BCC 2823 Addendum #2.pdf
PDF 121 KB Posted
- Attached to
- Campus Wide Security Upgrade
- Solicitation number
- 79-806-202404
- Issued by
- Brunswick County, Durham City, North Carolina
About this file
This document is an Addendum #2 for a Request for Proposal (RFP) issued by Bladen Community College for a Campus Wide Security Upgrade project. The addendum provides clarifications and additional requirements for the project, including recommendations for cost-saving measures, camera and access control system specifications, power and wiring requirements, and project closeout documentation. The college is seeking to upgrade security entry locks, cameras, and other hardware campus-wide to enhance safety for employees and students. All existing equipment must be replaced with new hardware and software that has a minimum useful life of 10 years. The project does not fall under the Davis-Bacon wage schedule, and the college currently uses the Alertus Technologies system, which must be compatible with any proposed solutions.
Regarding pricing and other terms, the addendum specifies that all change orders will be processed through Interscope, and the winning bidder must have a user role to do so. The college requests a service and maintenance agreement for the camera and access control systems, with a 2-hour response time for reported issues. Contractors are required to provide all necessary labor, including the removal of existing equipment, patching, and disposal, as well as ensure proper functioning of handicap door controllers. The college will handle any repairs to faulty doors before the work begins.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7418 NC Highway 41 West Post Office Box 266
Dublin, North Carolina 28332 Phone: 910.879.5500
Fax: 910.879.5564 www.bladencc.edu
ADDENDUM #2
October 17, 2024
Project Name: Campus Wide Security Upgrade Owner: Bladen Community College
BCC Project #: 2823
From: BCC
Luis Araujo laraujo@bladencc.edu Raymond Watson rwatson@bladencc.edu
To: All RFP holders
Message: Bidders are hereby informed that the following additions, deletions, changes and clarifications supersede and supplement the Contract Documents for the above referenced project. It forms a part of the previously RFP dated
September 17, 2024.
Clarifications
1. The RFP calls for any bidding contractors to recommend the College any potential savings on the overall project.
2. A contractor noted that some cameras are pointed in the same direction hallways.
Dual-vision cameras can be substituted to save on overall cost.
3. This project does not fall under Davis-Bacon wage schedule.
4. Bladen Community College currently uses Alertus Technologies (Formerly known as
Regroup). We ask that any proposals be compatible with this system.
5. The college requests for cameras to have motion recording rather than continuous. No current cameras are to be reused, all are to be replaced.
6. Door schedule will be collaboratively worked on between the college and the contractor.
7. Active directory users and groups are to be integrated.
8. A specific battery backup time requirement for the Access Control System is recommended to be 4-24 hours.
9. Besides the ability for readers to have mobile credential capability, the college asks for a mobile phone app for the proxy card reader technology.
10. Card readers can be installed next to handicap motorized buttons depending on location. Some are hardwired, others are not.
11. The college cannot provide a 120V power supply where needed, but most locations have a duplex with one opening for use.
mailto:laraujo@bladencc.edu mailto:rwatson@bladencc.edu
7418 NC Highway 41 West Post Office Box 266
Dublin, North Carolina 28332 Phone: 910.879.5500
Fax: 910.879.5564 www.bladencc.edu
12. Magnetic door locks and latch guards are not acceptable.
13. Contractors are to submit bids with documents in this order: Informal Contract, RFP, Addendum #1 and #2.
14. New camera system is to be installed on Bladen Community College’s network. Cloud network to be accessible for off-campus viewing.
15. Current cameras use CAT6 cable. Open air wiring is not acceptable, conduit is preferred to match wall color.
16. Minimum amount of days required for video storage is 30 days.
17. The minimum frame rate for recording is 4k.
18. A combination of mobile access and badges are preferred for door access entry. Fobs are to be considered as an alternate.
19. The college requires the ability to give local authorities access to the system.
20. Additional cameras are to be determined as well as Bluetooth credentials.
21. All necessary labor including removal of equipment, patching & repairing, and disposal will be part of the contractor’s duty. Safe conditions are required for local employees and students.
22. It will also be the contractor’s responsibility to ensure doors close properly before completion of work as well as all costs associated with handicap door controllers.
23. BCC will handle any repairs of faulty doors required before work begins.
24. College requests contractor to quote a service/maintenance agreement for the camera system and access control system. Upon reporting a system issue, the college expects a 2-hour interval for follow up calls.
25. Contractor will be responsible for all permits and inspections with local authority having jurisdiction (ahj).
26. All change orders will be done through Interscope. Winning bidder must have a user role to process these with owner.
27. Any modifications to insurance and the contract will be discussed with winning bidder.
28. For project closeout, contractor is to include certificate of compliance, certificate of completion, and any other documents required for state construction closeout.
29. Final closeout documents can be found at Final closeout documents.
END OF ADDENDUM #2
https://www.doa.nc.gov/divisions/state-construction-office/forms-documents#Tab-ProjectCloseout-7343