF -$
37 0678-7004 PAV SURF PREP FOR MRK (8") 505 LF -$
38 0678-7008 PAV SURF PREP FOR MRK (24") 62 LF -$
39 0678-7009 PAV SURF PREP FOR MRK (ARROW) 2 EA -$
40 0678-7016 PAV SURF PREP FOR MRK (WORD) 2 EA -$
41 0678-7024 PAV SURF PREP FOR MRK (MED NOSE) 3 EA -$
42 0678-7033 PAV SURF PREP FOR MRK (RPM) 150 EA -$
43 0680-7002 INSTALL HWY TRF SIG (ISOLATED) 1 EA -$
44 0682-7001 VEH SIG SEC (12")LED(GRN) 6 EA -$
45 0682-7002 VEH SIG SEC (12")LED(GRN ARW) 1 EA -$
46 0682-7003 VEH SIG SEC (12")LED(YEL) 6 EA -$
47 0682-7004 VEH SIG SEC (12")LED(YEL ARW) 2 EA -$
48 0682-7005 VEH SIG SEC (12")LED(RED) 6 EA -$
49 0682-7006 VEH SIG SEC (12")LED(RED ARW) 1 EA -$
50 0682-7037 BACKPLATE W/REFL BRDR(4 SEC) 1 EA -$
51 0682-7054 BACKPLATE W/REFL BRDR(3 SEC) 6 EA -$
52 0684-7031 TRF SIG CBL (TY A)(14 AWG)(5 CONDR) 1400 LF -$
53 0684-7033 TRF SIG CBL (TY A)(14 AWG)(7 CONDR) 350 LF -$
54 0686-7035 INS TRF SIG PL AM(S)1 ARM(32')LUM 1 EA -$
55 0686-7051 INS TRF SIG PL AM(S)1 ARM(48')LUM 1 EA -$
56 0686-7059 INS TRF SIG PL AM(S)1 ARM(55')LUM 1 EA -$
57 6005-7001 ITS COM CBL (ETHERNET) 100 LF -$
58 6007-7001 BBU SYSTEM (EXTERNAL BATT CABINET) 1 EA -$
59 6008-7001 RVDS (PRESENCE DETECTION ONLY) 3 EA -$
60 6008-7002 RVDS (ADVANCE DETECTION ONLY) 2 EA -$
61 0500-7001 MOBILIZATION 1 LS -$
Bid Total -$
CITY IS NOT RESPONSIBLE FOR FORMULAS OR CALCULATIONS PERFORMED IN OR ON THE BID FORM
City of Buda Old Black Colony Rd and FM1626 Signal Project Bid Form
Version: March 31, 2025
GENERAL NOTES
2 3
P
M
L e g a c y
E n g i n e e r i n g G r o u p
P D
E S
I G
N
P R
O J E
C T
S O l d
B l a c k
C o l o n y
R d
T r a f f i c S i g n a l
D e s i g n P l a n
S e t
G e n e r a l O
B C
G
E N
N
O T
E S
.d g n
FED.RD.
DIV.NO.
STATE
CONT. SECT. JOB
SHEET
HIGHWAY NO.
COUNTYDIST.
TEXAS AUS
PROJECT NO.
- - FM 1626-
HAYS
OLD BLACK COLONY RD
Texas Department of Transportation
R
ALL RIGHTS RESERVED
C 2025 TEXAS DEPARTMENT OF TRANSPORTATION
TBPE Firm Registration No. 20623
San Antonio, Texas 78230, 210.660.1960
7800 W Interstate 10, Suite 830, Legacy Engineering Group, PLLC
SHEET OF
All lanes will be open by noon of the day before the special events listed in below table. No closures will be allowed on Friday and the weekends for projects within 10 miles of these special events:
Table 5 (Special Events)
Event City Dates
Eaker BBQ Competition Fredericksburg March 10, 2024
Sherwood Forest Faire McDade / Paige Weekends in March and April
Smithville Jamboree Smithville April 4-6, 2024
Two Step Inn Georgetown April 20-24, 2024
Wiener Dog Races Buda April 27-28, 2024
Founders Day Festival Dripping Springs April 26-28, 2024
Red Poppy Festival Georgetown April 26-28, 2024
Crawfish Open Llano 3 rd
Friday and Saturday in April
Fair and Rodeo Liberty Hill May 18, 2023
Founders Day Ceremony Fredericksburg 2 nd
Weekend in May
Crawfish Festival Fredericksburg Saturday before Memorial Day
Lakefest Boat Races Marble Falls June 10-11, 2023
Watermelon Thump Luling Last Full Weekend in June
Pie in the Sky Kyle Sept 1-2, 2023
Wine and Music Festival Georgetown Last Saturday of September
Deer Season Opening Weekend All Counties in Burnet Area Office 1 st
Friday and Saturday of Season
Christmas Nights of FBG Lights Fredericksburg Nov 21, 2023
Christmas on Mercer Dripping Springs Dec 2, 2023
Lady of Guadalupe Procession Fredericksburg Dec 12, 2023
Texas State Graduation Fall San Marcos TBD
Texas State Graduation Spring San Marcos TBD
All the large and special events listed in the above tables occur annually. Coordinate with the Department and review the city/event website to plan around the future events.
To account for directional traffic volumes, begin and end times of closures may be shifted equally by the Engineer. The closure duration will remain. Added compensation is not allowed.
One-way traffic control, including work performed under Item 510, must be set up to provide a maximum of 20 minutes of delay to the traveling public.
Submit an emailed request for a lane closure (LCN) to TxDOT. The email will be submitted in the format provided. Receive concurrence prior to implementation. Submit a cancellation of lane closures a minimum of 18 hours prior to implementation.
Blanket requests for extended periods are not allowed. Max duration of a request is 2 weeks prior to requiring resubmittal.
Provide 2-hour notice prior to implementation and immediately upon removal of the closure.
For roadways listed in Table 1: Submit the request 96 hours prior to implementation.
For roadways not listed in Table 1: Submit the request a minimum of 48 hours prior to the closure and by the following deadline immediately prior to the closure: 11A on Tuesday or 11A on Friday.
For all roadways: Submit request for traffic detours and full roadway closures 168 hours prior to implementation. Submit request for nighttime work 96 hours to implementation date.
Cancellations of accepted closures (not applicable to full closures or detours) due to weather will not require resubmission in accordance with the above restrictions if the work is completed during the next allowable closure time.
Closures that conflict with adjacent contractor will be prioritized according to critical path work per latest schedule. Conflicting critical path or non-critical work will be approved for first LCN submitted. Denial of a closure due to prioritization or other reasons will not be reason for time suspension, delay, overhead, etc.
Meet with the Engineer prior to lane closures to ensure that sufficient equipment, materials, devices, and workers will be used.
Take immediate action to modify current and future traffic control, if at any time the queue becomes greater than 20 minutes.
Consider inclement weather prior to implementing the lane closures. Do not set up traffic control when the pavement is wet.
Cover, relocate, or remove existing small, large, and overhead signs that conflict with traffic control. Cover large and overhead signs to remain using latest standard TS-CD. This work is subsidiary.
Install all permanent signs, delineation, and object markers required for the operation of the roadway before opening to traffic.
Use of temporary mounts is allowed or may be required until the permanent mounts are installed or not impacted by construction. Maintain the temporary mounts. This work is subsidiary.
Place a 28-inch cone, meeting requirements of BC (10) and Ty III barricades, on top of foundations that have protruding studs.
This work is subsidiary.
Vertical panels used on roadways with speed limit 55mph or greater must be round in shape or have a self-righting mechanism.
The "flat" or "oblong" shaped vertical panels are not allowed.
A series of sequential flashing warning lights, per BC(7), must be installed in a merging taper for long term stationary TCP. This includes all TCP setups, such as those shown on the plans or TCP setups per the standards.
Edge condition treatment types must be in accordance with the TxDOT standard. Installation and removal of a safety slope is subsidiary.
To determine a speed limit or an advisory speed limit, submit a request to TxDOT 60 business days prior to manufacture of the sign.
For non-site-specific signal projects, 2 months of barricades will be paid per work order location.
The Contractor Force Account "Safety Contingency" that has been established for this project is intended to be utilized for work zone enhancements, to improve the effectiveness of the Traffic Control Plan, that could not be foreseen in the project planning and design stage. These enhancements will be mutually agreed upon by the Engineer and the Contractor's Responsible Person based on weekly or more frequent traffic management reviews on the project. The Engineer may choose to use existing bid items if it does not slow the implementation of enhancement.
Business access signs will be paid using safety continency. Install as directed by the Engineer. Company logos will not be permitted on the signs. Maintenance of the signs will be subsidiary to Item 502.
ITEM 503 - PORTABLE CHANGEABLE MESSAGE SIGN
Place PCMS 10 calendar days prior to begin work stating "Road Work Begin Soon, Contact 832-7000 For Info".
Place PCMS at time of LCN request. Place the PCMS at the expected end of queue caused by the closure. When the closure is active, revise the message to reflect the actual condition during the closure, such as "RIGHT LN CLOSED XXX FT".
ITEM 505 - TRUCK MOUNTED ATTENUATOR AND TRAILER ATTENUATOR
The TMA/TA used for installation/removal of traffic control for a work area will be subsidiary to the TMA/TA used to perform the work.
The contractor will be responsible for determining if one or more operations will be ongoing at the same time to determine the total number of TMA/TA required for the work. TMA/TAs paid by the day is full compensation for all worksite locations during an entire day.
TMA/TAs used to protect damaged attenuators will be paid by the day using the force account item for the repair.
ITEMS 600s & 6000s - ITS, TOLLING, LIGHTING, SIGNING, MARKINGS, AND SIGNALS
Meet the requirements of the NEC, Texas MUTCD, TxDOT standards, and TxDOT Standard Specifications. Notify the Engineer if existing elements to remain do not meet code or specification.
Provide all service, equipment and material required to provide a functional item and interface with existing equipment and software.
For signals and illumination contact Robert Bolin (Robert.Bolin@txdot.gov) and Kevin Plumlee (Kevin.Plumlee@txdot.gov).
For ITS contact Doug Turner (Douglas.L.Turner@txdot.gov) and Kevin Plumlee (Kevin.Plumlee@txdot.gov).
Use the TxDOT provided form to submit an electrical, illumination, and signal checklist prior to request for signal activation or a punch list.
Provide a 14-day advance email notice to the Engineer to request illumination or traffic signal punch list inspection.
All items must be completed per the plans prior to traffic signal activation including deficiencies found in the punch list.
Provide a 14-day advance notice prior to planned traffic signal activation. Send notice by email to Kevin.Plumlee@txdot.gov, Robert.Bolin@txdot.gov, Rick.Thomas@txdot.gov, Gabriela.Perales@txdot.gov, and the Project Engineer.
The contractor must have a qualified technician and a representative from the controller and detection supplier on the project site to place the traffic signals in operation.
For existing traffic signals, provide a 14-day advance email notice to the Engineer with Contractor signal technician contact information and signal locations prior to working or assuming operations of illumination or traffic signal.
Provide a 60-day advance email notice to the Engineer to request signal timing if timing is not provided in the plans.
Provide a 180-day advance email notice to the Engineer for equipment to be provided by TxDOT.
Provide equipment that requires TxDOT programming, etc. to TxDOT 180 days in advance.
Prior to relief of maintenance, a Test Period is required for signals and ITS equipment in accordance with Item 680.3.1.7.
Response time to reported trouble calls shall be less than 2 hours.
Complete repairs within 24 hours. Notify the Engineer and maintain a logbook in the controller cabinet of each trouble call. Do not clear the error log in the conflict monitor without approval.
ITEM 618 - CONDUIT
Shift the locations of conduit and ground boxes to accommodate field conditions. Install conduit not exceeding 2 feet in any direction from a straight line. Install conduit at a minimum depth of 2 ft. below finished grade. Installation of the conduit by jacking or boring method will be at a depth of at least 1 ft. below subgrade.
Install a high tension, non-metallic pull rope in all empty conduit runs. This work is subsidiary.
Use a coring device, not a hammer drill, when drilling holes through concrete structures.
Structurally mounted junction boxes will be as shown on the plans. When used for traffic signal installations, these boxes will be
12" x 12" x 8". This work is subsidiary.
For underground conduit, smooth wall schedule 40 equivalent HDPE can be substituted for schedule 40 PVC. For SCH 80 bore conduits, a schedule 40 equivalent HDPE carrier pipe of adequate size to carry the proposed conduits can be used as substitute.
HDPE must transition to RMC/PVC per ED (11)-14.
When using existing conduit, ensure that all conduits have bushings and cleaned of dirt, mud, grease, and other debris. Re-strap existing or relocated conduit per the specification. This work is subsidiary.
Abandoned underground conduit must have all conductors removed.
ITEM 620 - ELECTRICAL CONDUCTORS
Provide 10-amp time delay fuses.
For Pedestal Poles (Item 687), provide single-pole breakaway disconnects.
Install a minimum size 8 AWG equipment grounding conductor (EGC) in all conduits including loop detectors and traffic signal cables. Payment and the size of the EGC will be in accordance with standard ED (3)-14 note 12.
Permanently mark "Illumination" on the luminaire conductors installed inside a traffic signal pole. Make the marks easily visible from the hand hole.
ITEM 624 - GROUND BOXES
Aggregate for fill under the box will be crushed, have a maximum size of 2 in., minimum size of ½ in., and requirements per Item
302 are waived.
ITEM 628 - ELECTRICAL SERVICES
Contact the utility company upon execution of contract and prior to the pre-construction meeting to make arrangements for all work and materials provided by the utility company. Contact AUS_Auditors@txdot.gov for account approval and information.
Accounts shall be placed in the name of TxDOT.
Revision No. 1 - 3/31/2025, Addendum 111
SUMMARY OF QUANTITIES
2. PROJECT IS NOT LOCATED WITHIN THE FEMA FLOODPLAIN.
PARTS AND LABOR WILL BE SUBSIDIARY TO BID ITEM 680 7002.
1. CELLULAR MODEM WILL BE PROVIDED BY TXDOT AUS DISTRICT SIGNAL SHOP.
NOTE:
P
M
L e g a c y
E n g i n e e r i n g G r o u p
P D
E S
I G
N P
R O
J E
C T
S O l d B l a c k C o l o n y R d T r a f f i c S i g n a l
D e s i g n P l a n S e t G e n e r a l O
B C
G
E N
S
U M
Q
T Y
R
E V
.d g n
FED.RD.
DIV.NO.
STATE
CONT. SECT. JOB
SHEET
HIGHWAY NO.
COUNTYDIST.
TEXAS AUS
PROJECT NO.
- - FM 1626-
HAYS
OLD BLACK COLONY RD
Texas Department of Transportation
R
ALL RIGHTS RESERVED
C 2025 TEXAS DEPARTMENT OF TRANSPORTATION
TBPE Firm Registration No. 20623
San Antonio, Texas 78230, 210.660.1960
7800 W Interstate 10, Suite 830, Legacy Engineering Group, PLLC
SHEET OF 1 1
SUMMARY OF WORK ZONE TRAFFIC CONTROL ITEMS
ITEM NO. 100 500 502 503 505 505
DESCRIPTION CODE 7002 7001 7001 7001 7001 7003
LOCATION
PREPARING
ROW
MOBILIZATION
BARRICADES,
SIGNS AND
TRAFFIC
HANDLING
PORTABLE
CHANGEABLE
MESSAGE
SIGN
TMA
(STATIONARY)
TMA (MOBILE
OPERATION)
STA LS MO DAY DAY DAY
FM 1626 & OLD BLACK COLONY RD 2 1 2 21 5 1
PROJECT TOTALS 2 1 2 21 5 1
SUMMARY OF SIGNING & PAVEMENT MARKINGS ITEMS
ITEM NO. 644 644 644 666 666 666 666 666 666 666 666 666 666
DESCRIPTION CODE 7001 7004 7073 7024 7036 7042 7066 7123 7132 7347 7348 7352 7353
SHEET NO.
IN SM RD
SN SUP&AM
TY10BWG
(1)SA(P)
IN SM RD
SN SUP&AM
TY10BWG
(1)SA(T)
REMOVE
SM RD SN
SUP&AM
REFL PAV
MRK TY I
(W)8"(SLD)
(100MIL)
REFL PAV
MRK TY I
(W)24"(SLD)
(100MIL)
REFL PAV
MRK TY I
(W)(ARROW)
(100MIL)
REFL PAV
MRK TY I
(W)(WORD)
(100MIL)
REFL PAV
MRK TY I
(Y)24"(SLD)
(100MIL)
REFL PAV
MRK TY I (Y)
(MED NOSE)
(100MIL)
PAVEMENT
SEALER 6"
PAVEMENT
SEALER 8"
PAVEMENT
SEALER 24"
PAVEMENT
SEALER
(ARROW)
EA EA EA LF LF EA EA LF EA LF LF LF EA
1 2 1 1 105 62 1 1 54 2 458 105 116 1
2 400 1 1 1 1195 400 1
PROJECT TOTALS 2 1 1 505 62 2 2 54 3 1653 505 116 2
TRAFFIC SIGNAL EQUIPMENT SUPPLIED BY CONTRACTOR PER TXDOT APPROVAL AND PAID BY FORCE ACCOUNT
DESCRIPTION UNIT TOTAL QTY.
1 TRAFFIC SIGNAL CONTROLLER EA 1
2 TRAFFIC SIGNAL CABINET EA 1
3 MANAGED HARDENED ETHERNET SWITCH EA 1
4 POWER SUPPLY (FOR SWITCH) EA 1
5 CCTV CAMERA EA 1
SUMMARY OF SIGNING & PAVEMENT MARKINGS ITEMS
ITEM NO.
DESCRIPTION CODE
SHEET NO.
PROJECT TOTALS
666 666 666 672 672 677 678 678 678 678 678 678 678
7354 7355 7423 7002 7004 7001 7002 7004 7008 7009 7016 7024 7033
PAVEMENT
SEALER
(WORD)
PAVEMENT
SEALER
(MED NOSE)
REFL PAV
MRK TY I
(Y)6"(SLD)
(100MIL)
REFL
PAV MRKR
TY I-C
REFL
PAV MRKR
TY II-A-A
ELIM EXT
PM & MRKS
(4")
PAV SURF
PREP FOR
MRK (6")
PAV SURF
PREP FOR
MRK (8")
PAV SURF
PREP FOR
MRK (24")
PAV SURF
PREP FOR
MRK
(ARROW)
PAV SURF
PREP FOR
MRK
(WORD)
PAV SURF
PREP FOR
MRK
(MED NOSE)
PAV SURF
PREP FOR
MRK
(RPM)
EA EA LF EA EA LF LF LF LF EA EA EA EA
1 2 458 6 52 448 458 105 116 1 1 2 58
1 1 1195 20 72 1250 1195 400 1 1 1 92
2 3 1653 26 124 1698 1653 505 116 2 2 3 150
SUMMARY OF TRAFFIC SIGNAL ITEMS
ITEM NO. 416 416 416 618 618 618 620 620 620 620 624 628 680 682 682 682
DESCRIPTION CODE 7043 7044 7046 7054 7060 7061 7007 7008 7009 7010 7008 7169 7002 7001 7002 7003
LOCATION
DRILL SHAFT
(TRF SIG POLE)
(30 IN)
DRILL SHAFT
(TRF SIG POLE)
(36 IN)
DRILL SHAFT
(TRF SIG POLE)
(48 IN)
CONDT (PVC)
(SCH 80) (2")
CONDT (PVC)
(SCH 80) (3")
CONDT (PVC)
(SCH 80) (3")
(BORE)
ELEC CONDR
(NO.8) BARE
ELEC CONDR
(NO.8)
INSULATED
ELEC CONDR
(NO.6) BARE
ELEC CONDR
(NO.6)
INSULATED
GROUND BOX
TY D
(162922)W/A
PRON
ELC SRV TY D
120/240
070(NS)AL(E)
SP(O)
INSTALL HWY
TRF SIG
(ISOLATED)
VEH SIG SEC
(12")LED(GRN)
VEH SIG SEC
(12")LED(GRN
ARW)
VEH SIG SEC
(12")LED(YEL)
LF LF LF LF LF LF LF LF LF LF EA EA EA EA EA EA
FM 1626 & OLD BLACK COLONY RD 11 13 22 130 170 960 1225 1145 35 70 4 1 1 6 1 6
PROJECT TOTALS 11 13 22 130 170 960 1225 1145 35 70 4 1 1 6 1 6
SUMMARY OF TRAFFIC SIGNAL ITEMS
ITEM NO.
DESCRIPTION CODE
LOCATION
FM 1626 & OLD BLACK COLONY RD
PROJECT TOTALS
682 682 682 682 682 684 684 686 686 686 6005 6007 6008 6008 6018
7004 7005 7006 7037 7054 7031 7033 7035 7051 7059 7001 7001 7001 7002 7001
VEH SIG SEC
(12")LED(YEL
ARW)
VEH SIG SEC
(12")LED(RED)
VEH SIG SEC
(12")LED(RED
ARW)
BACKPLATE
W/REFL
BRDR(4 SEC)
BACKPLATE
W/REFL
BRDR(3 SEC)
TRF SIG CBL
(TY A)(14
AWG)(5
CONDR)
TRF SIG CBL
(TY A)(14
AWG)(7
CONDR)
INS TRF SIG PL
AM(S)1
ARM(32')LUM
INS TRF SIG PL
AM(S)1
ARM(48')LUM
INS TRF SIG PL
AM(S)1
ARM(55')LUM
ITS COM CBL
(ETHERNET)
BBU SYSTEM
(EXTERNAL
BATTERY
CABINET)
RVDS
(PRESENCE
DETECTION
ONLY)
RVDS
(ADVANCE
DETENTION
ONLY)
CCTV FIELD
EQUIP
(DIGITAL)
(INSTL ONLY)
EA EA EA EA EA LF LF EA EA EA LF EA EA EA EA
2 6 1 1 6 1400 350 1 1 1 100 1 3 2 1
2 6 1 1 6 1400 350 1 1 1 100 1 3 2 1
Revision No. 1 - 3/31/2025, Addendum 11
Traffic Signal at FM 1626 and Old Black Colony Rd Pre-Bid Meeting
M a r c h 2 7 , 2 0 2 5
March 27, 2025
2:00 – 3:00pm
Buda City Hall, 405 E. Loop Street
Multi-Purpose Room
Project Description: The City of Buda proposes to improve the intersection at FM1626 and Old Black Colony Rd with the installation of a traffic signal, striping, and signals. The scope of the project includes intersection improvements.
1. Welcome
a. Project Team & Introduction
b. Pre-bid meeting is non-mandatory
2. Review of Project
a. Project Location
b. Constraints & Considerations
3. Bid Documents Available: www.bidnet.com, www.publicpurchase.com
4. Addenda will only be offered through the procurement websites listed above.
a. Formal questions may be submitted to the City of Buda via the Q&A portal online at:
https://app.smartsheet.com/b/form/ea33b2963e864a24b7697f5e3985d564.
b. Questions received less than seven days prior to the date for opening of Bids may not be answered.
c. Only questions answered by Addenda will be binding.
d. Deadline for questions is April 3, 2025 at 2pm
5. Bids Due Date and Location:
a. City of Buda City Hall
b. Attn: Purchasing Bid Box
c. 405 E. Loop St., Bldg. 100
d. Buda, Texas 78610
e. Write “SEALED BID” with the Bid Number: IFB # FY25-170, Bid Name:
TRAFFIC SIGNAL AT FM 1626 AND OLD BLACK COLONY RD, and Due
Date on the outside of the bid package.
f. Bids will be accepted until 2 PM, April 10, 2025 when bids will be publicly opened and read aloud.
g. 5% Bid Bond is required
h. Acknowledge all addenda
i. See Article 7, Page 7 of the Issued for Bid PDF for all required documentation.
6. Bid award
a. The contract will be awarded to the lowest responsible bidder or bidder that provides the best value.
b. Lowest responsible bidder will be based on the lowest total for the bid schedule.
c. If Owner awards the contract for the Work, such award shall be to the responsible Bidder who, in the opinion of the Owner, is best capable of performing the work. The evaluation will be based on the price; the bidder’s experience and reputation; the quality of the bidder’s goods or services; the bidder’s proposed personnel; and whether the bidder’s financial capability is appropriate to the size and scope of the project. The Owner reserves the right to reject any or all bids and to waive any and all informalities in bidding.
d. Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
e. If the bidder identifies missing elements, it is encouraged to identify/call out those elements during the question and answer period of the advertisement phase.
7. Requirements
a. HUB/DBE Participation Requirement: 0%
b. Project Restrictions:
i. Work at the Site shall be performed during regular working hours, Sunday through Saturday, including all holidays, regardless of weather conditions, material availability, or other conditions not under the control of the Contractor.
c. Permitting required: ______________________________________
8. Construction Duration:
a. Input on Notice to Proceed (NTP) from potential bidders.
b. Substantially completed within 126 calendar days of NTP
c. Final completion 30 days after Substantial Completion
d. 1-year warranty or as specified in the specifications for specific components.
9. Material Testing – the City of Buda’s subcontractor will perform material testing.
Contractor will need to coordinate directly with the City Inspection Project Manager and follow testing procedures/directions provided. City will pay for required material tests, but the Contractor is required for all additional retests due to initial failed tests.
a. See bid documents for technical specifications.
10. Inspections – City Inspection PM/Contact
Name: City Inspector
Contact:
11. Team Comments
a. K Friese Comments
i. Project Site is publicly open and available to visit.
ii. Utilities surveyed and shown in the plans, but contractor shall call
OneCall (811) and confirm utility locations prior to field activities and construction.
iii. Geotechnical investigation and report available on request.
iv. Construction area limits and requirements within public ROW, TxDOT and City
v. Construction site safety importance and Contractor to follow TxDOT requirements.
b. City Staff Comments
i. Staging and Storing Area: The City has obtained a Temporary
Construction Easement from the Whispering Hollow HOA to allow the contractor to use the northeast corner of the intersection for storage and staging.
12. TxDOT Comments
13. Q&A
a. Received Contractor questions to date
b. Any additional questions?
TRAFFIC SIGNAL AT FM1626 AND OLD BLACK COLONY RD
PRE-BID CONFERENCE SIGN IN SHEET
Date: March 27, 2025
Time: 2:00 PM
Location: City of Buda
Multipurpose Room
405 E. Loop St
Buda, Texas 78610
Name Company Phone Email
Megan Skoglund K Friese + Associates 737-270-8523 MSkoglund@KFriese.com
Austin Messerli K Friese + Associates 512-338-1704 AMesserli@KFriese.com Kenny Crawford City of Buda 512-523-8894 Kenneth.Crawford@budatx.gov
AJ Goodson City of Buda 512-523-8894 Alexander.Goodson@budatx.gov
Edward Dempsey City of Buda 512-523-8894 Edward.Dempsey@budatx.gov
Construction Questions Received
#1 3/13/2025 The Bid form, at the bottom, last three items (62A-62B-62C) are for the force account work which is usually addressed after the bid on a force account payment basis. Can these three items be removed from the bid form for transparency? If not, can the City put a dollar figure in for these 3 items so all bids are treated the same? Request for information
3/31/2025 These items will be removed from the Bid Form and updated in an addendum.
#2 3/13/2025 Bid item 5 has a qty of 5 months. Is the 5 months inclusive of lead time delivery of materials plus signal construction? If so, what is the expected breakout of Material procurement - ? Construction activation of Signal - ? If poles take 18 weeks for delivery, that will leave 1/2 month for installation.
Perhaps a schedule can be provided showing the intent? Request for information
3/31/2025 BARRICADES, SIGNS AND TRAFFIC HANDLING duration will be updated to 4 months for only construction time and not procurement. This will be updated in an addendum.
#3 3/13/2025 Will the City pay for stored materials before they are installed? Request for Information
3/31/2025 Yes, the city will pay for materials on hand.
#4 3/13/2025 Bid Item 6 Is this for (1) PCMS to be on the project continually for 21 days? If not, what is the intent? If 1 for each of the 3 directions for 7 days prior to turn on, will every PCMS be paid for each day it's on site? Request for information
3/31/2025 The intent is for 3 PCMS to be on-site, 1 for each of the 3 directions for 7 days prior to the signal turn-on and paid by each day. General Note referencing placement of the PCMS 10 days prior will be removed in an addendum.
#5 3/13/2025 Why do you have specifications in the bid docs for work normally associated with Road construction, etc...? Why do you have specifications in the bid docs for things like: Item 614
HIGH MAST Item 688 - Ped Detection Item 687 - Ped pole assemblies Item 650 - OVHD Sign
Support? Item 625 - Span Wire? It seems like a majority of TxDot spec book is in the bid docs which is very confusing. Request for Information 3/31/2025 The general notes in the plans only have bid item general notes for the work pertinent to the work in the construction plans. Specifications referenced by project specific specifications are included in the manual.
#6 3/13/2025 After the 30 day test period is successfully completed, who will assume maintenance, TxDoOT or City of Buda? Will the contractor need to execute and pay for a two year maintenance bond? If a contractor has to pay for a maintenance bond, will they be reimbursed via ( Force Account) by City of
Buda? Request for Information.
3/31/2025 TxDOT retains maintenance of the signal and not the City.
#7 3/13/2025 I see a phasing diagram in the plans on sheet 28 Who is responsible for the initial timings? Can a signal timing plan be added to the plans?
3/31/2025 TxDOT will provide signal timing.
#8 3/13/2025 Is this the TXDOT questionnaire that states our company is certified to bid TXDOT jobs? I am not seeing anything on the city website about a form like this. Please advise.
3/31/2025 The contractor shall be certified and approved to work on TxDOT projects.
TxDOT’s Confidential Questionnaire can be found here on TxDOT’s website:
https://www.txdot.gov/business/road-bridge-maintenance/contract-letting/contractor-prequalification.html
#9 3/19/2025 This question concerns the pre printed Bid Bond sheet - Can you please confirm the correct FY number for this project? Page 1 shows FY25-170 but pages 14 and 26 (bid bond form) show FY24-
3/31/2025 The Bid Form and Bid Bond form should say FY25-170. However, we will accept the form as is with the old number, FY24-294. A new form may be issued with the addendum, but either will be accepted at bid opening.
City of Buda - FM1626 at Old Black Colony Rd Signal
3/31/2025 1 of 1