BDC23-24-25 Addendum #2.pdf
PDF 208 KB Posted
- Solicitation number
- ITB-10673
- Issued by
- Leon County, Florida
About this file
This document is Addendum #2 to the Florida Department of Environmental Protection's (DEP) Bid No. BDC23-24/25 for the Fort Zachary State Park Beach Renourishment project. The addendum notifies bidders of revisions to the construction drawings to align with the U.S. Fish and Wildlife Service's Sand-Placement Statewide Biological Opinion, including adjustments to the foreshore beach slope and a reduction in the total bid volume of sand from 5,000 CY to 4,600 CY. The revised plans are incorporated into the bid package and supersede the original documents. Bidders are instructed to include a signed acknowledgment of receipt of this addendum with their bid submission.
The document provides details on accessing the revised bid package on the DEP's public website and contact information for the DEP's Contracts Section for any questions. Aside from the noted revisions, the contract documents remain in full force and effect.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP Bid No. BDC23-24/25, Addendum #2, Page 1 of 2
FLORIDA DEPARTMENT OF
Environmental Protection
Marjory Stoneman Douglas Building
3900 Commonwealth Boulevard Tallahassee, FL 32399
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
October 18, 2024
NOTICE TO APPLICANTS
ADDENDUM NO. TWO (2)
Fort Zachary State Park- Beach Renourishment
DEP BID NO. BDC23-24/25
TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED
PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH
YOUR BID SUBMISSION.
NOTICE
It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Brandon Williams, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Boulevard, MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.
Signature of Contractor and Date
The following statements supersede & supplement the corresponding items in the specifications & drawings:
The Construction Drawings have been modified to align with U.S. Fish and Wildlife (FWS) Sand-Placement Statewide Biological Opinion (SPBO). The foreshore beach slope as been adjusted from 3:1 (horizontal: vertical) to 4:1. The cross-sections shown on the drawings have been adjusted and the total bid volume for sand has been reduced from 5,000 CY to 4,600 CY, accordingly. All fill is to remain above the High Tide Line. The changes are marked on Sheet CM-2.0, CM-3.0, CM-3.1, CM-3.2, and CM-3.3. The revised plans are hereby incorporated into the bid package and supersede those originally posted with the bid documents. The revised bid package can be found at publicfiles.dep.state.fl.us - /DRP/BDC/BDC Public Files FY24-25/BDC23-24- 25_Fort_Zachary_-_Beach_Renourishment/. Please contact the Bureau of Design and Construction’s Contracts Section at Brandon.D.Williams@FloridaDEP.gov with any questions.
https://publicfiles.dep.state.fl.us/DRP/BDC/BDC%20Public%20Files%20FY24-25/BDC23-24-25_Fort_Zachary_-_Beach_Renourishment/ https://publicfiles.dep.state.fl.us/DRP/BDC/BDC%20Public%20Files%20FY24-25/BDC23-24-25_Fort_Zachary_-_Beach_Renourishment/ mailto:Brandon.D.Williams@FloridaDEP.gov
DEP Bid No. BDC23-24/25, Addendum #2, Page 2 of 2
In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.