This document is a Request for Information (RFI) for a backflow preventer installation project involving the City of Portland Water Bureau and a federal installation. The RFI covers two locations with potential installation of backflow preventers, involving two Contract Line Items (CLINs). The project includes replacing existing backflow preventers, installing spool pieces, modifying vaults, and potentially burying electrical conduit. Funding is approved for the first location, with possible future approval for the second location. Work hours are specified as 0700-1600 (7-4), and a laydown area will be provided for secured material storage.
Key technical details include requirements for City of Portland permits, confirmation of shut-off locations, equipment selection based on city and code requirements, and specific constraints on work procedures. Contractors must perform all work on the same side of secure fences, use dirt as acceptable fill material, and coordinate electrical conduit installation with OMD personnel. The project involves specific technical specifications for RPBA and Hotbox equipment, with utility drawings to be provided upon successful bid. Electrical work will require the contractor to run conduit to within 6 inches of the connection point, with final connections to be made by OMD personnel.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Backflow Preventer RFI’s
1. Under SW-3 for both CLIN#1 & CLIN#2 it lists 'pull permit for 10" RPBA installation'
And under SW-5 PERMITS it says 'this section in N/A as permits are not required on federal installations'
a. This will require a city of Portland permit as it is our main connection to the city’s mains
2. During the pre-bid conference, I was told a 2nd backflow preventer was discussed for the other side of the property.
a. See updated scope of work.
3. Should that be included with this bid or will there be a separate bid at a later date for the second one?
a. Two clins will be on the bid. Funding for the first one is approved. Possible approval for second.
4. When we do the alteration to the back flow device, do we want to fill in the vault? Is dirt acceptable as a fill?
a. Dirt is an acceptable fill.
5. We need a shut off on the base side of the devices to be able to do the work without interruption to your operations. Does that exist?
a. The base has a loop system that has 2 city mains. Shutting one down will not affect operations.
6. It was my understanding you wanted us to bury a conduit for the electrical work to be done. You indicated you would take care of the electrical wiring and connections.
Is that correct? What size conduit do we need to install for you?
a. That is correct, wire and conduit size based on heater need.
7. On the primary backflow and PRV removal, it is understood we are putting in a spool piece of pipe and not back filling the second vault. Is that correct?
a. Bypassing the PRV and leaving the vault open is acceptable.
8. We wanted to see if there were plans, pictures, specifications, or drawings for the backflow preventor for this ITB. Please let me know if there are any other supporting documents we can use for bidding.
a. Specs are based on City of Portland and Code requirements.
9. Regarding location #1 - Please provide any drawings showing the runs of existing plumbing supply lines running from the City meter to the existing backflow preventer and the pressure reducer.
a. It’s a simple 10 foot run from the city meter to the devices. Utility drawings will be provided upon successful bid.
10. Regarding location #1 - Please confirm with the pressure reducer removal, this assembly is to be superseded only with a spool piece and the run can remain in the existing vault.
a. See answer on #7
11. Regarding location #1 - Please confirm the shut-off locations.
a. We have confirmed shut off locations.
12. Regarding location #1 - Please confirm the RPBA equipment selection, including approved make and model.
a. Equipment based on city of Portland and code requirements.
13. Regarding location #1 - Please confirm the Hotbox equipment selection, including approved make and model.
a. See above.
14. Regarding location #2 - Please provide any drawings showing the runs of existing plumbing supply lines running from the City meter to the existing backflow preventer.
a. See answer on #9
15. Regarding location #2 - Please confirm the shut-off locations.
a. See #11
16. Regarding location #2 - Please confirm the RPBA equipment selection, including approved make and model.
a. See #12
17. Regarding location #2 - Please confirm the Hotbox equipment selection, including approved make and model.
a. See #12
18. Regarding location #2 - Please confirm local permits are not required in this area.
a. Permits are required in location #2
19. General - Please confirm hours of accessibility/work
a. 0700-1600 (7-4)
20. General - Please confirm if overnight lay down area is provided to accommodate equipment/material storage.
a. Laydown area provided as long as materials can be secured.
21. General - please confirm if it's acceptable for Contractor to run the electrical conduit to within 6’’ of point of connection and the OMD personnel will provide/install the conductors and make final connection.
a. That is acceptable.
22. Is there a Specification of the new backflow device being installed?
a. See #12.
23. Is there a permit required for all the structure Modifications work and sitework?
a. Only if required by City of Portland Water Bureau.
24. Will it be acceptable to reach equipment over the secure fence to access any of the sites? such as Cranes, Concrete Pumps, dewatering pumps, etc...
a. No All work must be done on the same side of the fence as the devices.