Barge Crane Service 013.doc

DOC document 75 KB Posted

Attached to
CRANE SERVICE Federal contract opportunity
Solicitation number
70Z02924QNEWO013
Issued by
Department of Homeland Security US Coast Guard

About this file

This document includes a statement of work for barge crane services and a related federal contract opportunity solicitation. The statement of work requires a contractor to provide a barge crane capable of lifting 9,000 pounds to remove and reinstall an Allied Marine crane boom from a Coast Guard cutter on February 13th and March 6th, 2023. The work is to take place at the Coast Guard's facility in St. Louis, Missouri between the hours of 7:00 am to 3:00 pm. The solicitation is seeking quotes for the barge crane services in accordance with the statement of work specifications. The solicitation number is 70Z02924QNEWO013 and is set aside as a small business opportunity. The award will be a firm fixed price service purchase order made to the lowest priced vendor meeting requirements.

View the file

Other files for this federal contract opportunity

Other files attached to CRANE SERVICE, newest first.
File Type Posted
Commercial_Supplies_Services_Clauses 2023.pdf PDF
sf 1449 Crane Service 52065 013.pdf PDF
Wage Rate 2023 15 5075 St Louis.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19-Oct-23

BARGE CRANE SERVICE

In conjunction with the work being done during the vessel’s dockside availability, this work item describes the requirements for the Contractor to provide a barge crane to remove equipment from and to the Coast Guard Barge and Tender.

Project Manager:

Mr. James Tepen

Industrial Detachment Supervisor*

Office (314) 771-6044 x 2103

Cell (314) 565-8893 Email james.a.tepen@uscg.mil *Visits for possible estimates must be scheduled with the Industrial Detachment Supervisor Dockside Location: CG Schlimme Industrial Facility

100 Arsenal Street

Building 17

St. Louis, MO 63118

Location Work Hours: 0700 – 1500 (All work outside of these hours requires advanced approval from the Project Manager Vessel: USCGC GASCONADE (WLR 75401) Homeport: St Louis, MO.

POC: MKC Michael Graham or Cutter Representative (402) 672-4665 *Visits for possible estimates must be scheduled with cutter.

Remove Equipment: 13 Feb 2024 (8:00 am – 1:00 pm) Reinstall Equipment: 06 Mar 2024 (8:00 am – 1:00 pm)

NOTE

Work MUST begin on start date unless otherwise coordinated with project the manager.

NOTE

Crane must be capable of mooring outboard of the USCG cutter, hoisting 9000 lbs and lowering it on the USCG pier. Approximately 80’ lift and 70’ outreach

1. SCOPE

1.1 This work item describes the requirements for the Contractor to remove and reinstall the following equipment:

· 1ea Allied Marine Crane, TK20-50 Boom

9000lbs

2. REQUIREMENTS

2.1 General. The Contractor shall provide a barge crane with sufficient lifting capacity for the above listed equipment for a minimum period of five (5) hours on the dates specified above. Positioning of the Barge crane shall be outboard of the Coast Guard Barge and the Allied Marine Crane boom shall be hoisted approximately 80’ to the main pier, approximately 70’ outreach. Prior to equipment removal and following equipment reinstallation contractor shall move various tools to and from main pier to floating pier and Coast Guard Barge.

2.2 Equipment Removal. The Contractor shall lift equipment from the Coast Guard Barge to the main pier (approx. 80 feet above floating pier & 70 feet from centerline of the contracted floating crane) using lifting slings and straps provided by the Coast Guard. All equipment will be unfastened, unwired, and readied for removal by Coast Guard personnel.

NOTE

Crane will be required to hold the load over the main pier for an unspecified time while the equipment is positioned on platforms and/or trailers.

SAFETY CAUTION!

All lifting and/or movement of the crane will be directed by a Coast Guard Deck Supervisor (Yellow Hard Hat).

2.3 Equipment Reinstall. The Contractor shall lift equipment from the main pier to the Coast Guard Barge for reinstallation by Coast Guard personnel using lifting slings and straps provided by the Coast Guard.

NOTE

Crane will be required to hold the load over the Coast Guard Barge for an unspecified time while the equipment is positioned and fastened into place.

SAFETY CAUTION!

All lifting and/or movement of the crane will be directed by a Coast Guard Deck Supervisor (Yellow Hard Hat).

3. Quality Assurance

3.1 Certification. Contractor shall provided proof of Certified Weight Test of crane and weight handling equipment within the last twelve (12) months. Proof must be emailed to the project manager no later than one (1) week prior to start of project.

4. Notes

4.1 All persons conducting business with or at the ISC Industrial Coast Guard

Facility and onboard Coast Guard Cutters while moored at this facility are required to meet all applicable safety requirements including weather conditions set forth by the Coast Guard Industrial Facility and the Army Corps of Engineers.

BARGE CRANE CONTRACTORS

ISC INDUSTRIAL ST. LOUIS, MO

Material Sales
Phone:
(314) 436-1541
Foot of Gratiot St.
Fax:
St Louis
MO
63102
POC: Eric Kolberg

Email: marinerepair@materialsales.co

Budrovich Marine
Phone:
(314) 892-3030
10328 Lake Bluff Drive
Fax:
St Louis
MO
63123
POC: Mindy Budrovich

Email:

Alberici Construction
Phone:
(314) 771-6908
3200 South 9th St
Fax:
St Louis
MO
63118
POC:

Email:

Massman Construction
Phone:
(314) 741-1041
11618 Riverview Dr
Fax:
St Louis
MO
63138
POC:

Email: