Back River Drainage 100% Plan Set.pdf
PDF 6 MB Posted
- Solicitation number
- 57053
- Issued by
- Poquoson City, Virginia
About this file
This document contains the 100% plan set for the Back River Drainage Improvements project being conducted by the City of Poquoson, Virginia Department of Engineering. The project aims to facilitate the improvement of drainage flow along the outfall channel into Back River. The plan set includes an existing conditions plan, erosion and sediment control plan, project plan, bulkhead details, and bulkhead notes. Key elements include the removal of a dilapidated boathouse, installation of riprap, and replacement of a white PVC fence. Construction notes indicate that removal and reinstallation of the fence is not part of the contract and will be handled separately. This work is being procured through Invitation for Bid (IFB) #24-004 issued by the City of Poquoson.
The IFB calls for contractors to submit bids to execute the drainage improvements outlined in the 100% plan set. Pricing terms, set asides, funding sources, and award details are not provided in the plan set document. Contractors will need to review the full IFB solicitation for those specifics.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 24-004 Back River Drainage Improvement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I:
\P r o j e c ts \9
\9
-1 -B a c k
R iv e r
D r a in a g e
Im p r o v \B
IM
-C
A D \9
-1 S h e e ts \d
-1 1.
d g n
WMP
SAK
DRAINAGE IMPROVEMENTS
BACK RIVER
2/28/2023
CAD
DEPARTMENT OF ENGINEERING
CITY OF POQUOSON
S. Crawford
DRAWN BY
APPROVED BY
DESIGNED BY
DATE
CITY PROJECT MANAGER
SHEET NO.
100% PLANS
TITLE SHEET
Copyright 2023, City Poquoson, Virginia
PROJECT LOCATION
INDEX OF SHEETS
TITLE SHEET1
1A
1B
3A
3B
EXISTING CONDITIONS PLAN
EROSION AND SEDIMENT CONTROL PLAN
PROJECT PLAN
BULKHEAD DETAILS
BULKHEAD NOTES
CITY OF POQUOSON, VIRGINIA
DEPARTMENT OF ENGINEERING
BACK RIVER DRAINAGE IMPROVEMENTS
0 700' 1400'
SCALE
SCALE
25' 50'
1A
EXISTING CONDITIONS PLAN
I:
\P r o j e c ts \9
\9
-1 -B a c k
R iv e r
D r a in a g e
Im p r o v \B
IM
-C
A D \9
-1 S h e e ts \d
-1 1A .d g n
DRAINAGE IMPROVEMENTS
BACK RIVER
2/28/2023
DEPARTMENT OF ENGINEERING
CITY OF POQUOSON
S. Crawford
DRAWN BY
APPROVED BY
DESIGNED BY
DATE
CITY PROJECT MANAGER
SHEET NO.
WOODEN
BRIDGE
PVC
FENCE
GARAGE
2-S-FRM
29.5
.2
30.3
.2
.3
13.7'
2.9'
5.8'
.1
7.5'
.5
1.2'
.8
1.2'
22.6'
.1
.1
8.7'
#9
2-S-FRM
W O
O D
P O
R C
H
ASPHALT DRIVE
PVC FENCE
WOOD FENCE
CHAIN
LINK F
ENCE
HEAVY BRUSH/
TREES
N °0
'3
W .0
N79°19 '21"E
192.
09'
N83°59'3 0"E
178.59'
S °0
'3
W
.1
9.31'(PLAT)
9.16'(FIELD)
S79° 29'3
0"W
356.
81'
.2
.1
.2
F E
N C
E
W O
O D
S77 °13'5
8"W
.11'(
FIELD)
.07'
(PLAT)
N88°46'39"E
75.35'(FIELD)
75.15'(PLAT)
N °5
'2
E
.0
N °2
'2
W
.9
LTP
N °0
'3
W
.0
P L
A T
.7
T O
P
IP
E
C O
R N
E R
.3
O F F
P.B. 9, PG. 93
WINDY POINT
SECTION 2
LOT 8
LOT 7
24,803 S.F. (FIELD)
24,786 S.F. (PLAT)
TRANS.
INV.=-
1.34'
INV.=1.65'
INV.=0.40'
TOP=3.00'
SURVEY BENCHMARK
TOP OF DI
18"R
CP
12"RCP
MULCH
PG. 765
D.B. 403, ⅊
P.B. 6, PG. 112
⅊
P .B
P G
U T
IL
IT
Y
E A
S E
M E
N T
D R
A
IN
A G
N
D
D .B
P G
D R
A
IN
A
S E
M E
N T
C
F
P
O Q
U O
S
P.B. 6, PG. 112
BANNOCKBURN
LOT 19
0.820± AC.
P.B. 8, PG. 477
WINDY POINT
SECTION 1
LOT 6
P.B. 8, PG. 477
WINDY POINT
SECTION 1
LOT 50
TROTTWOOD DRIVE
50' R/W
R O
A D
R O
B E
R T
B
U C
R
W
P
ID
W
IL
L
IA
M S ,J
U X
E A
L
N
F
P
ID
M A
C D
O N
A
U X
J E F F
E R
S
N
F
P
ID
M A
U
N C
U X
N
F
P
ID
H E
A T
H
H
R R
E
J
S
F
O F F
.0
.1
O N
.9
O N
O F F
.0
.9
O N
.8
O N
PID #28-01-00-0095
ETALS
PEGGY C. LINTHICUM,
N/F
E
M
.3
T O
P
C
BULKHEAD
DILAPIDATED
BULKHEAD
DILAPIDATED
3 3
D
IL
A P
ID
A T
L K
H E
A D
DILAPIDATED
BOATHOUSE
C A
N A
L
DILAPIDATED
PIER
CB=S12°13'55"W
C=59.80'
T=32.99' Δ=50°0
L=61.74'
R=70.71'
R A
M P
GM
FH
T
SMH (SEWER MANHOLE)
WM (WATER METER)
IRS (IRON ROD SET)
IRF (IRON ROD FOUND)
IPF (IRON PIPE FOUND)
CMF (CONC MON FOUND)
IPS (IRON PIPE SET)
WV (WATER VALVE)
LP (PIGHT POLE)
PP (POWER POLE)
GM (GAS METER)
FH (FIRE HYDRANT)
TEL PED (TELEPHONE PEDESTAL)
GV (GAS VALVE)
TEL. MAN HOLE
MONITORING WELL
ELECTRIC CONTROL BOX
BOLLARD
ANTENNA
FORCE MAIN VALVE/VENT
LEGEND
TEL 757.873.1762
FAX 757.873.1772
M
M
NEWPORT NEWS, VA. 23602
41 OLD OYSTER POINT ROAD
MICHAEL SURVEYING
& MAPPING, P.C.
S
SUITE B
JANUARY 21, 2022
FOR RK&K
21-065
CHESAPEAKE, VIRGINIA
SECTION ONE
WINDY POINT
LOT 7
CRAWFORD BEING LOTS 5, 6, & 7 PLAT OF W.B. COX
PLAT SHOWING THE PEOPERTY OF LAWRENCE Y. & THELMA R.
TOPOGRAPHIC SURVEY OF
I:
\P r o j e c ts \9
\9
-1 -B a c k
R iv e r
D r a in a g e
Im p r o v \B
IM
-C
A D \9
-1 S h e e ts \d
-1 1b .d g n
WMP
SAK
DRAINAGE IMPROVEMENTS
BACK RIVER
2/28/2023
CAD
DEPARTMENT OF ENGINEERING
CITY OF POQUOSON
S. Crawford
DRAWN BY
APPROVED BY
DESIGNED BY
DATE
CITY PROJECT MANAGER
SHEET NO.
WOODEN
BRIDGE
PVC
FENCE
GARAGE
2-S-FRM
29.5
.2
30.3
.2
.3
13.7'
2.9'
5.8'
.1
7.5'
.5
1.2'
.8
1.2'
22.6'
.1
.1
8.7'
#9
2-S-FRM
W O
O D
P O
R C
H
ASPHALT DRIVE
PVC FENCE
WOOD FENCE
CHAIN
LINK F
ENCE
HEAVY BRUSH/
TREES
N °0
'3
W .0
N79°19 '21"E
192.
09'
N83°59'3 0"E
178.59'
S °0
'3
W
.1
9.31'(PLAT)
9.16'(FIELD)
S79° 29'3
0"W
356.
81'
.2
.1
.2
F E
N C
E
W O
8"W
.11'(
FIELD)
.07'
(PLAT)
N88°46'39"E
75.35'(FIELD)
75.15'(PLAT)
N °5
'2
E
.0
N °2
'2
W
.9
LTP
N °0
'3
W
.0
P L
A T
.7
T O
P
IP
E
C O
R N
E R
.3
O F F
P.B. 9, PG. 93
WINDY POINT
SECTION 2
LOT 8
LOT 7
24,803 S.F. (FIELD)
24,786 S.F. (PLAT)
TRANS.
INV.=-
1.34'
INV.=1.65'
INV.=0.40'
TOP=3.00'
SURVEY BENCHMARK
TOP OF DI
18"R
CP
12"RCP
MULCH
PG. 765
D.B. 403, ⅊
P.B. 6, PG. 112
⅊
P .B
P G
U T
IL
S E
M E
N T
D R
A
IN
A
D
D .B
P G
D R
A
IN
A
S E
M E
N T
C
P
O Q
U O
S
P.B. 6, PG. 112
BANNOCKBURN
LOT 19
0.820± AC.
P.B. 8, PG. 477
WINDY POINT
SECTION 1
LOT 6
P.B. 8, PG. 477
WINDY POINT
SECTION 1
LOT 50
TROTTWOOD DRIVE
50' R/W
R O
A D
R O
B E
U
R
W
ID
W
IL
L
IA
M S ,J
U X
E A
N
F
P
ID
M A
C D
O N
A
U X
J E F F
E R
S
N
F
P
ID
M A
N C
U X
N
F
P
ID
H E
A T
H
H
R R
E
J
S
F
O F F
.0
.1
O N
.9
O N
O F F
.0
.9
O N
.8
O N
PID #28-01-00-0095
ETALS
PEGGY C. LINTHICUM,
N/F
E
.3
T O
P
C
BULKHEAD
DILAPIDATED
BULKHEAD
DILAPIDATED
3 3
D
IL
A P
ID
A T
L K
H E
A D
DILAPIDATED
BOATHOUSE
C A
N A
L
DILAPIDATED
PIER
CB=S12°13'55"W
C=59.80'
T=32.99' Δ=50°0
L=61.74'
R=70.71'
R A
M P
SCALE
25' 50'
1B
EROSION AND SEDIMENT CONTROL PLAN
TC-P
CE
DENOTES TEMPORARY SILT FENCE TYPE A , ST'D EC-5TSF-A
CE
TSF-A
TSF-A
TC-P
EROSION AND SEDIMENT CONTROL LEGEND
FOR SITE ACCESS
UTILIZE WOODEN MATS
DENOTES TURBIDITY CURTAIN, TYPE - PERVIOUS
DENOTES CONSTRUCTION ENTRANCE
WOODEN
BRIDGE
PVC
FENCE
GARAGE
2-S-FRM
29.5
.2
30.3
.2
PVC FENCE
WOOD FENCE
CHAIN
LINK F
ENCE
HEAVY BRUSH/ TREES
192.
09'
N83°59'3 0"E
178.59'
S °0
'3
W .1
9.31'(PLAT)
9.16'(FIELD)
356.
81'
.2
F E
N C
E
W O
8"W
LTP
P.B. 9, PG. 93
WINDY POINT
SECTION 2
LOT 8
TRANS.
INV.=-
1.34'
MULCH
PG. 765
D.B. 403, ⅊
P.B. 6, PG. 112
⅊
0.820± AC.
.1
O N
.9
O N
.8
O N
BULKHEAD
DILAPIDATED
BULKHEAD
DILAPIDATED
3 3
D
IL
A P
ID
A T
L K
H E
A
D DILAPIDATED
BOATHOUSE
C A
N A
L
DILAPIDATED
PIER
IPF
IPF
.9
O N
AGGREGATE
CRUSHER RUN
#25/26
CLASS 1 RIPRAP
26" DEEP
BEDDING
GEOTEXTILE
4' MIN'
2'-2" MIN'
3:1
I:
\P r o j e c ts \9
\9
-1 -B a c k
R iv e r
D r a in a g e
Im p r o v \B
IM
-C
A D \9
-1 S h e e ts \d
-1 .d g n
WMP
SAK
DRAINAGE IMPROVEMENTS
BACK RIVER
2/28/2023
CAD
DEPARTMENT OF ENGINEERING
CITY OF POQUOSON
S. Crawford
DRAWN BY
APPROVED BY
DESIGNED BY
DATE
CITY PROJECT MANAGER
SHEET NO.
NOT TO SCALE
CROSS SECTION OF RIPRAP
BOATHOUSE
REMOVE
L O
N G
IT
U D
IN
A L
S
L O
P E
IN
T A
IN
.2
R
IP
R
O S
C T
IO
N
PROJECT PLAN
0 10' 20'
SCALE
REQUIRED
NOTE: EMBEDMENT EXCAVATION
DEMOLITION LEGEND
Denotes Demolition of Boathouse
REPLACEMENT
FOR RIPRAP
*SEE DETAIL
BULKHEAD
REMOVE
FENCE (White PVC) *
BEGIN REMOVAL OF
FENCE (White PVC) *
END REMOVAL OF
CONSTRUCTION NOTES
1.
WHERE BULKHEAD IS BEING REMOVED
TIE-IN POINT OF PROPOSED RIP RAP TO
8'
A s
R e q d
5'
BULKHEAD
PROP. TIMBER
PIPE: M36
MATERIAL: M274
ALUMINUM TYPE 2
MIN COVER=12"
3" X 1" CORREGATIONS
PIPE ARCH 137" x 87"
CORRUGATED METAL
12 LF
Removal and Reinstallation is not in contract and will be "by others".
and stored for reinstallation after construction is complete.
White PVC fence will be removed for construction activities
3A
DWP
WEC
BULKHEAD DETAILS
I:
\P r o j e c ts \9
\9
-1 -B a c k
R iv e r
D r a in a g e
Im p r o v \B
IM
-C
A D \9
-1 S h e e ts \d
-1
A .d g n
WMP
DRAINAGE IMPROVEMENTS
BACK RIVER
2/28/2023
DEPARTMENT OF ENGINEERING
CITY OF POQUOSON
S. Crawford
DRAWN BY
APPROVED BY
DESIGNED BY
DATE
CITY PROJECT MANAGER
SHEET NO.
3B
DWP
WEC
BULKHEAD NOTES
I:
\P r o j e c ts \9
\9
-1 -B a c k
R iv e r
D r a in a g e
Im p r o v \B
IM
-C
A D \9
-1 S h e e ts \d
-1
B .d g n
WMP
DRAINAGE IMPROVEMENTS
BACK RIVER
2/28/2023
DEPARTMENT OF ENGINEERING
CITY OF POQUOSON
S. Crawford
DRAWN BY
APPROVED BY
DESIGNED BY
DATE
CITY PROJECT MANAGER
SHEET NO.
| d9704-1_01 |
| d9704-1_01A |
| d9704-1_01b |
| d9704-1_03 |
| d9704-1_03A |
| d9704-1_03B |
File details come from the government source that posted it. Updated .