Basketball Hoop Quote 10-29-25.pdf
PDF 291 KB Posted
- Solicitation number
- BD-26-1631-LAN01-LAN01-122384
- Issued by
- Worcester County, Massachusetts
About this file
This document is a Request for Quotes (RFQ) issued by the Town of Lancaster, Massachusetts for a Community Center Basketball Hoop Replacement project involving the installation of four indoor/outdoor basketball hoops. The project will be quoted through COMMBUYS, with quotes due by Wednesday, November 12, 2025 at 10:00 AM. The scope of work includes furnishing and installing four basketball hoops with 4-foot bump-out brackets, including 42" x 54" auxiliary glass backboards, breakaway rims, and nets. Three hoops will be fixed-position, while one hoop located above the stage will feature an electric-powered hoist mechanism. The contractor will also be responsible for removing and disposing of two existing large hoops.
The project will be procured under the Massachusetts Statewide Contract "FAC122: Landscaping Products, Parks and Recreation Equipment and Related Products, Supplies and Services" and is subject to prevailing wage rate requirements. The contract will be awarded to the lowest priced responsible quoter, with a contract term of thirty (30) days from the contract execution date. Contractors must provide evidence of insurance coverage, including general liability ($2,000,000 aggregate), auto liability ($1,000,000), and workers' compensation. The project requires compliance with OSHA safety regulations, and all employees must have completed a 10-hour construction safety course. The contractor must submit weekly payroll records and maintain a one-year installation warranty on the equipment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF LANCASTER
NOTICE OF QUOTES
The Town of Lancaster Office of the Town Administrator will receive quotes for COMMUNITY CENTER BASKETBALL HOOP REPLACEMENT (4 HOOPS) until Wednesday, November 12, 2025 at 10:00 AM. Quotes will be accepted electronically through COMMBUYS or submitted directly to Samantha Zediker, Recreation Director at szediker@lancasterma.gov.
The quote form and specifications for the work may be obtained through COMMBUYS solicitation “Community Center Basketball Hoop Replacement (4 Hoops), or by requesting an electronic copy from Lancaster Recreation Director Samantha Zediker at:
szediker@lancasterma.gov
This project is being quoted on the provisions of M.G.L. c.149 and the requirements and process of the Massachusetts Statewide Contract “FAC122: Landscaping Products, Parks and Recreation Equipment and Related Products, Supplies and Services.”
Minimum wage rates are established for the project as set forth in the quote documents.
The lowest priced responsible quoter will be awarded a contract for the project. The Town Administrator reserves the right to reject any or all quotes, and waive informalities in the quoting procedures, or to accept the quote deemed in the best interest of the Town of Lancaster.
John R. Woodsmall, III Town Administrator mailto:szediker@lancasterma.gov
COMMUNITY CENTER BASKETBALL HOOP REPLACEMENT (4 HOOPS)
PART 1-GENERAL CONDITIONS
1.1. INSURANCE REQUIREMENTS
The awarded quoter shall be required at the time of contract execution to provide proof of Worker’s Compensation; General Liability in accordance with Massachusetts statutory requirement;
coverage with limits of at least 2,000,000/1,000,000 and listing the Town of Lancaster (the “Town”) as an additional insured; and automobile Liability Insurance coverage in amounts no less than with 1,000,000 combined single limit, and; excess liability with $1,000,000.00 minimum limits in excess of underlying limits with the umbrella being no more restrictive than the underlying coverage.
1.2. PAYMENT BOND
A payment bond shall not be required for this contract.
1.3. QUOTE SECURITY
No quote security (bid bond) is required for this procurement.
1.4. PREVAILING WAGE RATES
Contractors will pay prevailing wage rates as determined by the Commissioner under the provisions of the Massachusetts General Laws (M.G.L.). If any part of this project is subcontracted out to another party, prevailing wages are still applicable. The prevailing wage rates for this project are shown in Attachment A.
1.5. WEEKLY PAYROLL SHEETS
In accordance with state law (M.G.L.c.30 § 39R), weekly payrolls must be submitted to the Town’s Recreation Department to ensure that the Prevailing wage rates are being paid to employees working on the Project. The format for submission is shown in Attachment A. No requisitions for payment will be processed by the Town unless the appropriate payroll information is attached.
1.6. AWARD OF CONTRACT
The lowest priced, responsible quoter shall be awarded a contract to perform the work described herein. A responsible quoter shall be determined using the qualifications further described herein.
The form of contract to be awarded may be found in Attachment B.
It is the Quoter’s responsibility for ensuring that they have received all addenda that may be issued by the Town during the quote process. Failure to receive and/or acknowledge all addenda may result in the rejection of a quote.
Quoters shall submit with their quote a listing of all contracts, similar in value to their quote, that have been awarded in the past two (2) calendar years.
PART 2-SPECIFICATIONS
2.1. SCOPE OF WORK
Work under this contract shall consist of all labor, materials, equipment, supervision, permits and other services required for the furnishing of equipment of four (4) indoor/outdoor basketball hoops, including 4-foot bump out bracket, backboards, rims, nets, and all necessary hardware components, and the complete labor for installation, as indicated on the bid list and/or specified herein, and all other appurtenances necessary to complete the work specified.
The work shall also include the removal and disposal of the two (2) large existing hoops and their associated supports. The two (2) smaller hoops will be removed by others.
Three (3) of the hoops will be mounted without any mechanism to raise/lower them. The large hoop located above the stage shall be provided with an electric powered hoist. Electrical supply and connection(s) will be provided by others under a separate contract.
2.2. QUALIFICATIONS
A. The Contractor shall assign a suitable superintendent to this contract who shall be present at all times while the work is in progress, and shall be thoroughly knowledgeable and informed concerning every aspect of this work. The installer and all others employed by the Contractor shall be skilled, experienced, and trained in the particular scope assigned to them.
B. The Contractor shall be responsible for knowing and fulfilling all applicable local, state and federal laws, and any and all regulations, including those of the Occupational Safety and Health Administration (OSHA), concerning the performance of this contract. The Bidder/Contractor shall immediately advise the Lancaster Recreation Director of any changes in laws as they may affect the performance of this contract.
C. The Contractor shall furnish the Town, upon request: resumes, licenses, credentials, etc., of the employees working on this contract.
2.3. PERMITTING AND NOTICES
A. The Contractor shall be responsible for any required permits and governmental fees, licenses, and inspections necessary for the proper execution and completion of the work which are customarily secured after the execution of a contract, and which are legally required based on the scope of work.
B. The Contractor shall give all notices and comply with all laws, rules, regulations, and lawful order of any public authority bearing on the performance of the work.
2.4. TIME FOR COMPLETION
A. The Contractor shall commence work under this scope of services within five (5) days of the receipt of the notice to proceed issued by the Town, unless otherwise directed by the Recreation Director, and continue this work until complete. Failure to respond in the designated time period may result in the Town holding the Contractor in breach of contract.
B. All work under this scope of service shall be completed within thirty (30) days of the receipt of the notice to proceed issued by the Town.
2.5. HOURS OF OPERATION
Standard hours shall be Monday through Friday from 8:00 A.M. to 3:30 P.M. Nights, Saturday, Sunday, or Holiday work will be permitted only to the extent that is absolutely necessary, and only with the written consent of the Recreation Director.
2.6. PROVISION REQUIRED BY LAW TO BE INSERTED
Each and every provision of law and clause required by law to be inserted in the contract shall be deemed to be inserted herein and the contract shall read and be enforced as though it were inserted therein; and if, through mistake or otherwise, any provision is not inserted or is not correctly inserted, then, upon the application of either party, the contract shall be forthwith physically amended to make such insertion or correction.
2.7. EXAMINATION OF SITE
A. The Contractor shall be expected to visit the site designated for removal and examine the existing conditions that affect all or part of the work. Failure to do so will not relieve the Contractor from furnishing the necessary labor, equipment, and materials or performing any work required to complete the contracted scope in accordance with the specifications.
B. The scope of work involves the equipment and install of four (4) indoor/outdoor basketball hoops, one (1) hoop shall be equipped with a power hoist, including 4-foot bump out bracket, backboards, rims, nets, and all necessary hardware components, and labor for installation, and the removal and disposal of the two (2) existing large hoops. All bidders must thoroughly acquaint themselves with any limitations and include in their pricing all-necessary and specified materials, labor, equipment, and safety apparatus to complete tree removals and stump grinding.
2.8. GENERAL
A. Any damages caused by the actions of the Contractor to the gym floor must be repaired to the satisfaction of the Town and the cost shall be borne by the Contractor.
B. Minimum equipment required for this contract: All equipment and installation shall conform to ASTM and NCAA/NFHS standards for basketball equipment and meet Federal and State specification, as applicable, including dielectric inspections:
i. Delivery Truck
ii. Commercial grade ladders.
iii. Commercial grade power tools.
C. The installation of four (4) basketball hoops with 4-foot bump out brackets located in the Lancaster Community Center Gymnasium. The following are the hoop (backboard, rim, & net) measurements:
i. Four (4) cross court hoops with 42” x 54” Auxiliary Glass backboards, rims, and nets
ii. Four (4) still frame and four-point wall mounts
i. Frames/brackets need to include 4-foot bump out from the wall/column
ii. The hoop to be located over the stage shall be equipped with an electric powered hoist mechanism. Electrical supply shall be provided by others.
2.9. EXECUTION
• Protection of Persons and Property - The Contractor shall perform all work in a safe and orderly manner and shall protect all existing areas from damage, repairing and or replacing any damage caused by the Contractor at no cost to the Town. Through the erection of warning signage, and/ or other approved and mandated means required, the Contractor shall protect from injury all persons passing and/ or moving by the site.
• Safety Regulations - The Contractor shall conduct all of his operations in strict accordance with all applicable OSHA (i.e. OSHA 1910.269 CFR, etc. and any updates or additional regulations) and State safety regulations. The Contractor shall assume the entire responsibility for the safety of employees, during the implementation of the scope specified and shall be responsible for any and all injury resulting from the failure thereof.
• Project Clean-Up – At all times the Contractor shall keep the premises free from accumulated waste materials and/ or rubbish caused by the operation. At the completion of a work day the Contractor shall remove the waste materials from and about the premises as well as his tools, equipment, machinery, and surplus materials. Should the Contractor leave the premises in a disorderly condition, the Town will undertake the clean up work and the cost of such work shall be deducted from the payment to the Contractor.
• Wall-Mounted Hoop Systems
i. Provide and install four (4) heavy-duty indoor basketball hoop systems, wall-mounted with a minimum 4-foot extension arm/bump out.
ii. Each system to include:
i. Steel support structure, powder-coated finish, designed for permanent wall mounting.
ii. Regulation-size glass backboards (42” x 54”).
iii. Breakaway rims (competition-grade, spring-loaded).
iv. Weather- and wear-resistant nylon nets.
• Mounting & Structural Reinforcement
i. Verify wall conditions and structural integrity prior to installation.
ii. Install mounting brackets, hardware, and bracing per manufacturer’s specifications.
iii. Ensure units are level, aligned, and properly secured to support safe play.
• Warranty
i. Minimum 1-year installation warranty.
ii. Manufacturer warranty on backboards, rims, and structures must be provided to the Town.
• Hoisting
i. One (1) hoop shall be equipped with an electric hoisting mechanism to allow for the raising and lowering of the hoop. This hoop shall be located above the stage located in the center.
2.10. PERFORMANCE
The Town will not award this contract unless the Contractor has furnished satisfactory evidence of their ability and experience to perform this work, and that they have sufficient capital and equipment to enable them to prosecute the work successfully and to complete it within the time named in the contract. As part of the bid, the Contractor must submit a list of all similar projects within the past two (2) years, whose relevance to the proposed job shall be deemed by the Town.
The name, address, and telephone number of a contact person involved with each of these projects must be included so they can be investigated prior to the award of the contract. The Town reserves the right to contact others who may have knowledge of the contractors past performance.
2.11. MEASUREMENT AND PAYMENT
A. Measurement
i. The quantity for Item 1-Equipment and Installation of Four (4) Basketball Hoops and Brackets with a 4-Foot Bump Out in the LCC Gym is for all work associated with the project, including the furnishing and installation of the new hoops, and removal and disposal of the two (2) existing large hoops. Item 1 shall be for the work authorized in place, completed, and accepted. The quantity shall be measured as a lump sum, for the total number of hoops installed.
B. Payment
i. Upon completion of work, the Contractor shall submit an invoice for each item of work completed under this section.
ii. Payment for Item 1- Equipment and Installation of Four (4) Basketball Hoops and Brackets with a 4-Foot Bump Out in the LCC Gym shall be made at the contract lump sum price, which price shall be full compensation for furnishing all materials, labor, equipment, tools, and details, and incidentals necessary to complete the lump sum item in place, and all other work (including removal and disposal of the two existing hoops) specified in this section.
iii. Payment shall be net thirty (30) days.
#END#
TOWN OF LANCASTER
RECREATION DEPARTMENT
BID FORM
COMMUNITY CENTER BASKETBALL HOOP REPLACEMENT (4 HOOPS)
Item No. Estimated Quantity Brief Description of Items with Unit Price Bid in Words
1 1 Lump Sum
Four (4) Basketball Hoops (backboard, rim, nets) and 4’brackets installed in the LCC Gym
• Steel support structure, powder-coated finish, designed for permanent wall mounting.
• Regulation-size glass backboards (42” x 54”).
• Breakaway rims (competition-grade, spring-loaded).
• Weather- and wear-resistant nylon nets.
• One (1) hoop with electric hoist
Total Quote Price in Figures
Total Bid Price in Words*
*In the event of a discrepancy between “Total Quote Price in Figures” and “Total Quote Price in Words,” “Quote Price in Words” shall govern.
The undersigned agrees that, if they are selected as general contractor, they will within five (5) days, Saturdays, Sundays and legal holidays excluded, after presentation thereof by the awarding authority, execute a contract in accordance with the terms of this quote.
For review purposes, the Quoter shall provide the names and contact information for all contracts similar in value performed in the past two (2) calendar years for the types of work described in the project specifications. The Quoter shall provide this information as an attachment to their submittal.
The undersigned certifies under penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. The term “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.
BID FORM
COMMUNITY CENTER BASKETBALL HOOP REPLACEMENT (4 HOOPS)
The undersigned further certifies that (1) they are able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work; (2) that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employees begin work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee.
DATE:__________________
COMPANY:_______________________________________________________
ADDRESS:________________________________________________________
TELEPHONE: ________________________ FAX# _______________________
EMAIL: ___________________________________________________________
(Name & Title of Authorized Person)
(signature)
Tax Compliance Certification
Pursuant to M.G.L. c. 62C, §49A, I hereby certify under the penalties of perjury that, to the best of my knowledge and belief, I am in compliance with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting child support.
Social Security or Federal I.D. Number
Signature of person submitting bid or proposal
Date
Please Print:
Corporate Name
Address
PO Box
City, State, Zip Code
*Your Social Security Number or Federal Identification Number will be furnished to the Massachusetts Department of Revenue to determine whether you have met tax filing or tax payment obligations. Proposers who fail to correct their non-filling or delinquency will not have a contract or other agreement issued, renewed, or executed. This request is made under the authority of M.G.L. Ch 62C, 48A.
ATTACHMENT A
PREVAILING WAGE RATES
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
MAURA HEALY
Governor
KIM DRISCOLL
Lt. Governor
As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LAUREN JONES
Secretary
MICHAEL FLANAGAN
Director
Awarding Authority: TOWN OF LANCASTER City/Town: LANCASTER
Contract Number:
Description of Work: Redo gym floor, install 6 new basketball hoops, add wall padding
Job Location: 701 Main Street
Information about Prevailing Wage Schedules for Awarding Authorities and Contractors
The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, the awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. The updated wage schedule must be provided to all contractors, including general and sub-contractors, working on the construction project.
This annual update requirement is generally not applicable to 27F “rental of equipment” contracts. For such contracts, the prevailing wage rates issued by DLS shall remain in effect for the duration of the contract term. However, if the prevailing wage rate sheet issued does not contain wage rates for each year covered by the contract term, the Awarding Authority must request updated rate sheets from DLS and provide them to the contractor to ensure the correct rates are being paid throughout the duration of the contract. Additionally, if an Awarding Authority exercises an option to renew or extend the contract term, they must request updated rate sheets form DLS and provide them to the contractor.
This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the “Wage Request Number” on all pages of this schedule.
An Awarding Authority must request an updated wage schedule if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date.
The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub-bidder, or a sub-contractor.
Apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS). Apprentices must keep their apprentice identification card on their persons during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DAS regardless of whether they are registered with another federal, state, local, or private agency must be paid the journeyworker's rate.
Every contractor or subcontractor working on the construction project must submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee’s name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. For a sample payroll reporting form go to http://www.mass.gov/dols/pw.
Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617)
626-6953.
Contractors must obtain the wage schedules from awarding authorities. Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties.
Employees not receiving the prevailing wage rate set forth on the wage schedule may file a complaint with the Fair Labor Division of the office of the Attorney
General at (617) 727-3465.
Page 1 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2025 $40.95 $15.57 $20.17 $0.00 $0.00 $76.69
12/1/2025 $40.95 $15.57 $21.78 $0.00 $0.00 $78.30
1/1/2026 $40.95 $16.17 $21.78 $0.00 $0.00 $78.90
6/1/2026 $41.95 $16.17 $21.78 $0.00 $0.00 $79.90
12/1/2026 $41.95 $16.17 $23.52 $0.00 $0.00 $81.64
(2 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $41.95 $16.77 $23.52 $0.00 $0.00 $82.24
6/1/2025 $41.02 $15.57 $20.17 $0.00 $0.00 $76.76
12/1/2025 $41.02 $15.57 $21.78 $0.00 $0.00 $78.37
1/1/2026 $41.02 $16.17 $21.78 $0.00 $0.00 $78.97
6/1/2026 $42.02 $16.17 $21.78 $0.00 $0.00 $79.97
12/1/2026 $42.02 $16.17 $23.52 $0.00 $0.00 $81.71
(3 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.02 $16.77 $23.52 $0.00 $0.00 $82.31
6/1/2025 $41.14 $15.57 $20.17 $0.00 $0.00 $76.88
12/1/2025 $41.14 $15.57 $21.78 $0.00 $0.00 $78.49
1/1/2026 $41.14 $16.17 $21.78 $0.00 $0.00 $79.09
6/1/2026 $42.14 $16.17 $21.78 $0.00 $0.00 $80.09
12/1/2026 $42.14 $16.17 $23.52 $0.00 $0.00 $81.83
(4 & 5 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.14 $16.77 $23.52 $0.00 $0.00 $82.43
ADS/SUBMERSIBLE PILOT
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
6/1/2025 $41.09 $9.90 $9.25 $9.11 $0.00 $69.35
12/1/2025 $42.47 $9.90 $9.25 $9.11 $0.00 $70.73
6/1/2026 $43.91 $9.90 $9.25 $9.11 $0.00 $72.17
12/1/2026 $45.35 $9.90 $9.25 $9.11 $0.00 $73.61
6/1/2027 $46.80 $9.90 $9.25 $9.11 $0.00 $75.06
12/1/2027 $48.25 $9.90 $9.25 $9.11 $0.00 $76.51
6/1/2028 $49.75 $9.90 $9.25 $9.11 $0.00 $78.01
AIR TRACK OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $51.25 $9.90 $9.25 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $41.09 $9.90 $9.25 $9.21 $0.00 $69.45
12/1/2025 $42.47 $9.90 $9.25 $9.21 $0.00 $70.83
6/1/2026 $43.91 $9.90 $9.25 $9.21 $0.00 $72.27
AIR TRACK OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $45.35 $9.90 $9.25 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2025 $43.80 $14.50 $4.30 $6.75 $0.00 $69.35ASBESTOS WORKER (PIPES & TANKS)
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (WORCESTER)
12/1/2025 $44.80 $14.50 $4.30 $6.75 $0.00 $70.35
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
ASPHALT RAKER
LABORERS
LABORERS - ZONE 2
Page 2 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.59 $9.90 $9.25 $9.21 $0.00 $68.95
12/1/2025 $41.97 $9.90 $9.25 $9.21 $0.00 $70.33
6/1/2026 $43.41 $9.90 $9.25 $9.21 $0.00 $71.77
ASPHALT RAKER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.85 $9.90 $9.25 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
BACKHOE/FRONT-END LOADER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
BARCO-TYPE JUMPING TAMPER
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $41.09 $9.90 $9.25 $9.11 $0.00 $69.35
12/1/2025 $42.47 $9.90 $9.25 $9.11 $0.00 $70.73
6/1/2026 $43.91 $9.90 $9.25 $9.11 $0.00 $72.17
12/1/2026 $45.35 $9.90 $9.25 $9.11 $0.00 $73.61
6/1/2027 $46.80 $9.90 $9.25 $9.11 $0.00 $75.06
12/1/2027 $48.25 $9.90 $9.25 $9.11 $0.00 $76.51
6/1/2028 $49.75 $9.90 $9.25 $9.11 $0.00 $78.01
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS
LABORERS - ZONE 2
12/1/2028 $51.25 $9.90 $9.25 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $41.09 $9.90 $9.25 $9.21 $0.00 $69.45
12/1/2025 $42.47 $9.90 $9.25 $9.21 $0.00 $70.83
6/1/2026 $43.91 $9.90 $9.25 $9.21 $0.00 $72.27
BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &
HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $45.35 $9.90 $9.25 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
Page 3 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
BOILER MAKER
BOILERMAKERS LOCAL 29
BOILERMAKERS LOCAL 29
1/1/2024 $48.12 $7.07 $14.60 $6.00 $0.00 $75.79
2/1/2025 $63.66 $11.49 $15.57 $7.33 $0.00 $98.05
8/1/2025 $65.81 $11.49 $15.57 $7.33 $0.00 $100.20
2/1/2026 $67.16 $11.49 $15.57 $7.33 $0.00 $101.55
8/1/2026 $69.36 $11.49 $15.57 $7.33 $0.00 $103.75
BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
WATERPROOFING)
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (LOWELL)
2/1/2027 $70.76 $11.49 $15.57 $7.33 $0.00 $105.15
6/1/2025 $57.68 $15.55 $13.25 $3.25 $0.00 $89.73
12/1/2025 $59.12 $15.55 $13.25 $3.25 $0.00 $91.17
6/1/2026 $60.40 $15.55 $13.25 $3.25 $0.00 $92.45
BULLDOZER/GRADER/SCRAPER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
Apprentice: BOILER MAKER
Effective Date: 1/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
2 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
3 70.00 $33.68 $7.07 $10.03 $4.20 $0.00 $54.98
4 75.00 $36.09 $7.07 $10.74 $4.50 $0.00 $58.40
5 80.00 $38.50 $7.07 $11.45 $4.80 $0.00 $61.82
6 85.00 $40.90 $7.07 $12.18 $5.10 $0.00 $65.25
7 90.00 $43.31 $7.07 $12.88 $5.40 $0.00 $68.66
8 95.00 $45.71 $7.07 $13.62 $5.70 $0.00 $72.10
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 2/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $31.83 $11.49 $15.57 $7.33 $0.00 $66.22
2 60.00 $38.20 $11.49 $15.57 $7.33 $0.00 $72.59
3 70.00 $44.56 $11.49 $15.57 $7.33 $0.00 $78.95
4 80.00 $50.93 $11.49 $15.57 $7.33 $0.00 $85.32
5 90.00 $57.29 $11.49 $15.57 $7.33 $0.00 $91.68
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 8/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $32.91 $11.49 $15.57 $7.33 $0.00 $67.30
2 60.00 $39.49 $11.49 $15.57 $7.33 $0.00 $73.88
3 70.00 $46.07 $11.49 $15.57 $7.33 $0.00 $80.46
4 80.00 $52.65 $11.49 $15.57 $7.33 $0.00 $87.04
5 90.00 $59.23 $11.49 $15.57 $7.33 $0.00 $93.62
Page 4 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
12/1/2026 $61.84 $15.55 $13.25 $3.25 $0.00 $93.89
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $48.85 $9.90 $9.25 $9.80 $0.00 $77.80
12/1/2025 $50.35 $9.90 $9.25 $9.80 $0.00 $79.30
6/1/2026 $51.90 $9.90 $9.25 $9.80 $0.00 $80.85
CAISSON & UNDERPINNING BOTTOM MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $53.40 $9.90 $9.25 $9.80 $0.00 $82.35
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $47.70 $9.90 $9.25 $9.80 $0.00 $76.65
12/1/2025 $49.20 $9.90 $9.25 $9.80 $0.00 $78.15
6/1/2026 $50.75 $9.90 $9.25 $9.80 $0.00 $79.70
CAISSON & UNDERPINNING LABORER
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $52.25 $9.90 $9.25 $9.80 $0.00 $81.20
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $48.03 $9.90 $9.25 $9.80 $0.00 $76.98
12/1/2025 $49.53 $9.90 $9.25 $9.80 $0.00 $78.48
6/1/2026 $51.08 $9.90 $9.25 $9.80 $0.00 $80.03
CAISSON & UNDERPINNING TOP MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $52.58 $9.90 $9.25 $9.80 $0.00 $81.53
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
CARBIDE CORE DRILL OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
3/1/2025 $49.62 $9.83 $11.47 $8.50 $0.00 $79.42
9/1/2025 $50.87 $9.83 $11.47 $8.50 $0.00 $80.67
3/1/2026 $52.12 $9.83 $11.47 $8.50 $0.00 $81.92
9/1/2026 $53.37 $9.83 $11.47 $8.50 $0.00 $83.17
CARPENTER
CARPENTERS
CARPENTERS -ZONE 2 (Eastern Massachusetts)
3/1/2027 $54.62 $9.83 $11.47 $8.50 $0.00 $84.42
Apprentice: CARPENTER
Effective Date: 3/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $22.33 $9.83 $0.00 $1.73 $0.00 $33.89
2 45.00 $22.33 $9.83 $0.00 $1.73 $0.00 $33.89
3 55.00 $27.29 $9.83 $0.00 $3.40 $0.00 $40.52
4 55.00 $27.29 $9.83 $0.00 $3.40 $0.00 $40.52
5 70.00 $34.73 $9.83 $11.41 $5.10 $0.00 $61.07
6 70.00 $34.73 $9.83 $11.41 $5.10 $0.00 $61.07
7 80.00 $39.70 $9.83 $11.44 $6.80 $0.00 $67.77
8 80.00 $39.70 $9.83 $11.44 $6.80 $0.00 $67.77
Page 5 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
10/1/2024 $26.65 $7.02 $3.80 $1.00 $0.00 $38.47
10/1/2025 $27.75 $7.02 $3.80 $1.00 $0.00 $39.57
CARPENTER WOOD FRAME
CARPENTERS
CARPENTERS-ZONE 3 (Wood Frame) 10/1/2026 $28.85 $7.02 $3.80 $1.00 $0.00 $40.67
All Aspects of New Wood Frame Work
CEMENT MASONRY/PLASTERING 7/1/2024 $49.19 $13.35 $16.43 $7.78 $1.80 $88.55
Apprentice: CARPENTER
Effective Date: 9/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $22.89 $9.83 $0.00 $1.73 $0.00 $34.45
2 45.00 $22.89 $9.83 $0.00 $1.73 $0.00 $34.45
3 55.00 $27.98 $9.83 $0.00 $3.40 $0.00 $41.21
4 55.00 $27.98 $9.83 $0.00 $3.40 $0.00 $41.21
5 70.00 $35.61 $9.83 $11.41 $5.10 $0.00 $61.95
6 70.00 $35.61 $9.83 $11.41 $5.10 $0.00 $61.95
7 80.00 $40.70 $9.83 $11.44 $6.80 $0.00 $68.77
8 80.00 $40.70 $9.83 $11.44 $6.80 $0.00 $68.77
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $15.99 $7.02 $0.00 $0.00 $0.00 $23.01
2 60.00 $15.99 $7.02 $0.00 $0.00 $0.00 $23.01
3 65.00 $17.32 $7.02 $0.00 $1.00 $0.00 $25.34
4 70.00 $18.66 $7.02 $0.00 $1.00 $0.00 $26.68
5 75.00 $19.99 $7.02 $3.80 $1.00 $0.00 $31.81
6 80.00 $21.32 $7.02 $3.80 $1.00 $0.00 $33.14
7 85.00 $22.65 $7.02 $3.80 $1.00 $0.00 $34.47
8 90.00 $23.99 $7.02 $3.80 $1.00 $0.00 $35.81
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $16.65 $7.02 $0.00 $0.00 $0.00 $23.67
2 60.00 $16.65 $7.02 $0.00 $0.00 $0.00 $23.67
3 65.00 $18.04 $7.02 $0.00 $1.00 $0.00 $26.06
4 70.00 $19.43 $7.02 $0.00 $1.00 $0.00 $27.45
5 75.00 $20.81 $7.02 $3.80 $1.00 $0.00 $32.63
6 80.00 $22.20 $7.02 $3.80 $1.00 $0.00 $34.02
7 85.00 $23.59 $7.02 $3.80 $1.00 $0.00 $35.41
8 90.00 $24.98 $7.02 $3.80 $1.00 $0.00 $36.80
Page 6 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (LOWELL)
6/1/2025 $40.59 $9.90 $9.25 $9.11 $0.00 $68.85
12/1/2025 $41.97 $9.90 $9.25 $9.11 $0.00 $70.23
6/1/2026 $43.41 $9.90 $9.25 $9.11 $0.00 $71.67
12/1/2026 $44.85 $9.90 $9.25 $9.11 $0.00 $73.11
6/1/2027 $46.30 $9.90 $9.25 $9.11 $0.00 $74.56
12/1/2027 $47.75 $9.90 $9.25 $9.11 $0.00 $76.01
6/1/2028 $49.25 $9.90 $9.25 $9.11 $0.00 $77.51
CHAIN SAW OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $50.75 $9.90 $9.25 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $59.51 $15.55 $13.25 $3.25 $0.00 $91.56
12/1/2025 $60.98 $15.55 $13.25 $3.25 $0.00 $93.03
6/1/2026 $62.31 $15.55 $13.25 $3.25 $0.00 $94.36
CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $63.79 $15.55 $13.25 $3.25 $0.00 $95.84
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $37.52 $15.55 $13.25 $3.25 $0.00 $69.57
12/1/2025 $38.47 $15.55 $13.25 $3.25 $0.00 $70.52
6/1/2026 $39.33 $15.55 $13.25 $3.25 $0.00 $71.38
COMPRESSOR OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $40.28 $15.55 $13.25 $3.25 $0.00 $72.33
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DELEADER (BRIDGE)
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 2
1/1/2025 $58.46 $9.95 $11.85 $12.10 $0.00 $92.36
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 7/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.60 $13.35 $16.43 $0.00 $0.00 $54.38
2 60.00 $29.51 $13.35 $16.43 $2.78 $1.80 $63.87
3 65.00 $31.97 $13.35 $16.43 $3.78 $1.80 $67.33
4 70.00 $34.43 $13.35 $16.43 $4.78 $1.80 $70.79
5 75.00 $36.89 $13.35 $16.43 $5.78 $1.80 $74.25
6 80.00 $39.35 $13.35 $16.43 $6.78 $1.80 $77.71
7 90.00 $44.27 $13.35 $16.43 $7.78 $1.80 $83.63
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.23 $9.95 $0.00 $0.00 $0.00 $39.18
2 55.00 $32.15 $9.95 $0.00 $6.66 $0.00 $48.76
3 60.00 $35.08 $9.95 $0.00 $7.26 $0.00 $52.29
Page 7 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
6/2/2025 $47.75 $9.90 $9.25 $9.65 $0.00 $76.55
12/1/2025 $49.25 $9.90 $9.25 $9.65 $0.00 $78.05
6/1/2026 $50.80 $9.90 $9.25 $9.65 $0.00 $79.60
12/7/2026 $52.30 $9.90 $9.25 $9.65 $0.00 $81.10
6/7/2027 $53.90 $9.90 $9.25 $9.65 $0.00 $82.70
12/6/2027 $55.50 $9.90 $9.25 $9.65 $0.00 $84.30
6/5/2028 $57.18 $9.90 $9.25 $9.65 $0.00 $85.98
DEMO: ADZEMAN
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.85 $9.90 $9.25 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $48.75 $9.90 $9.25 $9.65 $0.00 $77.55
12/1/2025 $50.25 $9.90 $9.25 $9.65 $0.00 $79.05
6/1/2026 $51.80 $9.90 $9.25 $9.65 $0.00 $80.60
12/7/2026 $53.30 $9.90 $9.25 $9.65 $0.00 $82.10
6/7/2027 $54.90 $9.90 $9.25 $9.65 $0.00 $83.70
12/6/2027 $56.50 $9.90 $9.25 $9.65 $0.00 $85.30
6/5/2028 $58.18 $9.90 $9.25 $9.65 $0.00 $86.98
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.85 $9.90 $9.25 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $48.50 $9.90 $9.25 $9.65 $0.00 $77.30
12/1/2025 $50.00 $9.90 $9.25 $9.65 $0.00 $78.80
6/1/2026 $51.55 $9.90 $9.25 $9.65 $0.00 $80.35
12/7/2026 $53.05 $9.90 $9.25 $9.65 $0.00 $81.85
6/7/2027 $54.65 $9.90 $9.25 $9.65 $0.00 $83.45
12/6/2027 $56.25 $9.90 $9.25 $9.65 $0.00 $85.05
6/5/2028 $57.93 $9.90 $9.25 $9.65 $0.00 $86.73
DEMO: BURNERS
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.60 $9.90 $9.25 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $48.75 $9.90 $9.25 $9.65 $0.00 $77.55
12/1/2025 $50.25 $9.90 $9.25 $9.65 $0.00 $79.05
6/1/2026 $51.80 $9.90 $9.25 $9.65 $0.00 $80.60
12/7/2026 $53.30 $9.90 $9.25 $9.65 $0.00 $82.10
6/7/2027 $54.90 $9.90 $9.25 $9.65 $0.00 $83.70
12/6/2027 $56.50 $9.90 $9.25 $9.65 $0.00 $85.30
6/5/2028 $58.18 $9.90 $9.25 $9.65 $0.00 $86.98
DEMO: CONCRETE CUTTER/SAWYER
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.85 $9.90 $9.25 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
4 65.00 $38.00 $9.95 $0.00 $7.87 $0.00 $55.82
5 70.00 $40.92 $9.95 $11.85 $8.47 $0.00 $71.19
6 75.00 $43.85 $9.95 $11.85 $9.08 $0.00 $74.73
7 80.00 $46.77 $9.95 $11.85 $9.68 $0.00 $78.25
8 90.00 $52.61 $9.95 $11.85 $10.89 $0.00 $85.30
Page 8 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
6/2/2025 $48.50 $9.90 $9.25 $9.65 $0.00 $77.30
12/1/2025 $50.00 $9.90 $9.25 $9.65 $0.00 $78.80
6/1/2026 $51.55 $9.90 $9.25 $9.65 $0.00 $80.35
12/7/2026 $53.05 $9.90 $9.25 $9.65 $0.00 $81.85
6/7/2027 $54.65 $9.90 $9.25 $9.65 $0.00 $83.45
12/6/2027 $56.25 $9.90 $9.25 $9.65 $0.00 $85.05
6/5/2028 $57.93 $9.90 $9.25 $9.65 $0.00 $86.73
DEMO: JACKHAMMER OPERATOR
LABORERS
LABORERS - ZONE 2
12/4/2028 $59.60 $9.90 $9.25 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/2/2025 $47.75 $9.90 $9.25 $9.65 $0.00 $76.55
12/1/2025 $49.25 $9.90 $9.25 $9.65 $0.00 $78.05
6/1/2026 $50.80 $9.90 $9.25 $9.65 $0.00 $79.60
12/7/2026 $52.30 $9.90 $9.25 $9.65 $0.00 $81.10
6/7/2027 $53.90 $9.90 $9.25 $9.65 $0.00 $82.70
12/6/2027 $55.50 $9.90 $9.25 $9.65 $0.00 $84.30
6/5/2028 $57.18 $9.90 $9.25 $9.65 $0.00 $85.98
DEMO: WRECKING LABORER
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.85 $9.90 $9.25 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/1/2025 $57.68 $15.55 $13.25 $3.25 $0.00 $89.73
12/1/2025 $59.12 $15.55 $13.25 $3.25 $0.00 $91.17
6/1/2026 $60.40 $15.55 $13.25 $3.25 $0.00 $92.45
DIRECTIONAL DRILL MACHINE OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $61.84 $15.55 $13.25 $3.25 $0.00 $93.89
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $78.11 $10.08 $11.62 $12.67 $0.00 $112.48 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Diver wage 70/80/90 2A $69.83, 3A $91.79,4A $102.14 Total Rate
DIVER TENDER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $51.97 $10.08 $11.62 $12.67 $0.00 $86.34 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Piledriver wage 70/80/90 2A $54.20, 3A $73.93,4A $82.05 Total Rate
DIVER TENDER (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $83.69 $10.08 $11.62 $12.67 $0.00 $118.06
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER/SLURRY (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 2)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
DRAWBRIDGE OPERATOR (Construction)
DRAWBRIDGE - SEIU LOCAL 888
DRAWBRIDGE - SEIU LOCAL 888
7/1/2020 $26.77 $6.67 $3.93 $0.00 $0.16 $37.53
9/1/2024 $47.05 $13.99 $14.04 $5.18 $0.00 $80.26
9/7/2025 $48.16 $14.98 $14.30 $5.30 $0.00 $82.74
ELECTRICIAN
ELECTRICIANS LOCAL 96
ELECTRICIANS LOCAL 96
Page 9 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
9/6/2026 $49.38 $15.96 $14.57 $5.43 $0.00 $85.34
1/1/2025 $62.83 $16.28 $10.96 $10.40 $0.00 $100.47
1/1/2026 $63.68 $16.38 $11.06 $10.70 $0.00 $101.82
ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORS LOCAL 41
ELEVATOR CONSTRUCTORS LOCAL 41
1/1/2027 $64.53 $16.48 $11.16 $11.00 $0.00 $103.17
Apprentice: ELECTRICIAN
Effective Date: 9/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $18.82 $13.99 $0.56 $0.00 $0.00 $33.37
2 45.00 $21.17 $13.99 $0.64 $0.00 $0.00 $35.80
3 48.00 $22.58 $13.99 $13.31 $2.48 $0.00 $52.36
4 55.00 $25.88 $13.99 $13.41 $2.85 $0.00 $56.13
5 65.00 $30.58 $13.99 $13.55 $3.36 $0.00 $61.48
6 80.00 $37.64 $13.99 $13.76 $4.14 $0.00 $69.53
Apprentice: ELECTRICIAN
Effective Date: 9/7/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $19.26 $14.98 $0.58 $0.00 $0.00 $34.82
2 45.00 $21.67 $14.98 $0.65 $0.00 $0.00 $37.30
3 48.00 $23.12 $14.98 $13.55 $2.54 $0.00 $54.19
4 55.00 $26.49 $14.98 $13.65 $2.92 $0.00 $58.04
5 65.00 $31.30 $14.98 $13.80 $3.45 $0.00 $63.53
6 80.00 $38.53 $14.98 $14.02 $4.24 $0.00 $71.77
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $31.42 $16.28 $0.00 $0.00 $0.00 $47.70
2 55.00 $34.56 $16.28 $10.96 $10.40 $0.00 $72.20
3 65.00 $40.84 $16.28 $10.96 $10.40 $0.00 $78.48
4 70.00 $43.98 $16.28 $10.96 $10.40 $0.00 $81.62
5 80.00 $50.26 $16.28 $10.96 $10.40 $0.00 $87.90
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $31.84 $16.38 $0.00 $0.00 $0.00 $48.22
2 55.00 $35.02 $16.38 $11.06 $10.70 $0.00 $73.16
Page 10 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
1/1/2025 $43.98 $16.28 $10.96 $10.40 $0.00 $81.62
1/1/2026 $44.58 $16.38 $11.06 $10.70 $0.00 $82.72
ELEVATOR CONSTRUCTOR HELPER
ELEVATOR CONSTRUCTORS LOCAL 41
ELEVATOR CONSTRUCTORS LOCAL 41
1/1/2027 $45.17 $16.48 $11.16 $11.00 $0.00 $83.81
For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR"
6/1/2025 $40.59 $9.90 $9.25 $9.21 $0.00 $68.95
12/1/2025 $41.97 $9.90 $9.25 $9.21 $0.00 $70.33
6/1/2026 $43.41 $9.90 $9.25 $9.21 $0.00 $71.77
FENCE & GUARD RAIL ERECTOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $44.85 $9.90 $9.25 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
5/1/2025 $53.22 $15.30 $13.15 $3.25 $0.00 $84.92
11/1/2025 $54.51 $15.30 $13.15 $3.25 $0.00 $86.21
5/1/2026 $55.95 $15.30 $13.15 $3.25 $0.00 $87.65
11/1/2026 $57.24 $15.30 $13.15 $3.25 $0.00 $88.94
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $58.67 $15.30 $13.15 $3.25 $0.00 $90.37
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
5/1/2025 $54.82 $15.30 $13.15 $3.25 $0.00 $86.52
11/1/2025 $56.12 $15.30 $13.15 $3.25 $0.00 $87.82
5/1/2026 $57.57 $15.30 $13.15 $3.25 $0.00 $89.27
11/1/2026 $58.87 $15.30 $13.15 $3.25 $0.00 $90.57
FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $60.32 $15.30 $13.15 $3.25 $0.00 $92.02
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
5/1/2025 $26.22 $15.30 $13.15 $3.25 $0.00 $57.92
11/1/2025 $26.98 $15.30 $13.15 $3.25 $0.00 $58.68
5/1/2026 $27.83 $15.30 $13.15 $3.25 $0.00 $59.53
11/1/2026 $28.59 $15.30 $13.15 $3.25 $0.00 $60.29
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $29.44 $15.30 $13.15 $3.25 $0.00 $61.14
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
9/1/2024 $47.05 $13.99 $14.04 $5.18 $0.00 $80.26
9/7/2025 $48.16 $14.98 $14.30 $5.30 $0.00 $82.74
FIRE ALARM INSTALLER
ELECTRICIANS LOCAL 96
ELECTRICIANS LOCAL 96
9/6/2026 $49.38 $15.96 $14.57 $5.43 $0.00 $85.34
For apprentice rates see "Apprentice- ELECTRICIAN"
9/1/2024 $47.05 $13.99 $14.04 $5.18 $0.00 $80.26
9/7/2025 $48.16 $14.98 $14.30 $5.30 $0.00 $82.74
FIRE ALARM REPAIR / MAINT/COMMISSIONING
ELECTRICIANS LOCAL 96
ELECTRICIANS LOCAL 96
9/6/2026 $49.38 $15.96 $14.57 $5.43 $0.00 $85.34
For apprentice rates see "Apprentice- ELECTRICIAN"
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
3 65.00 $41.39 $16.38 $11.06 $10.70 $0.00 $79.53
4 70.00 $44.58 $16.38 $11.06 $10.70 $0.00 $82.72
5 80.00 $50.94 $16.38 $11.06 $10.70 $0.00 $89.08
Page 11 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
6/1/2025 $47.02 $15.55 $13.25 $3.25 $0.00 $79.07
12/1/2025 $48.19 $15.55 $13.25 $3.25 $0.00 $80.24
6/1/2026 $49.25 $15.55 $13.25 $3.25 $0.00 $81.30
FIREMAN (ASST. ENGINEER)
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $50.43 $15.55 $13.25 $3.25 $0.00 $82.48
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $28.09 $9.90 $9.25 $9.21 $0.00 $56.45
12/1/2025 $28.09 $9.90 $9.25 $9.21 $0.00 $56.45
6/1/2026 $29.21 $9.90 $9.25 $9.21 $0.00 $57.57
FLAGGER & SIGNALER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $29.21 $9.90 $9.25 $9.21 $0.00 $57.57
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
FLOORCOVERER
FLOORCOVERERS LOCAL 2168
FLOORCOVERERS LOCAL 2168 ZONE II
3/1/2024 $49.47 $8.83 $11.47 $8.80 $0.00 $78.57
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
FORK LIFT/CHERRY PICKER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2025 $37.52 $15.55 $13.25 $3.25 $0.00 $69.57
12/1/2025 $38.47 $15.55 $13.25 $3.25 $0.00 $70.52
6/1/2026 $39.33 $15.55 $13.25 $3.25 $0.00 $71.38
GENERATOR/LIGHTING PLANT/HEATERS
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $40.28 $15.55 $13.25 $3.25 $0.00 $72.33
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
GLAZIERS LOCAL 35
GLAZIERS LOCAL 35 (ZONE 2)
1/1/2025 $47.96 $9.95 $11.85 $12.10 $0.00 $81.86
Apprentice: FLOORCOVERER
Effective Date: 3/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.74 $8.83 $0.00 $1.76 $0.00 $35.33
2 55.00 $27.21 $8.83 $0.00 $1.76 $0.00 $37.80
3 60.00 $29.68 $8.83 $0.00 $3.52 $0.00 $42.03
4 65.00 $32.16 $8.83 $0.00 $3.52 $0.00 $44.51
5 70.00 $34.63 $8.83 $11.47 $5.28 $0.00 $60.21
6 75.00 $37.10 $8.83 $11.47 $5.28 $0.00 $62.68
7 80.00 $39.58 $8.83 $11.47 $7.04 $0.00 $66.92
8 85.00 $42.05 $8.83 $11.47 $7.04 $0.00 $69.39
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 1/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
Page 12 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
6/1/2025 $58.33 $15.55 $13.25 $3.25 $0.00 $90.38
12/1/2025 $59.78 $15.55 $13.25 $3.25 $0.00 $91.83
6/1/2026 $61.08 $15.55 $13.25 $3.25 $0.00 $93.13
HOISTING ENGINEER/CRANES/GRADALLS
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.53 $15.55 $13.25 $3.25 $0.00 $94.58
2/1/2025 $59.13 $14.91 $18.74 $9.53 $2.98 $105.29
8/1/2025 $60.98 $14.91 $18.74 $9.53 $2.98 $107.14
HVAC (DUCTWORK)
SHEETMETAL WORKERS LOCAL 17
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 1/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $23.98 $9.95 $0.00 $0.00 $0.00 $33.93
2 55.00 $26.38 $9.95 $0.00 $6.66 $0.00 $42.99
3 60.00 $28.78 $9.95 $0.00 $7.26 $0.00 $45.99
4 65.00 $31.17 $9.95 $0.00 $7.87 $0.00 $48.99
5 70.00 $33.57 $9.95 $11.85 $8.47 $0.00 $63.84
6 75.00 $35.97 $9.95 $11.85 $9.08 $0.00 $66.85
7 80.00 $38.37 $9.95 $11.85 $9.68 $0.00 $69.85
8 90.00 $43.16 $9.95 $11.85 $10.89 $0.00 $75.85
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 6/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $32.08 $0.00 $0.00 $0.00 $0.00 $32.08
2 60.00 $35.00 $15.55 $13.25 $3.25 $0.00 $67.05
3 65.00 $37.91 $15.55 $13.25 $3.25 $0.00 $69.96
4 70.00 $40.83 $15.55 $13.25 $3.25 $0.00 $72.88
5 75.00 $43.75 $15.55 $13.25 $3.25 $0.00 $75.80
6 80.00 $46.66 $15.55 $13.25 $3.25 $0.00 $78.71
7 85.00 $49.58 $15.55 $13.25 $3.25 $0.00 $81.63
8 90.00 $52.50 $15.55 $13.25 $3.25 $0.00 $84.55
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 12/1/2025
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $32.88 $0.00 $0.00 $0.00 $0.00 $32.88
2 60.00 $35.87 $15.55 $13.25 $3.25 $0.00 $67.92
3 65.00 $38.86 $15.55 $13.25 $3.25 $0.00 $70.91
4 70.00 $41.85 $15.55 $13.25 $3.25 $0.00 $73.90
5 75.00 $44.84 $15.55 $13.25 $3.25 $0.00 $76.89
6 80.00 $47.82 $15.55 $13.25 $3.25 $0.00 $79.87
7 85.00 $50.81 $15.55 $13.25 $3.25 $0.00 $82.86
8 90.00 $53.80 $15.55 $13.25 $3.25 $0.00 $85.85
Page 13 of 33Wage Request Number: 20250710122426Issue Date: 07/10/2025
Supplemental
Unemployment Total Rate
SHEETMETAL WORKERS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .