This is an Addendum No. 1 to Request for Proposals (RFP) BCS 2026-02 issued by the State of Maryland for statewide bridge condition inspections and load ratings. The addendum modifies the original solicitation for condition inspection services covering routine, complex, underwater, and movable bridge types, including structural, mechanical, and electrical system evaluations. Deliverables encompass structural evaluations, load ratings, analyses, nondestructive testing, inspection reports, charts, tables, sketches, and engineering recommendations, along with all engineering services necessary to prepare designs, plans, and specifications for bridge repairs. The original solicitation was posted November 5, 2026, with responses due January 11, 2027. Field work includes coordinating and conducting inspections using under-bridge inspection vehicles and bucket trucks, as well as overseeing maintenance of traffic operations for related lane closures throughout Maryland.

The addendum document contains modifications or clarifications to the original RFP terms and conditions. These amendments may address contractor qualifications, technical requirements, insurance and bonding requirements, project scheduling, inspection procedures, deliverable specifications, or other contractual provisions. The scope of work remains statewide within Maryland, with performance requirements applicable to all bridge types specified in the original solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MARYLAND STATE HIGHWAY ADMINISTRATION

OFFICE OF PROCUREMENT AND CONTRACT MANAGEMENT

CONSULTANT SERVICES DIVISION

707 NORTH CALVERT STREET

BALTIMORE, MARYLAND 21202

November 27, 2026

Contract No.: BCS 2026-02 Description: Bridge Condition Inspections and Load Ratings of Routine, Complex, Underwater and Moveable Bridges, Statewide

REQUEST FOR TECHNICAL PROPOSAL ADDENDUM NO. 1

To All Prospective Offerors:

Please be advised that the Technical Proposal delivery date for this contract is 12:00 PM (NOON) on January 11, 2026. Technical Proposals received after the deadline will not be accepted no matter how they have been transmitted.

This addendum is being issued on the Request for Technical Proposal for BCS 2026-02. All prospective Offerors must acknowledge the clarifications, revisions, additions and/or deletions listed below for this Addendum No. 1 by signing, dating and attaching this addendum in the front of their submittal. Failure to attach this signed and dated Addendum No. 1 in the submittal may result in rejection.

RED LINE REVISIONS (RLR)

Please note the following Red Line Revisions for the Request for Technical Proposal:

RLO1:

Key Staff 1: A Professional Engineer (PE) registered in the State of Maryland with a minimum of ten (10) years experience managing bridge inspection projects while employed by the Prime/JV, who will serve as the Project Manager and the Primary Liaison.

RLR1:

Key Staff 1: A Professional Engineer (PE) registered in the State of Maryland with a minimum of ten (10) years experience managing bridge inspection projects currently employed by the Prime/JV, who will serve as the Project Manager and the Primary Liaison.

Contract No: BCS 2026-02 Addendum No. 1 Bridge Condition Inspections and Load Ratings of Routine, Complex, Underwater and Moveable Bridges, Statewide

CONSULTANT QUESTIONS

Q1: Key Staff #1 requirements In the requirements for Key Staff #1, it states "experience managing bridge inspection projects while employed by the Prime/JV," Does this mean that we cannot fill this position with someone who has relevant experience managing bridge inspection projects, but all those projects were performed while the person was with another firm?

A1: See RLR1 above.

Q2: Key Staff 1: "A Professional Engineer (PE) registered in the State of Maryland with a minimum of ten (10) years experience managing bridge inspection projects while employed by the Prime/JV, who will serve as the Project Manager and the Primary Liaison." Please clarify if this means that Key Staff 1 must have been working with the JV for 10 years?

A2: See RLR1 above.

Q3: iv. SF 330 Section F – Example Projects: If JV partners each hold the same state contract, is it acceptable to combine them into one Example Project?

A3: Yes, it is acceptable for joint venture partners that have the same contract to combine their example project into one example project submission.

Q4: H. Proposal Affidavits: the Investment Activities in Iran certification is included in the bid/proposal affidavit. Please clarify if only item K is required or if the entire Bid Proposal Affidavit should be submitted.

A4: All offerors are required to complete the BID/ Proposal Affidavit in its entirety.

Q5: Paragraph D Section iv. SF 330 Section F – Example Projects: Question – Can a project that began beyond the five year limit but ended within the past five years be used as an example project?

A5: Yes, offerors can submit an example project that began beyond the five year limit but ended within the past five years.

Q6: Key Staff #1 On Page 11 of the RFP, the Key Staff 1 requirement states that the individual must have a “minimum of ten (10) years’ experience managing bridge inspection projects while employed by the Prime/JV.” Would SHA consider striking the words “while employed by the Prime/JV” and replacing the statement with “Individual must have a minimum of ten (10) years’ experience managing bridge inspection projects. Key Staff 1 must be employed by the Prime/JV.”

A6: See RLR1 above.

Underwater and Moveable Bridges, Statewide

Q7: Can the font size for the page headers and footers be less than 10 point?

A7: No, the font size for page headers and footers cannot be less than 10 points.

Q8: For SF 330 Sec. F Example Projects: Given that each example project is limited to one page and the information required in Block 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT may take up many lines if a large team is involved, would SHA consider letting Block 25 of the SF 330 Sec. F form roll to a second page? If so, can the entire Block 25 appear on a second page?

A8: Per page 12 section iv. Example projects are “limited to one (1) example project per page for a total not to exceed three (3) pages”.

Q9: Is the organizational chart included in the 30% score for Key Staff?

A9: The organizational chart is not scored.

Q10: Is the support personnel matrix included in the 30% score for Key Staff?

A10: The support personnel matrix is not scored.

Q11: Please confirm that the Subcontractors’ Letters of Commitment do not need to indicate DBE status, MDOT certification number, percentage of total work, and applicable NAICS codes.

A11: Per the RFP and the provision on the Interim Final Rule on DBE programs, The NAICS code and percentage of work will not be required.

Q12: Confirm the questions deadline is 12:00 PM Eastern on Nov 19, and confirm whether answers/addenda will be posted on eMMA and the SHA Consultant Services Center page before the Jan 11 due date.

A12: Per the RFP page 2, all questions concerning submissions and procedures must be submitted via emma.maryland.gov no later than November 19, 2026, at 12:00 pm. Yes, an addendum with answers to offerors questions will be posted on SHA’s homepage and eMMA before January 11, 2026, due date submissions of Technical Proposals.

Q13: Underwater inspection: confirm whether KS4 (Bridge Inspection Team Leader) must personally hold an underwater inspection qualification, or whether a separate ADCI-certified commercial diver / underwater team leader may satisfy the underwater scope; and whether the Underwater Bridge Inspection Diver classification in the Time Distribution (15%) implies a dedicated diver classification on the team.

A13: KS4 does not have to be a diver. The time distribution implies that underwater inspections will be required, so an NBIS qualified diver must be available https://emma.maryland.gov

Underwater and Moveable Bridges, Statewide through the contract, but not necessarily serving as key staff.

Q14: Load rating software: confirm AASHTOWare BrR is the required platform and whether an alternative SHA-approved software may be used; confirm whether SHA provides BrR licenses or the consultant must hold its own.

A14: BrR is the required platform for bridge types that are compatible with BrR.

We are not asking firms to acquire it immediately, but over the next few months to years, we intend to begin assigning load ratings. Firms that have proficiency and resources to perform BrR ratings would be the firms that would receive load rating assignments. SHA is not providing the licenses;

however, AASHTOWare offers the single station license at a 50% discount if the software is only used for Maryland bridges. If a firm is doing BrR work for more than 1 state, the discounted license would not be advantageous.

Q15: Bentley ProjectWise / AssetWise: confirm whether SHA provides access/licenses for staff working at the Office of Structures (§11 says SHA provides computer equipment and programs — does that extend to ProjectWise/AssetWise licenses?), and whether proposing an alternative data-storage platform is acceptable.

A15: Projectwise is not needed. SHA will provide access to Assetwise, this is not a cost to consultants.

Q16: Emergency response: §2 says emergency response "possibly within 4 hours of notification" — confirm whether a 4-hour mobilization is a contractual requirement, whether it applies statewide including after-hours/weekends, and how emergency task orders are issued and paid.

A16: While expected to be rare, emergency response 24/7, 365 days a year is a contractual requirement. The 4 hours is a guideline intended to ensure that your emergency response staff is not 6 hours away in North Carolina (for example). Emergency task orders are issued and paid like any other task order, with required paperwork handled retroactively.

Q17: On-site staff: confirm which Key Staff are expected on-site at SHA facilities, and for what proportion of the contract

A17: No Key Staff are expected on-site in SHA’s offices. There could be situations in which we request an engineer to assist temporarily on-site, but this is expected to be unlikely.

Q18: MOT / access equipment: §5 says MOT, underbridge cranes, and bucket trucks are supplied by the consultant "as needed," but also notes the SHA OOS MOT/access equipment contract "may be provided" in some cases — confirm when SHA provides vs. consultant provides, and whether those costs are direct expenses under §12.

Underwater and Moveable Bridges, Statewide

A18: When SHA provides the MOT or access equipment, it is provided to the consultant without charge, provided the consultant adheres to all processes and procedures required by OOS. There is no guarantee that SHA will provide any MOT or equipment, but our goal is to provide it as resources allow. If a firm elects to procure their own MOT and access equipment, this is invoiced as a direct expense in the contract. Some situations in which consultants may elect to or be required to procure their own MOT and/or access equipment would be inspection of bridge spans over rail, unique access requirements or increased scheduling flexibility.

Q19: Time Distribution: confirm whether the percentages in §9F are fixed or may be adjusted by the proposer to reflect its team structure.

A19: The percentages provided in the Time Distribution are estimates and they are not contractually set amounts.

Q20: Key Staff: confirm KS3 and KS4 may be employed by a subconsultant (ad states yes) and whether a single individual may fill more than one Key Staff role.

A20: Per the RFP Kesy Staff 3 and 4 may be employed by the Prime/Joint-Venture or employed by any of the Subconsultants. A single individual cannot fill more than one Key Staff role

Q21: Example projects (§F): confirm whether example projects must be SHA/MDOT projects or whether any relevant bridge inspection / load rating work within the past 5 years qualifies, and whether subconsultant projects may be included.

A21: The example projects do not have to be SHA/MDOT projects. There is no prohibition against subconsultant projects being included.

Q22: DBE: the ad cites Title VI / 49 CFR 26 with no percentage goal stated — confirm whether a DBE goal applies to this contract and whether DBE participation is evaluated.

A22: The Title VI of Civil Rights Act of 1964 is a mandatory paragraph on the RFP however, the requirement for DBE will not be applicable on this RFP.

Q23: Price proposals: confirm the timing and format for price proposals for the highest-rated firms (invitation after technical rating), and whether Certified Payroll Rosters / overhead documentation (MDOT Modes letter or annual CPA overhead audit per FAR Part 31) are submitted with the technical proposal or only at the price stage.

A23: Offerors are not being requested to provide price proposals at this time. Only the Firms that submit the highest rated Technical Proposal will be requested to submit price proposals

Q24: 1.Question: The RFP states “Electrical and Mechanical inspections for movable

Underwater and Moveable Bridges, Statewide bridges may be requested, but represent a small percentage of the overall contract needs.” Are teams expected to show mechanical and electric inspection capabilities in their proposal, or can teams use a mechanical / electrical inspection vendor as a direct cost if they are assigned a movable bridge inspection?

A24: As movable bridges are a part of this contract, the proposal would be expected to indicate an understanding of these requirements and an acknowledgement of the ability to perform the work if needed. A mechanical/electrical inspection vendor could be utilized via direct cost if circumstances required. As this represents a relatively small portion of the contract, you will not be penalized for not having mechanical or electrical staff listed in your proposal.

Q25: 2.We intend to submit our proposal as a Joint Venture (JV) between two firms and note that the solicitation requires identification of an eMMA Vendor Number. Could you please clarify whether the proposal may be submitted under the existing eMMA Vendor Profile and Vendor Number of one of the Joint Venture partner firms, provided the proposal clearly identifies the Joint Venture relationship.

A25: SHA will accept the eMMA vendor number for each Joint Venture partner in the Transmittal Letter.

Q26: 3.On page 8, evaluation factor items (a) through (h) include "Scope of Services" and "Example Projects" evaluated as Acceptable, Unacceptable, or Neutral, whereas on page 12, Section F notes that Example Projects become part of the rating/evaluation criteria. Could SHA explain how items (a) through (h) interact with the weighted scores (Written Technical Questions 40%, Key Staff 30%, Work Plan 30%)?

A26: Per page 8, section 8 Evaluation Criteria; “the following items will be rated as either one of the following:

• (A) Acceptable-Response demonstrates they meet requirements

• (U) Unacceptable-Response fails to demonstrate they meet requirements

• (N) Neutral-Lacks prior SHA experience. Not a barrier to award

a. Scope of Services;

b. Example Projects”

THE SIGNED ADDENDUM MUST BE INCLUDED IN THE REQUEST FOR TECHNICAL

PROPOSAL IN FRONT OF THE TRANSMITTAL LETTER

November 25, 2026 Oluwaseun Yerokun, Acting Director Date Office of Procurement and Contract Management

Acknowledgement of Receipt of Addendum No. 1 for BCS 2026-02

Underwater and Moveable Bridges, Statewide

Firm Name Signature-Authorized Official Title Date

General questions relating to this Addendum No. 1 may be directed to OPCM@mdot.maryland.gov . The time period for questions has expired; therefore, no additional questions will be accepted or answered by State Highway Administration.

mailto:OPCM@mdot.maryland.gov

REQUEST FOR TECHNICAL PROPOSAL ADDENDUM NO. 1
RED LINE REVISIONS (RLR)
RLR1:
CONSULTANT QUESTIONS
A1: See RLR1 above.
A2: See RLR1 above.
A3: Yes, it is acceptable for joint venture partners that have the same contract to combine their example project into one example project submission.
A4: All offerors are required to complete the BID/ Proposal Affidavit in its entirety.
A5: Yes, offerors can submit an example project that began beyond the five year limit but ended within the past five years.
A6: See RLR1 above.
A7: No, the font size for page headers and footers cannot be less than 10 points.
A8: Per page 12 section iv. Example projects are “limited to one (1) example project per page for a total not to exceed three (3) pages”.
A9: The organizational chart is not scored.
A10: The support personnel matrix is not scored.
A11: Per the RFP and the provision on the Interim Final Rule on DBE programs, The NAICS code and percentage of work will not be required.
A12: Per the RFP page 2, all questions concerning submissions and procedures must be submitted via emma.maryland.gov no later than November 19, 2026, at 12:00 pm. Yes, an addendum with answers to offerors questions will be posted on SHA’s homepage and...
A13: KS4 does not have to be a diver. The time distribution implies that underwater inspections will be required, so an NBIS qualified diver must be available
A14: BrR is the required platform for bridge types that are compatible with BrR. We are not asking firms to acquire it immediately, but over the next few months to years, we intend to begin assigning load ratings. Firms that have proficiency and resou...
A15: Projectwise is not needed. SHA will provide access to Assetwise, this is not a cost to consultants.
A16: While expected to be rare, emergency response 24/7, 365 days a year is a contractual requirement. The 4 hours is a guideline intended to ensure that your emergency response staff is not 6 hours away in North Carolina (for example). Emergency task...
A17: No Key Staff are expected on-site in SHA’s offices. There could be situations in which we request an engineer to assist temporarily on-site, but this is expected to be unlikely.
A18: When SHA provides the MOT or access equipment, it is provided to the consultant without charge, provided the consultant adheres to all processes and procedures required by OOS. There is no guarantee that SHA will provide any MOT or equipment, but...
A19: The percentages provided in the Time Distribution are estimates and they are not contractually set amounts.
A20: Per the RFP Kesy Staff 3 and 4 may be employed by the Prime/Joint-Venture or employed by any of the Subconsultants. A single individual cannot fill more than one Key Staff role
A21: The example projects do not have to be SHA/MDOT projects. There is no prohibition against subconsultant projects being included.
A22: The Title VI of Civil Rights Act of 1964 is a mandatory paragraph on the RFP however, the requirement for DBE will not be applicable on this RFP.
A23: Offerors are not being requested to provide price proposals at this time. Only the Firms that submit the highest rated Technical Proposal will be requested to submit price proposals
A24: As movable bridges are a part of this contract, the proposal would be expected to indicate an understanding of these requirements and an acknowledgement of the ability to perform the work if needed. A mechanical/electrical inspection vendor could...
A25: SHA will accept the eMMA vendor number for each Joint Venture partner in the Transmittal Letter.
THE SIGNED ADDENDUM MUST BE INCLUDED IN THE REQUEST FOR TECHNICAL PROPOSAL IN FRONT OF THE TRANSMITTAL LETTER
Acknowledgement of Receipt of Addendum No. 1 for BCS 2026-02