BAA-10-RD-01-CALL 0008 Attach 6 Subcontracting Plan Checklist.doc

DOC document 89 KB Posted

Attached to
SUPER Novel Optically diVerse Applications (SUPERNOVA) Federal contract opportunity
Solicitation number
BAA-10-RD-01
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Individual Subcontracting Plan Checklist and Review

View the file

Other files for this federal contract opportunity

Other files attached to SUPER Novel Optically diVerse Applications (SUPERNOVA), newest first.
File Type Posted
CALL_0011_ORCA_Q A_3.pdf PDF
CALL_0012_Questions_ _Answers_(3).docx DOCX document
Call_Announcement_(Thermal_SSA)_20_Feb_15_(Rev_2).pdf PDF
CALL_0012_Questions_ _Answers.docx DOCX document
Attach_8_Associate_Contractor_Agreements.docx DOCX document
Attach_1c_TO2_SOO.docx DOCX document
Attach_4_Represenstations_and_Certifications.docx DOCX document
Attachment_1_-_Thermal_SSA_SOO.pdf PDF
Attachment_3_-_DD_254_DRAFT_Thermal_SSA__13FEB2015.pdf PDF
Attachment_2_-_Thermal_SSA_CDRLS.pdf PDF
Cost_Proposal_Instructions_APC_BAAs-SBIRs(Apr_13).docx DOCX document
BAA_Reps_and_Certs.docx DOCX document
BAA_Proposal_Content_Checklist.doc DOC document
SUPERNOVA_CDRLS_JAN_09_2015_V2.doc DOC document
Atch_No. 2.doc DOC document
Atach_5.pdf PDF
BAA-10-RD-01-CALL 0008 Attach 1 Cost Prop Inst - FAR-AFPAC 2 Nov 10.docx DOCX document
BAA-10-RD-01-CALL 0008 Attach 5 Form DD254.pdf PDF
BAA-10-RD-01-CALL 0007 BAA Solicitation Final posted 25 Jan 2012.pdf PDF
BAA-10-RD-01-CALL 0007 Attach 2 Proposal Content Checklist.doc DOC document
BAA-10-RD-01-CALL 0007 Attach 3 BAA Reps and Certs.docx DOCX document
BAA-10-RD-01-CALL 0007 Attach 5 GFP Scanned w ltr.pdf PDF
BAA-10-RD-01-CALL 0007 Attach 6 DD 254 dtd DEC072011a.pdf PDF
UpdatedCDRL Package SUPERNOVA CALL.doc DOC document
Attachment No. 5.doc DOC document
Attachment No. 2.docx DOCX document
AttachmentNo. 1.doc DOC document
Attachment No. 4.doc DOC document
CALL0006.doc DOC document
Atch_5.pdf PDF
Atch_6.pdf PDF
Atch_4.pdf PDF
Atch_3.pdf PDF
attch_2.pdf PDF
attch_6.xlsx XLSX spreadsheet
attch_3.pdf PDF
Attachment 4_CDRLs Exhibit A.pdf PDF
Attachment 1_Cost Proposal Instruction - FAR Contracts.doc DOC document
SUPERNOVA CALL 0003 TOPIC AREA 2 Advanced Sensors and Laser Intelligence.docx DOCX document
Attachment 2_BAA Reps and Certs —
call_2.pdf PDF
atch_2-Cost Proposal Instructions.pdf PDF
atch_4-CDRLs.pdf PDF
atch_2-Cost Proposal Instructions.pdf PDF
atch_3- Reps and Certs.pdf PDF
atch_4-CDRLs.pdf PDF
SUPERNOVA CALL TOPIC NEW REVISED 6-7-2010.doc DOC document
atch_1-Proposal Content Checklist.pdf PDF
BAASuperNovachanges.doc DOC document
atch_4.pdf PDF
Show all 50

SUPER Novel Optically diVerse Applications (SUPERNOVA) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Individual Subcontracting Plan Checklist and Review

Solicitation/Contract Number: BAA-10-RD-01 Call 0008

Date:

Contractor:

Buyer/PCO:

Office Symbol & Phone:

· If the contractor is participating in the Comprehensive Subcontracting Plan Test Program, individual plans are NOT required.

· The cumulative value of the basic contract and options is used to determine whether a subcontracting plan is required.

· Options require separate goals. See FAR 52.219-9(c) and 19.704(c).

· If there is a Master Subcontracting Plan in effect for this contractor, items 4 through 11 below do not apply. Note: Master plans are effective for three years after approval by the contracting officer, but contractors must maintain and update the plans as necessary. Changes must be approved by the contracting officer. See FAR 19.704(b).

· Is this a commercial plan? Yes No See Far 19.704(d).

The PCO/buyer will review the subcontracting plan and coordinate as required with the contractor and the cognizant contract administration office. After review, the PCO/buyer will complete/sign the checklist and provide the original checklist and a copy of the subcontracting plan to the local Air Force Small Business Office (SB). The SB will review the plan and obtain advice and recommendation from the SBA Procurement Center Representative (PCR). After review and coordination, the SB will notify the PCO/buyer of the results of the review before the start of negotiations.

Y=acceptable; U=not acceptable; N=not included; NI=needs improvement; N/A=does not apply

Does Plan Include:
PCO
SB
SBA
Reference

1.

Total Subcontracting Dollars:

(Insert proposed goals)

$
% Sub

Contract $ % Total Contract $

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to SB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to SDB

(includes 8a)

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to WOSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

$ to Service Disabled VOSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to Veteran OSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to HUBZone SB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

For current DOD goals, see http://www.acq.osd.mil/osbp/statistics/goals.htm

2.

Goals listed as a Percentage of Total subcontract value.

Goals listed as a Percentage of Total contract value.

-----
-----
-----
FAR 52.219-9(d)(1), 19.704(a)(1), 19.705

AFFARS 5319.704(a)(1)

3.

A description of the principal supplies/services to be subcontracted with sufficient detail to evaluate whether or not SB can do the work.

(Include large business, nonprofit, and not-for-profit work.)

FAR 52.219-9(d)(3), 19.704(a)(3), 19.705

4.

A description of the method used to develop goals.

FAR 52.219-9(d)(4), 19.704(a)(4), 19.705

5.

A description of the method used to locate potential suppliers.

FAR 52.219-9(d)(5), 19.704(a)(5), 19.705

6.

Do the goals include indirect costs?

FAR 52.219-9(d)(6), 19.704(a)(6), 19.705

If indirect costs are included in the goals, does the plan include a description of the cost allocation method?

FAR 52.219-9(d)(6), 19.704(a)(6), 19.705

7.

Name and duties of contractor’s subcontracting plan administrator.

FAR 52.219-9(d)(7), 19.704(a)(7), 19.705

8.

Description of the efforts the offeror will make to assure that SBs have an equitable opportunity to compete for subcontracts.

FAR 52.219-9(d)(8), 19.704(a)(8), 19.705

9.

Flow Down assurances.

FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

Appropriate subcontract clauses will be used.

FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

Subcontractors will be required to submit a similar plan.

FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

Does Plan Include:
PCO
SB
SBA
Reference

10.

Assurance prime contractor will submit required reports and cooperate in studies and surveys.

FAR 52.219-9(d)(10), 19.704(a)(10), 19.705

11. Recitation of types of records maintained to show compliance with plan.

FAR 52.219-9(d)(11), 19.704(a)(11), 19.705

12. If the SDB goal for the basic contract is less than 5%, is approval one level above contracting officer attached?

DFARS 219.705-4

13. For modifications, is approval attached if the SDB goal is less than 5%? (If SDB goal was below 5% for the basic contract and the reasons have not changed, a new approval is not required)

DFARS 219.705-4

14. Has information and coordination from the ACO been obtained?

FAR 19.706, DFARS 219.706(a)(i)

Central Contractor Registration (CCR): To enhance small business outreach, the contractor should be encouraged to use the SBA Dynamic Small Business Search tool at the CCR web site: http://www.ccr.gov/.

Buyer/PCO Comments:

Buyer/PCO Signature and Date:

SB Comments:

Air Force Small Business Office Signature and Date:

SBA PCR Comments:

If box is checked, SBA does not have a copy of the current Master Subcontracting Plan on File. Please provide one.

SBA Procurement Center Representative Signature and Date:

SBA will internally report this subcontracting plan, as submitted, as acceptable not acceptable modified on _____________ to be acceptable before award.

SBA may contact the PCO/buyer regarding status of the subcontracting plan at time of award.

Please remember the post-award responsibilities of the Contracting Officer, which are listed in FAR 19.705-6.

The Procurement Center Representative can provide the addresses of the appropriate Area Directors.

(Ver. 7/31/2008) BAA-10-RD-01 Call 0008 – Attach 6

File details come from the government source that posted it. Updated .