This document contains construction and finish specifications for a pavilion building project at Baconton Community Charter School. The project encompasses a comprehensive educational facility requiring masonry construction for exterior walls, with gymnasium walls featuring masonry extending 10 feet above finished floor and durable wall finish to ceiling for remaining height. The specification details flooring requirements across multiple spaces, including finished concrete for the gymnasium, both art rooms, AG Mechanics, and welding room; carpet tiles for the music room; epoxy flooring for bathrooms; and vinyl flooring for remaining areas. Drop-down ceilings will be installed in all classrooms and offices except the High School Art Room, AG Mechanics, and Welding Room. The facility requires complete fire sprinkler systems, HVAC equipment, comprehensive electrical installation with lighting and outlets, and network infrastructure with data hookups throughout designated areas to support school technology needs.

The specifications indicate that room layouts, dimensions, and finish selections remain flexible and subject to coordination with Baconton Community Charter School prior to construction finalization, provided all changes remain within the overall building footprint and comply with applicable building codes. The project requires all necessary systems, finishes, and infrastructure to support the facility's intended use as an educational facility. No specific pricing terms, contract duration, due dates, or set-aside information are provided in this specifications document.

View the file

Other files

File Type Posted
vinyl floor.jpg JPG image
bathroom floor.pdf PDF
BCCS_StrPlan_Stamped_6_9_26.pdf PDF
Proposed layout and piping diagram (3).pdf PDF
Baconton request for proposals.docx DOCX document
bathroom stalls.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BACONTON COMMUNITY CHARTER SCHOOL

Pavilion Building – Construction and Finish Specifications

1. Walls and Masonry The entire building will be constructed and finished with masonry.

Gymnasium walls will have masonry extending 10 feet above the finished floor.

The remaining gymnasium wall space above the 10-foot masonry section will receive a durable wall finish extending to the ceiling.

2. Flooring Flooring finishes will be as follows:

Gymnasium: Finished concrete.

Both Art Rooms: Finished concrete.

Music room: Carpet tiles.

AG Mechanics: Finished concrete.

Welding Room: Finished concrete.

All Bathrooms: Epoxy flooring.

All Remaining Areas: Vinyl flooring.

3. Ceilings Drop-down ceilings will be installed in all classrooms and offices.

The following areas will not have drop-down ceilings:

High School Art Room AG Mechanics Welding Room

4. Fire Protection The building will be equipped with a complete fire sprinkler system.

All necessary equipment and components will be provided to meet applicable fire and building codes.

5. Heating, Ventilation, and Air Conditioning (HVAC) The building will be equipped with all necessary HVAC equipment and systems.

Heating, cooling, and ventilation will be provided throughout the building to accommodate the intended use of each space.

6. Electrical Complete electrical installation throughout the building.

All necessary lighting, outlets, switches, panels, wiring, and electrical connections will be provided.

Electrical systems will be designed to accommodate the building's intended use and equipment requirements.

7. Network and Technology Network infrastructure and necessary data hookups will be provided throughout the building.

Classrooms, offices, and other designated areas will have the necessary network connections to support school technology needs.

8. Room Layout and Dimensions Classroom, office, and storage closet sizes are subject to change based on the school's needs.

Room dimensions and layouts may be adjusted to maximize the available building space and best accommodate the school’s intended use.

All layout changes must remain within the overall building footprint and comply with applicable building codes and requirements.

9. General Project Requirements The completed building will include all necessary systems, finishes, and infrastructure required for its intended use as an educational facility. Final room layouts, dimensions, and finish selections will be coordinated with Baconton Community Charter School before construction is finalized.