Attachment No. 5.doc
DOC document 81 KB Posted
- Attached to
- SUPER Novel Optically diVerse Applications (SUPERNOVA) Federal contract opportunity
- Solicitation number
- BAA-10-RD-01
About this file
Individual Subcontracting Plan Checklist and Review - Attachment No. 5
View the file
Other files for this federal contract opportunity
Show all 50
SUPER Novel Optically diVerse Applications (SUPERNOVA) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Individual Subcontracting Plan Checklist and Review
Solicitation/Contract Number:
Date:
Contractor:
Buyer/PCO:
Office Symbol & Phone:
· If the contractor is participating in the Comprehensive Subcontracting Plan Test Program, individual plans are NOT required.
· The cumulative value of the basic contract and options is used to determine whether a subcontracting plan is required.
· Options require separate goals. See FAR 52.219-9(c) and 19.704(c).
· If there is a Master Subcontracting Plan in effect for this contractor, items 4 through 11 below do not apply. Note: Master plans are effective for three years after approval by the contracting officer, but contractors must maintain and update the plans as necessary. Changes must be approved by the contracting officer. See FAR 19.704(b).
· Is this a commercial plan? Yes No See Far 19.704(d).
The PCO/buyer will review the subcontracting plan and coordinate as required with the contractor and the cognizant contract administration office. After review, the PCO/buyer will complete/sign the checklist and provide the original checklist and a copy of the subcontracting plan to the local Air Force Small Business Office (SB). The SB will review the plan and obtain advice and recommendation from the SBA Procurement Center Representative (PCR). After review and coordination, the SB will notify the PCO/buyer of the results of the review before the start of negotiations.
Y=acceptable; U=not acceptable; N=not included; NI=needs improvement; N/A=does not apply
| Does Plan Include: |
| PCO |
| SB |
| SBA |
| Reference |
1.
Total Subcontracting Dollars:
(Insert proposed goals)
| $ |
| % Sub |
Contract $ % Total Contract $
FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
Total $ to SB
FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
Total $ to SDB
(includes 8a)
FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
Total $ to WOSB
FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
$ to Service Disabled VOSB
FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
Total $ to Veteran OSB
FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
Total $ to HUBZone SB
FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
For current DOD goals, see http://www.acq.osd.mil/osbp/statistics/goals.htm
2.
Goals listed as a Percentage of Total subcontract value.
Goals listed as a Percentage of Total contract value.
| ----- |
| ----- |
| ----- |
| FAR 52.219-9(d)(1), 19.704(a)(1), 19.705 |
AFFARS 5319.704(a)(1)
3.
A description of the principal supplies/services to be subcontracted with sufficient detail to evaluate whether or not SB can do the work.
(Include large business, nonprofit, and not-for-profit work.)
FAR 52.219-9(d)(3), 19.704(a)(3), 19.705
4.
A description of the method used to develop goals.
FAR 52.219-9(d)(4), 19.704(a)(4), 19.705
5.
A description of the method used to locate potential suppliers.
FAR 52.219-9(d)(5), 19.704(a)(5), 19.705
6.
Do the goals include indirect costs?
FAR 52.219-9(d)(6), 19.704(a)(6), 19.705
If indirect costs are included in the goals, does the plan include a description of the cost allocation method?
FAR 52.219-9(d)(6), 19.704(a)(6), 19.705
7.
Name and duties of contractor’s subcontracting plan administrator.
FAR 52.219-9(d)(7), 19.704(a)(7), 19.705
8.
Description of the efforts the offeror will make to assure that SBs have an equitable opportunity to compete for subcontracts.
FAR 52.219-9(d)(8), 19.704(a)(8), 19.705
9.
Flow Down assurances.
FAR 52.219-9(d)(9), 19.704(a)(9), 19.705
Appropriate subcontract clauses will be used.
FAR 52.219-9(d)(9), 19.704(a)(9), 19.705
Subcontractors will be required to submit a similar plan.
FAR 52.219-9(d)(9), 19.704(a)(9), 19.705
| Does Plan Include: |
| PCO |
| SB |
| SBA |
| Reference |
10.
Assurance prime contractor will submit required reports and cooperate in studies and surveys.
Y
FAR 52.219-9(d)(10), 19.704(a)(10), 19.705
11. Recitation of types of records maintained to show compliance with plan.
Y
FAR 52.219-9(d)(11), 19.704(a)(11), 19.705
12. If the SDB goal for the basic contract is less than 5%, is approval one level above contracting officer attached?
Y
DFARS 219.705-4
13. For modifications, is approval attached if the SDB goal is less than 5%? (If SDB goal was below 5% for the basic contract and the reasons have not changed, a new approval is not required) N
DFARS 219.705-4
14. Has information and coordination from the ACO been obtained?
N
FAR 19.706, DFARS 219.706(a)(i)
Central Contractor Registration (CCR): To enhance small business outreach, the contractor should be encouraged to use the SBA Dynamic Small Business Search tool at the CCR web site: http://www.ccr.gov/.
Buyer/PCO Comments: See PFS Subcontract Plan Attachment 1. It has been determined by the PCO that subcontracting goals are reasonable. The PCO approves the subject Subcontract Plan and after award of contract FA9451-10-C-0204, will forward the plan to the cognizant ACO and the SBA area office where to contract will be performed.
Buyer/PCO Signature and Date:
SB Comments:
Air Force Small Business Office Signature and Date:
SBA PCR Comments:
If box is checked, SBA does not have a copy of the current Master Subcontracting Plan on File. Please provide one.
SBA Procurement Center Representative Signature and Date:
SBA will internally report this subcontracting plan, as submitted, as acceptable not acceptable modified on _____________ to be acceptable before award.
SBA may contact the PCO/buyer regarding status of the subcontracting plan at time of award.
Please remember the post-award responsibilities of the Contracting Officer, which are listed in FAR 19.705-6.
The Procurement Center Representative can provide the addresses of the appropriate Area Directors.
(Ver. 7/31/2008)
Attachment No. 5
File details come from the government source that posted it. Updated .