This is an Invitation for Bid (IFB) issued by Bristol County Agricultural High School for the K9 Center Roofing and Fascia Replacements, Window and Door Trim Replacement, and Vinyl Siding project. The bid is scheduled for release on July 28, 2025, with a site visit and campus tour planned for August 4, 2025, at 9:00 AM. Questions from potential bidders must be submitted by August 7, 2025, at 9:00 AM, and sealed bids are due on August 13, 2025, at 9:00 AM, with the bid opening at 9:15 AM. The project involves comprehensive renovations including complete removal of existing roofing materials, installation of new underlayment, ice and water shield, drip edge, flashing, and shingles (Certainteed's Driftwood architectural style), as well as removal and replacement of existing siding with vinyl cedar impressions in Dairy Barn gray.

The project requires a DCAMM Prime Contractor Certification in Roofing, and bidders must provide a bid security of 5% of the total bid price. The contract includes provisions for prevailing wage rates, minority and women-owned business enterprise (MBE/WBE) participation goals of 10.4%, and mandatory OSHA safety training. Contractors must maintain comprehensive liability insurance, including workers' compensation, comprehensive general liability, automobile liability, and umbrella coverage. The successful bidder will be required to furnish performance and payment bonds each equal to 100% of the contract price, with a substantial completion deadline of September 30, 2025, and liquidated damages of $1,000 per day for delays beyond this date.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bristol County Agricultural High School

Date: July 28, 2025

INVITATION TO BID

K9 Center, Roofing & Fascia Replacements, Window and Door Trim Replacement and Vinyl Siding

Bids Due August 13, 2025 at 9:00AM at the Bristol County Agricultural High School Business Office | Standish House 28 Center Street, Dighton Ma. 02715

KEY DATES

Event Date Day Time RFP Available 07/28/2025 Mon 9:00AM Site visit and Campus Tour of the Facilities 08/04/2025 Mon 9:00AM Deadline for Questions 08/07/2025 Thurs 9:00AM

Deadline for Bids 08/13/2025 Wed 9:00AM

Bid Opening 08/13/2025 Wed 9:15AM

TABLE OF CONTENTS

Number of Pages

Part A - Bidding and Contract Requirements

Section 00020 - Invitation to Bid 3 Pages Section 00100 - Instructions to Bidders 11 Pages Section 00300 - Form of General Bid 5 Pages Section 00500 - Agreement 15 Pages Section 00610 - Performance Bond 3 Pages Section 00620 - Payment Bond 2 Pages Section 00700 – General Conditions Section 00800 - Supplemental Conditions 4 Pages Section 00850 - Excerpts from Applicable State Law 1 Page Attachment A – Wage Rates Attachment B - Drawing and Pictures 1 Page

Part B – Technical Specifications

Division 01 - General Requirements Section 01 01 00 Summary of Work No Pages Section 01 29 00 Measurement and Payment. No Pages Section 01 31 00 Project Management & Coordination. No Pages Section 01 32 00 Regulatory Requirements No Page Section 01 33 00 Submittal Requirements. No Pages Section 01 40 00 Quality Requirements No Pages Section 01 50 00 Const. Facilities & Temp. Controls No Pages Section 01 60 00 Product Requirements No Pages Section 01 77 00 Contract Closeout No Pages

Division 02 – Existing Conditions 02 08 00 Asbestos Abatement - Roofing No Pages 02 41 00 Demolition No Pages

Division 3 (Not Used)

Division 04 – Masonry 04 05 00 Masonry Restoration No Pages

Division 5 (Not Used)

Division 06 – Wood, Plastic and Composites 06 10 63 Carpentry No Pages

Division 07 – Thermal and Moisture Protection 07 22 00 Insulation No Pages 07 55 00 Roofing & Flashing No Pages 07 72 00 Roof Accessories No Pages

Division 8 Through Division 21 (Not Used)

Division 22 – Plumbing 22 00 01 Roof Drains No Pages

Division 23 – HVAC 23 00 01 Temporary Mechanical Disconnects No Pages

Division 26 – Electrical 26 00 01 Temporary Electrical Disconnects No Pages

SECTION 00020

INVITATION FOR BIDS

Sealed bids for furnishing the following item will be received at the Business Office | Standish House 28 Center Street, Dighton Ma. 02715, until the time specified below at which time the bids will be publicly opened and read:

ITEM

K9 Center Roofing and Fascia Replacements, Window and Door Trim and Vinyl Siding

BID OPENING: August 13, 2025@ 9:15AM Each Bid must be accompanied by a bid security consisting of a BID BOND, CASH, or, CERTIFIED CHECK issued by a responsible bank or trust company in the amount of 5% of the bid price.

Specifications and bid forms may be obtained electronically by visiting the Bristol County Agricultural High School website. Copies of the documents may be obtained from the

Pre-Bid Conference and Site Visit will be held at the Bristol County Agricultural High School, 135 Center Street Dighton Ma. 02725 on Monday, August 4, 2025 at 9:00AM

A performance bond in an amount equal to 100 percent of the total amount of the contract price with a surety company qualified to do business in the Commonwealth of Massachusetts will be required for the faithful performance of the contract, as well as a labor and materials bond in an amount equal to 100 percent of the total contract price.

All bids for this project are subject to applicable public bidding laws of Massachusetts, including G.L. c.149, § §44A through 44H, as amended.

Attention is directed to the minimum wage rates to be paid as determined by the Commissioner of Labor and Workforce Development and the weekly payroll record submittal requirements under the provisions of Massachusetts General Laws, Chapter 149, Section 26 through 27D inclusive.

Attention is further directed to the requirements of G.L. c.149, §44D requiring submission of a Division of Capital Asset Management approved Certificate of Eligibility and Update Statement with all bids. The DCAMM Prime Contractor Certification shall be ROOFING.

Selection of the contractor will be based upon bidder qualifications, including evidence of past performance in similar projects, and bid price. The contract will be awarded to the bidder deemed by the awarding authority to be the lowest responsible and eligible bidder.

The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of the bids.

The Campus reserves the right to waive any informalities, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the Campus.

The Campus at Bristol County Agricultural High School By: Ryan Miranda, Facilities Director

SECTION 00100

INSTRUCTIONS TO BIDDERS

1. Receipt and Opening of Bids

The Campus of Bristol County Agricultural High School, herein called the Owner or Awarding Authority, acting by and through its Campus Manager, will receive sealed Bids for the project known as:

K9 Center Building Roofing and Fascia Replacements, Window and Door Trim and Vinyl Siding

This Project is subject to the public bidding statutes, G.L. c. 149, §§44A-44H. General bids addressed to the Campus Manager and endorsed "Bid for K9 Center Roof Replacement and Vinyl Siding Project at Bristol County Agricultural High School" will be received at the Business Office of the until 9:00 a.m. prevailing time, on August 13, 2025 at which time and place said bids will be publicly opened and read aloud.

Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified will not be considered. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids.

2. Location and Work to be Done

Removal:

● Complete removal of existing roofing materials, including shingles, underlayment, flashing, drip edge, and any damaged sheathing or substructures.

Preparation:

● Nail down any loose nails in the roof sheathing.

● Prepare the roof surface to receive new roofing materials.

● Contingency cost per sqft for repairs

Installation:

● Install new underlayment (synthetic underlayment)

● Install new ice and water shield (as per local code and manufacturer recommendations).

● Install new drip edge flashing.

● Install new flashing around chimneys, vents, and other roof penetrations.

● Replace any damaged sheathing or substructures.

● Install pipe boots and chimney boots.

● Vent roof according to 780 CMR

Flat roof

● Clean and restore existing pvc membrane with flat roof coating (urethane-silicone, white)

Materials : Shingles Certainteed’s Driftwood architecturals, Drip edge Elevate’s (formerly Firestone) Charcoal Gray

Siding Scope of Work:

Removal:

● Complete removal of existing siding materials.

● Complete removal of window and door trim

Preparation:

● Prepare the wall surface for new siding installation.

● This may include repairs to the wall sheathing, installation of house wrap, or other weatherproofing measures.

● Contingency cost per sqft for repairs

Installation:

● Install new siding materials (vinyl cedar impressions, Color to match Dairy Barn gray).

● Install new trim and accessories.

● Ensure proper clearances between siding and other elements like roofing.

● Install new pvc trim around doors

● Siding to abutt to windows

Final Touches:

● Caulking and sealing of all seams and edges.

● Clean up of the work area.

Soffit and Gutter system Color: Elevate’s (formerly Firestone) Charcoal Gray

● Remove existing gutters

● Install new fascia and Trim at rakes and gables (PVC assembly)

● Install new gutter system with splash blocks at downspouts (Match existing campus gutters)

The location, general characteristics, and principal details of the Work are indicated as above.

Please refer to Attachment ‘B” for additional information

Additional drawings showing details in accordance with which the Work is to be done may be furnished by addendum from time to time during the bidding period by the Owner or its Architect/Engineer, and shall then become a part of the Contract Documents.

The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified.

The Work to be done and paid for under any item shall not be limited to the exact extent mentioned or described but shall include all incidental work necessary or customarily done for the completion of that item.

3. Preparation of Bid

Each bid must be submitted on the prescribed form. All blank spaces for bid prices must filled in, in ink or typewritten, in both words and figures.

Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his address, and endorsed with the name of the project as specified in Receipt and Opening of Bids, above. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in Receipt and Opening of Bids, above.

4. Bid Opening Procedure

The following list of requirements shall apply to each filed bid. Bids not meeting all the requirements for timeliness and security will be rejected; bids not meeting signature and addenda requirements will be rejected prior to checking of bid amounts.

Bids shall be filed at the place and before the time specified in Receipt and Opening of Bids, above.

Properly executed bid security shall be placed in a sealed envelope and shall be attached to the outside of the envelope containing the bid.

Bid signatures will be checked.

All addenda will be sent by e-mail to all prospective bidders. The total dollar amount of each bid will be read.

5. Modification

Any bidder may modify his bid by written communication at any time prior to the scheduled closing time for receipt of bids. Any telegraphic communication must be received by the Owner prior to the closing time, and provided further, the Owner must be satisfied that a written confirmation of the telegraphic modification over the signature of the bidder was mailed prior to the closing time. If written confirmation is not received within two days from the closing time, no consideration will be given to a telegraphic communication.

The communication shall not reveal the bid price but shall provide the addition or subtraction or other modification so that the final prices or terms will not be known by the Owner until the sealed bid is opened.

6. Ability and Experience of Bidder

No award will be made to any bidder who cannot satisfy the Owner that he has sufficient ability and experience in this class of work and sufficient capital and plant to enable him to prosecute and complete the work successfully within the time named. The Owner's decision or judgment on these matters will be final, conclusive, and binding.

The Owner may make such investigations as it deems necessary, and the bidder shall furnish to the Owner, under oath if so required, all such information and data for this purpose as the Owner may request.

7. Conditions of Work

Each bidder must familiarize himself fully with the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of his obligation to furnish all material and labor necessary to carry out the provisions of his contract. Insofar as possible the Contractor, in carrying out his work, must employ such methods or means as will not cause any interruption of or interference with the work of any other Contractor.

8. Addenda and Interpretations

No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally. All information given to bidders other than by means of the plans, specifications, or by addenda, as described below, is given informally and shall not be used as the basis of a claim against the Owner.

Every request for such interpretation should be in writing addressed to Ryan Miranda Director of Facilities Bristol County Agricultural High School 135 Center Street Dighton Ma. 02725 , and to be given consideration must be received at least seven days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, when issued, will be emailed to all prospective bidders (at the respective email address furnished by them for such purposes).

Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents.

9. Security for Faithful Performance

Simultaneously with his delivery of the executed Contract, the Contractor shall furnish a surety bond or bonds as security for faithful performance of this contract and for the payment of all persons performing labor and materials under this contract as specified in

Section 00700, GENERAL CONDITIONS included herein. The surety on such bond or bonds shall be a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the Owner. The bonds shall remain in force for one year after final acceptance of the work by the Owner, unless the Owner, in writing, releases the Contractor from the obligation sooner.

10. Power of Attorney

Attorneys-in-fact who sign Contract bonds must file with each bond a certified and effectively dated copy of their power of attorney.

11. Laws and Regulations

The bidder's attention is directed to the fact that all applicable State laws, municipal ordinances or bylaws, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the Contract throughout, and they will be deemed to be included in the Contract the same as though written out in full. Attention is directed to Section 00850 and to other applicable sections of the Contract Documents.

GOALS FOR PARTICIPATION BY MINORITY BUSINESS ENTERPRISES AND WOMEN

BUSINESS ENTERPRISES (EXECUTIVE ORDER 390, M.G.L. c. 7, s. 40N)

The applicable goals for minority business enterprise (MBE) and woman business enterprise (WBE) participation established for this Contract are as follows:

MBE/WBE: Combined 10.4 % of the Contract Price.

A. MBE AND WBE PARTICIPATION

1. The apparent low Bidder's compliance with the requirements of this Section is a pre requisite for receiving the Award of the Contract.

2. The MBE and WBE participation goals for this Contract are as set forth above. The Awarding Authority reserves the right to reduce or waive the MBE or WBE participation goals established for this Contract upon written request made by a general Bidder within the time frame set forth in paragraph 9 below. Such written request must demonstrate to the satisfaction of the Awarding Authority that it is not feasible for a non-MBE or non- WBE general Bidder to meet the goals established for this Contract based upon any or all of the following: (i) actual MBE/WBE availability, (ii) the geographic location of the project to the extent related to MBE/WBE availability, (iii) the scope of the work,

(iv) the percentage of work available for subcontracting to MBE/WBEs and/or (v) other relevant factors, including a documented inability by the prospective Bidder to obtain commitments from MBE/WBE subcontractors sufficient to meet the MBE/WBE goals after having made a diligent, good faith effort to do so. All of the foregoing documentation shall accompany the Bidder's request for a reduction or waiver of the MBE/WBE participation goals. Such documentation shall include, at a minimum, the following:

3. A list of all items of work under the Contract that the Bidder made available for subcontracting to MBE/WBEs. The Bidder shall identify all items of work, other than work to be performed by filed sub-Bidders, that the Bidder did not make so available and shall state the reasons for not making such work available for subcontracting to

MBE/WBEs. The Bidder shall also demonstrate that, where commercially reasonable, subcontracts were divided into scopes or tasks capable of being performed by MBE/WBEs.

4. Evidence that the Bidder sent written notices soliciting Bids or proposals to perform the items of work made available by the Bidder for subcontracting to all MBE/WBEs qualified to perform such work. The Bidder shall identify (i) each MBE/WBE solicited, and (ii) each MBE/WBE listed in the Massachusetts Supplier Diversity Office (“SDO”) directory under the applicable trade category that was not solicited and reasons therefore. The Bidder shall also state the date that notices were mailed and provide a copy of the written notice(s) sent.

5. Evidence that the Bidder made reasonable efforts to follow up the written notices sent to MBE/WBEs with telephone calls or personal visits in order to determine with certainty whether the MBE/WBEs were interested in performing the work. Phone logs or other documentation must be submitted.

6. A statement of the response received from each MBE/WBE solicited, including the reason for rejecting any MBE/WBE who submitted a bid or proposal.

7. Evidence of reasonable efforts made, if any, to assist MBE/WBEs that needed assistance in obtaining bonding or insurance, or lines of credit with suppliers if the inability of MBE/WBEs to obtain bonding, insurance, or lines of credit is the reason given for the Bidder's inability to meet the MBE/WBE goals.

8. The Bidder may also submit any other information supporting its request for a waiver or reduction in the MBE/WBE participation goals, including without limitation evidence that the Bidder placed advertisements in appropriate media and trade association publications announcing the Bidder's interest in obtaining bids or proposals from MBE/WBEs, and/or sent written notification to MBE/WBE economic development assistance agencies, trade groups and other organizations notifying them of the Contract and the work to be subcontracted by the Bidder to MBE/WBEs. The Bidder shall also submit any other information reasonably requested by the Awarding Authority to show that the Bidder has taken all actions that could reasonably be expected to achieve the MBE/WBE participation goals.

9. If filed Sub-Bids are solicited for this Contract, requests from prospective general Bidders to reduce or waive the MBE/WBE participation goals for this Contract must be received by the Awarding Authority no later than five (5) working days after the list of filed sub-Bidders is mailed by the Awarding Authority to persons who have taken out plans for the Contract. If there are no filed sub-Bids solicited for this Contract, requests to reduce or waive the MBE/WBE participation goals for this Contract must be received by the Awarding Authority no later than ten

(10) calendar days before the date set for the receipt of general Bids. THE AWARDING

AUTHORITY WILL NOT CONSIDER ANY REQUEST TO REDUCE OR WAIVE THE

MBE/WBE PARTICIPATION GOALS FOR THIS CONTRACT THAT IS RECEIVED AFTER

THESE DEADLINES. Any reduction or waiver of the MBE/WBE participation goals for this Contract will be made by written addendum mailed to all persons who have taken out plans for the project.

10. No later than five (5) working days after the opening of general Bids, the apparent low Bidder shall submit the following documents to the Awarding Authority's Affirmative Marketing Construction Officer (AMCO): (i) a completed Schedule for Participation by MBE/WBE ("Schedule for Participation") in the form provided by the Awarding Authority showing MBE/WBE participation in amounts equal to or exceeding the MBE/WBE participation goals for this Contract, (ii) a completed Letter of Intent inthe form provided by the Awarding Authority for each MBE/WBE listed in the Schedule for Participation, and (iii) a SDO most recent certification letter for each MBE/WBE listed in the Schedule of MBE/WBE Participation showing that the MBE/WBE is certified in the area of work for which it is listed on the Letter of Intent.

11. Each Letter of Intent shall identify and describe the work to be performed by the named MBE/WBE (the “MBE/WBE Work”) with enough specificity to permit the Awarding Authority to identify the particular items of contract work that the MBE/WBE will perform for MBE/WBE participation credit. The Awarding Authority reserves the right to reject any Letter of Intent if the price to be paid for the MBE/WBE Work does not bear a reasonable relationship to the value of such work under the Contract as determined by the Awarding Authority.

12. Within five (5) working days after receipt of the Schedule for MBE/WBE Participation, Letters of

Intent, and SDO most recent certification letter, the Awarding Authority shall review and either approve or disapprove the apparent low Bidder’s submissions. If the apparent low Bidder has not submitted an appropriate Schedule for MBE/WBE Participation and appropriate Letters of Intent and SDO most recent certification letter establishing that the MBE/WBE participation goal for the project will be met, the apparent low Bidder will be considered ineligible for Award of the Contract and the Awarding Authority will Award the Contract to the second lowest eligible and responsible Bidder, subject to said Bidder’s compliance with these conditions. If funds are insufficient to award to the second lowest Bidder, the project may have to be re-bid.

13. The Bidder's attention is called to the General Conditions of the Contract which requires the Contractor to submit, within thirty (30) days of the Contract Date, signed subcontracts with all subcontractors or a purchase order or invoice from each material supplier and/or manufacturer listed on the Schedule for MBE/WBE Participation.

14. A filed sub-Bidder is not required to submit a Schedule of MBE/WBE Participation with its Bid.

A filed sub-Bidder may, at its option, submit a Letter of Intent with its Bid if it is a SDO certified MBE/ WBE. If a filed sub-Bidder intends to sub-subcontract work to a SDO certified MBE/WBE, and the awarding authority permits limited sub-sub contracting for purposes of MBE/WBE participation, and the filed sub-Bidder wishes that sub-subcontract to be credited toward the participation goals for this Contract, the filed sub-Bidder should submit a Letter of Intent from that MBE/WBE with its Bid.

12. Liquidated Damages for Failure to Enter into Contract

The successful bidder, upon his failure or refusal to execute and deliver the Contract and bonds required within 10 days after presentation thereof by the Owner, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with his/her bid, but the amount forfeited shall not exceed the difference between his/her bid price and the bid price of the next lowest responsible and eligible bidder. In case of death, disability, bona fide clerical or mechanical error of a substantial nature, or other similar unforeseen circumstances affecting the bidder, his/her bid deposit will be returned.

13. Obligation of Bidder

At the time of the opening of bids, each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Contract Documents (including all addenda).

The failure or omission of any bidder to examine any form, instrument, or document shall in no way relieve any bidder from any obligation in respect of his bid.

14. Information Not Guaranteed

All information given in the Contract Documents relating to subsurface and other conditions, natural phenomena, existing pipes, and other structures is from the best sources at present available to the Owner. All such information is furnished only for the information and convenience of bidders and is not guaranteed.

It is agreed and understood that the Owner does not warrant or guarantee that the subsurface or other conditions, natural phenomena, existing pipes, or other structures encountered during construction will be the same as those indicated in the Contract Documents.

If is further agreed and understood that no bidder or Contractor shall use or be entitled to use any of the information made available to him or obtained in any examination made by him in any manner as a basis of or ground for any claim or demand against the Owner or the Architect/Engineer, arising from or by reason of any variance which may exist between the information made available and the actual subsurface or other structures actually encountered during the construction work, except as may otherwise be expressly provided for in the Contract Documents.

15. Bid Security

Each bid and sub-bid must be accompanied by bid security in the form of a certified check, a bid bond, cash, or a treasurer's or cashier's check, payable to the Owner, in the amount of five (5) percent of the value of the bid. Such security of general bidders will be returned to all except the three lowest responsible and eligible bidders within five days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids, and the remaining securities will be returned promptly after the Owner and the accepted bidder have executed the Contract, or if no notice of intent to award has been presented to the selected contractor within 30 days, Saturdays, Sundays and holidays excluded, after the date of the opening of bids, upon demand of the bidder at any time thereafter. Bid security of sub-bidders, except that of the sub-bidders named in the general bids of the three lowest responsible and eligible general bidders and those of the three lowest responsible and eligible sub-bidders for each sub-trade, shall be returned within five (5) days, Saturdays, Sundays and legal holidays excluded. After the opening of general bids, the bid security of the sub-bidders not returned as aforesaid, shall be returned within five

(5) days, Saturdays, Sundays and legal holidays excluded, after the execution of the General Contract.

16. Right to Reject Bid

The Owner reserves the right to waive any informalities in bids and to reject any and all bids, should the Owner deem it to be in the public interest to do so.

The Owner may also reject bids which in its sole judgment are either incomplete, conditional, obscure or not responsive or which contain additions not called for, erasures not properly initialed, alterations, or similar irregularities.

17. Time for Completion

The successful general bidder must agree to commence work within ten (10) days of the date of the Notice to Proceed and to fully complete the project within the time limit stated in Section

00300, FORM OF GENERAL BID.

18. Comparison of Bids

Bids will be compared on the basis of prices set forth in the bid forms.

In the event that there is a discrepancy between the lump sum or unit prices written in words and figures, the prices written in words will govern.

19. Award of Contract

The Contract will be awarded to "the lowest responsible and eligible bidder" pursuant to General Laws Chapter 149, Section 44A(2), as amended. Such a bidder shall possess the skill, ability and integrity necessary for the faithful performance of the work, shall be able to furnish labor that can work in harmony with all other elements of labor employed, or to be employed, in the work, and shall otherwise comply with all applicable provisions of law. Contract award shall be subject to availability of an appropriation for funding.

20. Statutes Regulating Competitive Bidding

Any bid which does not comply with the provisions of Massachusetts General Laws Chapter 149, Sections 44A through 44H, as amended, need not be accepted and the Owner may reject every such bid.

21. Wage Rates

Prevailing Wage Rates as determined by the Commissioner of the Department of Labor and Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Section 26 to 27G, as amended, apply to this project. It is the responsibility of the bidder, before bid opening, to request any additional information on Prevailing Wage Rates for those tradespeople who may be employed for the proposed work under this contract.

State schedules of Prevailing wage rates are included in the Supplemental General Conditions section of the Contract Documents.

22. Contractor Records

The Contractor shall comply with the provisions of Massachusetts General Laws, Chapter 30, Section 39R concerning Contractor records.

23. Insurance

The Contractor shall carry and continuously maintain until completion of the Contract, insurance as specified in the General Conditions and in such form as shall protect him performing work covered by this Contract, and the Bristol County Agricultural High School and its employees, agents and officials, from all claims and liability for damages for bodily injury, including accidental death, and for property damage, which may arise from operations under this Contract.

The City/Campus shall be named as an additional insured. The Contractor covenants and agrees to hold the City/Campus and its employees, agents and officials harmless from loss or damage due to claims for bodily injury or death and/or property damage arising from, or in connection with, operations under this Contract.

25. Project Manager

Owner may utilize the services of a project manager, whose duties shall be as set forth in the Agreement for Project Manager Services.

21. Certificate of Eligibility and Update Statement

In accordance with G.L. c.149, §44D, every bid and sub-bid must be accompanied by a copy of a certificate of eligibility issued by the Division of Capital Asset Management showing that the bidder or sub-bidder has the classification and capacity rating to perform the work required. An appropriate update statement must also be provided with each bid. Any bid or sub-bid submitted without an appropriate certificate of eligibility or update statement shall be invalid.

SECTION 00300 FORM

OF GENERAL BID

Bid of (hereinafter called "Bidder")*

( ) a corporation, organized and existing under the laws of the state of

( ) a partnership

( ) a joint venture

( ) an individual doing business as

To the Campus of Bristol County Agricultural High School (hereinafter called "Owner").

A) The undersigned Bidder, in compliance with your invitation for bids for the project known as K9 Center Roof Replacement Vinyl Siding Door and Window Trim Project at Bristol County Agricultural High School, having examined the plans and specifications and related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies, and to construct the project in accordance with the contract documents and the plans and specifications within the time set forth below, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this bid is a part.

The Bidder hereby agrees to commence work on or before the date to be specified in written

"Notice to Proceed" of the Owner, and to be substantially complete the project by September 30, 2025.

The Bidder further agrees to pay as liquidated damages the sum of One thousand ($1,000) Dollars for each consecutive calendar day thereafter that the work is not complete as provided in Section 00700 GENERAL

CONDITIONS.

*Specify corporation, partnership or individual as applicable.

B) Bidder acknowledges receipt of, and this bid includes the following addenda: No.

Dated:

No. Dated:

C) BASE BID: The Bidder agrees to perform the work described in the specifications and shown on the plans for the following contract price: $

The undersigned agrees that, if he is selected as general contractor, he will within five days, Saturdays, Sundays and legal holidays excluded, after presentation thereof by the awarding authority, execute a contract in accordance with the terms of this bid and furnish a performance bond and also a labor and materials or payment bond, each of a surety company qualified to do business under the laws of the commonwealth and satisfactory to the awarding authority and each in the sum of the contract price, the premiums for which are to be paid by the general contractor and are included in the contract price;

provided, however, that if there is more than one surety company, the surety companies shall be jointly and severally liable.

The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards made subject to section 44A.

The undersigned further certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word "person'' shall mean any natural person, joint venture, partnership, corporation or other business or legal entity. The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.

The Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding.

The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of bids.

Bid security is attached in the sum of five percent (5%) of the total bid in accordance with the conditions of Section 00100 INSTRUCTIONS TO BIDDERS. The bid security may become the property of the Owner in the event the contract and bonds are not executed within the time set forth above.

The selected Contractor shall furnish a performance bond and a payment bond in an amount at least equal to one hundred percent (100%) of the contract price in accordance with Section 00610 PERFORMANCE BOND, Section 00620 PAYMENT BOND, and as stipulated in the contract.

The undersigned offers the following information as evidence of his qualifications to perform the work as bid upon according to all the requirements of the plans and specifications.

1. Have been in business under present name for years.

2. The names and addresses of all persons interested in the bid (if made by a partnership or corporation) as principals, are as follows:

3. The undersigned hereby declares that the use of a sub-contractor for Vinyl Siding and Window and door trim, will be named as:___________________________________________.

(attach supplementary list if necessary)

3. The bidder is requested to state below what work of a similar character to that included in the proposed contract he has done, and give references that will enable the Owner to judge his experience, skill and business standing (add supplementary page if necessary).

Completion Project Contract Design Reference Telephone Date Name Amount Architect Name No.

a.

b.

c.

d.

e.

f.

Pursuant to M.G.L. CH. 62C, Sec. 49A, I certify hereby in writing, under penalties of perjury, that the within named Bidder/Contractor has complied with all laws of the commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting of child support.

The undersigned Bidder hereby certifies under penalties of perjury, as follows: (1) that he/she is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work; (2) that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and (3) that all employees to be employed in the work subject to this bid have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration.

The undersigned certifies under penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this paragraph the word “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.

The undersigned bidder hereby certifies, under pains and penalties of perjury, that the foregoing bid is based upon the payment to laborers to be employed on the project of wages in an amount no less that the applicable prevailing wage rates established for the project by the Massachusetts Department of Labor and Workforce Development. The undersigned bidder agrees to indemnify the awarding authority for, from and against any loss, expense, damages, actions or claims, including any expense incurred in connection with any delay or stoppage of the project work arising out of or as a result of (1) the failure of the said bid to be based upon the payment of the said applicable prevailing wage rates or (2) the failure of the bidder, if selected as the contractor, to pay laborers employed on the project the said applicable prevailing wage rates.

Respectfully submitted:

Date: By:

(Signature)

(Type Name of Bidder)

(Title)

(Business Address)

(City and State)

(Telephone Number)

SECTION 00500

AGREEMENT

THIS AGREEMENT made this day of in the year Two Thousand and , between , with a usual place of business at , hereinafter called the CONTRACTOR, and the Campus of , acting by its , with a usual place of business at Street, , MA , hereinafter called the

OWNER.

The CONTRACTOR and the OWNER, for the consideration hereinafter named, agree as follows:

1. Scope of Work

The Contractor shall furnish all labor, materials, equipment and insurance to perform all work required for the project known as the Project, in strict accordance with the Contract Documents and all related Drawings and Specifications. The said Documents, Specifications, Drawings and any supplemental general conditions are incorporated herein by reference and are made a part of this Agreement.

2. Contract Price

The Owner shall pay the Contractor for the performance of this Agreement, subject to additions and deductions provided herein, in current funds, the sum of

3. Commencement and Completion of Work and Liquidated Damages

It is agreed that time is of the essence of this Agreement. The Contractor shall commence and prosecute the work under this Agreement upon execution hereof and shall complete the work on or before .

A. Definition of Term: The Term "Substantial completion" shall mean the date certified by the

Owner when construction is sufficiently complete, in accordance with the Contract Documents, so the Owner may occupy the project, or designated portion(s) thereof, for the use for which it is intended.

B. Time as Essential Condition: It is understood and agreed that the commencement of and substantial completion of the work are essential conditions of this Agreement. It is further agreed that time is of the essence for each and every portion of the Contract Documents wherein a definite and certain length of time is fixed for the performance of any act whatsoever; and where under the Contract Documents any additional time is allowed for the completion of any work, the new time fixed by such extension shall be of the essence of this Agreement. It is understood and agreed that the times for the completion of the work are reasonable, taking into consideration the average climatic range and usual industrial conditions prevailing in this locality.

C. Progress and Completion: Contractor shall commence work promptly upon execution of this

Agreement and shall prosecute and complete the work regularly, diligently and uninterruptedly at such a rate of progress as will insure Substantial Completion within the stipulated number of calendar days.

D. Liquidated Damages: It is expressly agreed between the Contractor and the Owner that the

Contractor will be responsible for all damages which may arise due to the Contractor's failure to substantially complete the work within the above specified time. If the Contractor shall neglect, fail or refuse to complete the work within the specified number of days, or any extension thereof authorized by the Owner, Contractor agrees, as a part of the consideration for the execution of this Contract by the Owner, to pay the Owner the amount specified herein, not as a penalty, but as liquidated damages for such breach of contract as hereinafter set forth, for each and every calendar day, excluding Saturdays, Sundays and legal Holidays, that the Contractor shall be in default of Substantial completion after the date specified in the Agreement. Due to the impracticability and extreme difficulty of fixing and ascertaining the actual damages the Owner would in such event sustain, said amount is agreed to be the amount of damages which the Owner would sustain, and said amount shall be retained from time to time by the Owner from current periodic estimates. The amount of liquidated damages shall be per day.

4. Performance of the Work

A. Direction of the Work: The Contractor shall supervise and direct the Work, using his best skills and attention which shall not be less than such state of skill and attention generally rendered by the contracting profession for projects similar to the Project in scope, difficulty and location. The Contractor shall maintain adequate supervisory personnel at the project site during the performance of the Work. He shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Agreement.

B. Responsibility for the Work: (1) The Contractor shall be responsible to the Owner for the acts and omissions of his employees, Subcontractors and their agents and employees, and other persons performing any of the Work under a contract with the Contractor. This obligation shall also extend to the presence on the Site of suppliers of materials or equipment, their employees, contractors, and agents engaged in the work.

(2) The Contractor shall not be relieved from his obligations to perform the Work in accordance with the Contract Documents either by the activities or duties of the Owner in its administration of the Agreement, or by inspections, tests or approvals required or performed by persons other than the Contractor.

C. Permits and Fees: Unless otherwise expressly provided, the Contractor shall secure and pay for all permits and fees, licenses and inspections necessary for the proper execution and completion of the Work which are customarily secured after execution of the Agreement and which are legally required at the time the bids are received, and the same shall at all times be the property of the Owner and shall be delivered to the Owner upon completion of the Project.

D. Notices, Compliance With Laws: (1) The Contractor shall give all notices and comply with all federal, state and local laws, ordinances, rules, regulations and lawful orders of any public authority bearing on the performance of the Work. The Contractor shall provide the Owner with reproductions of all permits, licenses and receipts for any fees paid. The Owner represents that it has disclosed to the Contractor all orders and requirements known to the Owner of any public authority particular to this Agreement.

(2) If the Contractor observes that any of the Contract Documents are at variance with applicable laws, statutes, codes and regulations in any respect, he shall promptly notify the Owner in writing, and any necessary changes shall be accomplished by appropriate modification.

(3) If the Contractor performs any Work which he knows or should know is contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner, he shall assume full responsibility therefor and shall bear all costs attributable thereto.

(4) In the performance of the Work, the Contractor shall comply with all applicable federal, state and local laws and regulations including those relating to workplace and employee safety.

The Contractor shall notify the Owner immediately of any conditions at the place of the work which violate said laws and regulations and shall take prompt action to correct and eliminate any such violations.

E. Project Superintendent: The Contractor shall employ a competent superintendent and necessary assistants who shall be in attendance at the Project site at all times during the progress of the Work. The superintendent shall represent the Contractor and all communications given to the superintendent shall be as binding as if given to the Contractor.

Important communications shall be confirmed in writing. Other communications shall be so confirmed on written request in each case.

F. Progress Schedule: The Contractor, immediately after being awarded the Contract, shall prepare and submit for the Owner's information an estimated progress schedule for the Work. The progress schedule shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work.

G. Drawings, Specifications and Submittals:

(1) The Contractor shall maintain at the site for the Owner one record copy of all Drawings, Specifications, Addenda, Change Orders and other Modifications, and "As-Built" Drawings and Specifications in good order and marked currently to record all changes made during construction, and approved Shop Drawings, Product Data and Samples. These shall be delivered to the Owner upon completion of the Work.

(2) By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that he has determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that he has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents.

(3) The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Owner's approval of Shop Drawings, Product Data or Samples unless the Contractor has specifically informed the Owner in writing of such deviation at the time of submission and the Owner has given written approval to the specific deviation. The Contractor shall not be relieved from responsibility for errors or omissions in the Shop Drawings, Product Data or Samples by the Owner's approval thereof.

(4) The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data or Samples, to revisions other than those requested by the Owner on previous submittals.

(5) No portion of the Work requiring submission of a Shop Drawing, Product Data or Sample shall be commenced until the submittal has been approved by the Owner. All such portions of the Work shall be in accordance with approved submittals.

H. Protection of the Work and Owner's Property: The Contractor shall at all times safely guard the Owner's property from injury or loss in connection with this Agreement. He shall at all times safely guard and protect his own work, and that of adjacent property from damage. The Contractor shall replace or make good any such damage, loss or injury. The Contractor shall clean the work area and restore it to its original condition upon completion of the work.

I. Quality of the Work: The Contractor shall perform the work in a good, workmanlike manner. The

Contractor hereby guarantees that the entire work constructed by him under the Agreement will meet fully all requirements thereof as to quality of workmanship and materials. The Contractor hereby agrees to make at his own expense any repairs or replacements made necessary by defects in materials or workmanship supplied to him that become evident within one (1) year after the date of the final payment, and to restore to full compliance with the requirements set forth herein any part of the work constructed hereunder, which during said one (1) year period is found to be deficient with respect to any provisions of the Contract Documents. The Contractor also agrees to hold the Owner harmless from claims of any kind arising from damage due to said defects. The Contractor shall make all repairs and replacements promptly upon receipt of written orders for same from the Owner. If the Contractor fails to make the repairs and replacements promptly, the Owner may do the work and the Contractor shall be liable to the Owner for the cost thereof.

J. Warranty: The Contractor guarantees to Owner that all materials incorporated into the work will be new unless otherwise specified or agreed. Prior to final payment, the Contractor shall deliver to the Owner all manufacturers' warranties, together with such endorsements or assignments as are necessary to ensure…