Attachment No. 4.doc

DOC document 181 KB Posted

Attached to
SUPER Novel Optically diVerse Applications (SUPERNOVA) Federal contract opportunity
Solicitation number
BAA-10-RD-01
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Contract Data Requirements List (CDRLs) - Attachment No. 4

View the file

Other files for this federal contract opportunity

Other files attached to SUPER Novel Optically diVerse Applications (SUPERNOVA), newest first.
File Type Posted
CALL_0012_Questions_ _Answers_(2).docx DOCX document
Call_Announcement_(Thermal_SSA)_20_Feb_15_(Rev_2).pdf PDF
CALL_0011_ORCA_Q A_1.pdf PDF
Attach_1a_BASIC_SOO.docx DOCX document
Attach_7_Government_Furnished_Property_Listing.xls XLS spreadsheet
Attach_1b_TO1_SOO.docx DOCX document
Attach_1d_TO3_SOO.docx DOCX document
Attach_8_Associate_Contractor_Agreements.docx DOCX document
Attach_1c_TO2_SOO.docx DOCX document
Attachment_4_-_Cost_Proposal_Instructions_NON-APC.pdf PDF
Attachment_1_-_Thermal_SSA_SOO.pdf PDF
Attach_5_BAA_Proposal_Content_Checklist.doc DOC document
Attach_1_SOO_CASE.docx DOCX document
Attach_2_CDRLS_JAN_08_2015_V3.doc DOC document
Attachment_6_-_Represenstations_and_Certifications.docx DOCX document
Attach_3_DD_Form_254.pdf PDF
BAA_CALL_0010_11_March_2015.pdf PDF
Cost_Proposal_Instructions_(Non-APC)_Jun_2014.docx DOCX document
STAB-C Amend01.docx DOCX document
Atch_No. 1.docx DOCX document
BAA-10-RD-01-CALL 0008 CALL0008_SSA_SAR_BAA Final - 4.5.12.docx DOCX document
BAA-10-RD-01-CALL 0008 Attach 4 CDRLs A001-A005.doc DOC document
BAA-10-RD-01-CALL 0008 Attach 1 Cost Prop Inst - FAR-AFPAC 2 Nov 10.docx DOCX document
BAA-10-RD-01-CALL 0007 Attach 4 CDRLs.pdf PDF
BAA-10-RD-01-CALL 0007 BAA Solicitation Final posted 25 Jan 2012.pdf PDF
BAA-10-RD-01-CALL 0007 Attach 2 Proposal Content Checklist.doc DOC document
CDRL Package SUPERNOVA CALL.doc DOC document
Attachment No. 3.docx DOCX document
Attachment No. 5.doc DOC document
CPI - FAR-AFPAC 2 Nov 10.docx DOCX document
Atch_3.docx DOCX document
Atch_1.doc DOC document
CALL0006.doc DOC document
SUPERNOVACALL5.doc DOC document
Atch_6.pdf PDF
Atch_4.pdf PDF
attch_2.pdf PDF
attch_6.xlsx XLSX spreadsheet
Attachment 3_Proposal Content Checklist.doc DOC document
Attachment 4_CDRLs Exhibit A.pdf PDF
atch_1-Proposal Content Checklist.pdf PDF
call_2.pdf PDF
atch_2-Cost Proposal Instructions.pdf PDF
call_2.pdf PDF
atch_4-CDRLs.pdf PDF
atch_4-CDRLs.pdf PDF
SUPERNOVA CALL TOPIC NEW REVISED 6-7-2010.doc DOC document
atch_2.pdf PDF
BAASuperNovachanges.doc DOC document
atch_4.pdf PDF
Show all 50

SUPER Novel Optically diVerse Applications (SUPERNOVA) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (Data Item) Form Approval OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commends regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that, notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0002
D. SYSTEM/ITEM

SUPERNOVA

B. EXHIBIT

A
E. CONTRACT/PR NO.

TBD

C. CATEGORY

OTHER
F. CONTRACTOR

TBD

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Technical Report

3. SUBTITLE

Program Plan

4. AUTHORITY

DI-MISC-80508B

5. CONTRACT REFERENCE

6. REQUIRING OFFICE

AFRL/RDS
9. DIST. STATEMENT REQUIRED
C (See Block 16)
12. DATE OF FIRST SUBMISSION:
(See Block 16)

7. DD 250 REQ

LT
10. FREQUENCY
(See Block 16)
13. DATE OF SUBSEQUENT SUBM.:
(See Block 16)

8. APP CODE

A
11. AS OF DATE

(See Block 16)

14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT
FINAL
AFRL RDS
1
1
ACO
Lt
Lt
PCO
Lt
Lt
15. TOTAL:
1
1

16. REMARKS

BLK 4: Contractor format acceptable. The most current version of the Data Item Description is to be used. Final program plans shall be marked with the appropriate distribution statement and any restrictive legends that apply to include Draft program plans.

Include all Government Furnished Equipment and Facilities required and the date and duration they will be required. Include a cost chart depicting by month the estimated cost, including subcontractor costs, for each major task.

BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors only; Critical Technology; July 2010. Other requests for this document shall be referred to the Air Force Research Lab RDS, 3550 Aberdeen Dr. SE, Kirtland AFB, NM 87113.

EXPORT CONTROL WARNING: All technical data must be marked as follows: “WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50,U.S.C. App 2401 et seq. violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Final program plans shall be marked with the appropriate distribution statement and any restrictive legends that apply. If restrictive legends are not evident, the data may be treated as unrestricted

BLKS 10, 12, 13: The contractor shall deliver a draft Program Plan within 30 calendar days after award. Upon receipt of the comments, the contractor shall take no more than 15 days to incorporate all required changes and deliver the final version of the Program Plan. The plan shall be updated, as required and approved by Program Manager from the date of initial acceptance through technical completion.

BLK 14: An electronic copy of the program plan shall be delivered. One CD-ROM (CD-R), properly labeled, is an acceptable media for submittal. The most current version of MS Word shall be used. E-Mail transmittal is not permitted unless encrypted or secure.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY:
Michael Mendoza
I. APPROVED BY:
Scott Brown
H. DATE:
06/03/2011
J. DATE:
06/03/2011

DD Form 1423-1, SEP 97 (EG) (Computer Generated)

PREVIOUS EDITIONS ARE OBSOLETE

Page 1 of 1 Pages CONTRACT DATA REQUIREMENTS LIST (Data Item) Form Approval OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commends regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that, notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

D. CONTRACT LINE ITEM NO.

0002
D. SYSTEM/ITEM

SUPERNOVA

E. EXHIBIT

A
E. CONTRACT/PR NO.

TBD

F. CATEGORY

OTHER
F. CONTRACTOR

TBD

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Presentation Material

3. SUBTITLE

4. AUTHORITY

DI-ADMN-81373

5. CONTRACT REFERENCE

6. REQUIRING OFFICE

AFRL/RDS
9. DIST. STATEMENT REQUIRED
C (See Block 16)
12. DATE OF FIRST SUBMISSION:
(See Block 16)

7. DD 250 REQ

LT
10. FREQUENCY
(See Block 16)
13. DATE OF SUBSEQUENT SUBM.:
(See Block 16)

8. APP CODE

N/A
11. AS OF DATE

(See Block 16)

14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT
FINAL

AFRL RDS

ACO

Lt

PCO

Lt

15. TOTAL:

16. REMARKS

BLK 4: Contractor format, upon approval of RDS Program Manager, acceptable. The most current version of the Data Item Description is to be used.

BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors only; Critical Technology; July 2010. Other requests for this document shall be referred to the Air Force Research Lab RDS, 3550 Aberdeen Dr. SE, Kirtland AFB, NM 87113.

EXPORT CONTROL WARNING: All technical data must be marked as follows: “WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App 2401 et seq. violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Presentation material shall be marked with the appropriate distribution statement and any restrictive legends that apply. If restrictive legends are not evident, the data may be treated as unrestricted

BLKS 10, 12, 13: Quarterly Technical Interchange meetings held at AFRL RDS to review technical and cost performance. Copies of presentation material will be provided after the meeting.

BLK 14: An electronic copy of the presentation shall be delivered. One CD-ROM (CD-R), properly labeled, is an acceptable media for submittal. The most current version of MS Word or PowerPoint shall be used. Submission via unencrypted or unsecure email is not permitted.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY:
Michael Mendoza
I. APPROVED BY:
Scott Brown
H. DATE:
06/03/2011
J. DATE:
06/03/2011

Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST (Data Item) Form Approval OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send commends regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that, notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

G. CONTRACT LINE ITEM NO.

0002
D. SYSTEM/ITEM

SUPERNOVA

H. EXHIBIT

A
E. CONTRACT/PR NO.

TBD

I. CATEGORY

OTHER
F. CONTRACTOR

TBD

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

4. AUTHORITY

DI-MGMT-80368A/T (Tailored)

5. CONTRACT REFERENCE

6. REQUIRING OFFICE

AFRL/RDS
9. DIST. STATEMENT REQUIRED
C (See Block 16)
12. DATE OF FIRST SUBMISSION:
(See Block 16)

7. DD 250 REQ

LT
10. FREQUENCY
(See Block 16)
13. DATE OF SUBSEQUENT SUBM.:
(See Block 16)

8. APP CODE

N/A
11. AS OF DATE

(See Block 16)

14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT
FINAL

AFRL/ RDS

AFO

Lt

PCO

Lt

AFRL/RDKL

15. TOTAL:

16. REMARKS

BLK 4: Contractor format, upon approval of RDS Program Manager, acceptable. The most current version of the Data Item Description is to be used.

BLK 9: DISTRIBUTION STATEMENT C: Distribution authorized to US Government agencies and their contractors only; Critical Technology; July 2010. Other requests for this document shall be referred to the Air Force Research Lab/RDS 3550 Aberdeen Dr. SE, Kirtland AFB NM, NM 87113.

EXPORT CONTROL WARNING: All technical data must be marked as follows: “WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50,U.S.C. App 2401 et seq. violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”

Reports shall be marked with the appropriate distribution statement and any restrictive legends that apply. If restrictive legends are not evident, the data may be treated as unrestricted

BLK 10: As set forth on individual awards or quarterly.

BLK 12, 13: As designated by the RDS Program Manager, provide monthly status reports (to include technical and cost /financial execution data by AFRL/RDS approved format) NLT fifteen (15) calendar days following the close of the contractor’s monthly accounting period through completion of the award technical period of performance. The first report is due after the first full month of performance of each award.

As designated by the RDS Program Manager, provide quarterly status reports NLT fifteen (15) calendar days following the end of each quarter through completion of the award technical period of performance. The first report is due after the first full quarter of performance of each award.

BLK 14: An electronic copy of the report shall be delivered to RDS and the COR. One CD-ROM (CD-R), properly labeled, is an acceptable media for submittal. One paper copy of the report shall be delivered to AFRL/RDKL. The most current version of MS Word shall be used.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

G. PREPARED BY:
Michael Mendoza
I. APPROVED BY:
Scott Brown
H. DATE:
06/03/2011
J. DATE:
06/03/2011

Page 1 of 1 Pages J. CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.:

B. EXHIBIT....................................: A

C. CATEGORY..............................: OTHER

D. SYSTEM/ITEM........: SUPERNOVA

E. CONTRACT/PR NO. TBD

F. CONTRACTOR.........: TBD

1. DATA ITEM NO........................:
A004
2. TITLE OF DATA ITEM............:
Scientific and Technical Report and Checklist
3. SUBTITLE..................................:
Final Report
4. AUTHORITY.............................:
DI-MISC-80711A

5. CONTRACT REFERENCE......:

6. REQUIRING OFFICE..............: AFRL/RDS

7. DD250 REQ................................:

DD

8. APP CODE.................................:

A

9. DIST. STATEMENT REQUIRED......:

See Block 16

10. FREQUENCY......................................:

See Block 16

11. AS OF DATE........................................:

See block 16

12. DATE OF FIRST SUBMISSION: See Block 16

13. DATE OF SUBSEQUENT SUBM.: See Block 16

14. DISTRIBUTION

A. ADDRESSEES
B. COPIES
FINAL
CRC
AFRL/RDO
1
aco
Lt
Lt
ALRL/RDK PCO
Lt
Lt
AFRL/RDS PM
1
1
15. TOTAL:
2
1

16. REMARKS

THE REPORT WILL BE PUBLISHED WITH THE DEFENSE TECHNICAL INFORMATION CENTER (DTIC) BY AFRL STINFO OFFICE. Under no circumstances shall the contractor submit either the final report or the camera-ready technical report to DTIC.

Blk 4: GUIDANCE FOR PREPARATION OF THE REPORT: The Scientific and Technical Report shall be prepared I.A.W. AFRL ANSI-Based Format Guidelines located at:

http://www.kirtland.af.mil/shared/media/document/AFD-100907-025.doc. If the Final Report contains data that is being delivered with less-than-unlimited rights, the data with less-than-unlimited rights shall be delivered as a separate, appropriately-marked Volume* to the Final Report. Incomplete final reports will be immediately returned to the contractor.

The contractor shall complete and submit an SF 298 Report Documentation Page, with the final report. The SF 298 is available at: http://www.kirtland.af.mil/shared/media/document/AFD-070425-037.doc. The contractor shall complete the following blocks of the SF298: Blocks 2-5a, 6, 7, 8 and 13 (if applicable), 14-16c.

The contractor shall complete and sign the AFRL Form 25, AFRL Quality Final Technical Report Checklist, and submit it with the final report. The checklist is available at: http://www.kirtland.af.mil/shared/media/document/AFD-101029-017.pdf. If the completed and signed AFRL Form 25 does not accompany the final report, the deliverable is considered incomplete. Following AFRL technical and STINFO reviews, any revisions required will be returned to the contractor.

The contractor shall deliver editable electronic copies of the final report. The electronic copies shall be an editable .pdf file and the most current version of Microsoft Word. A CD-ROM (CD-R) is the acceptable media for submittal. (CD-RWs are not acceptable.) Electronic media shall be marked IAW the AFRL ANSI-Based Format Guidelines. Submission via unencrypted or unsecure email is not permitted.

Blk 7: Submit Final Report with letter of transmittal and the DD 250 to the designated project manager. In preparing the final DD 250 for the contract, code the shipment number with a “Z”.

Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement (C): Distribution authorized to US Government agencies and their contractors only; Critial Technology; July 2010. Other requests for this document shall be referred to Air Force Research Laboratory/RDS, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.

*Any Volume containing less-than-unlimited rights material (including electronic media) shall be marked I.A.W. DoDD 5230.24 with a Distribution Statement – to be determined for that specific volume submission and overall award.

EXPORT CONTROL WARNING: All technical data (including electronic media) shall be marked as follows:

“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Action of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.”

All technical data (including electronic media) shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”

Blks 10 - 13: The contractor shall deliver the Scientific and Technical Report, in final format, no later than the date specified in the Schedule, CLIN 0002. The USAF will review and, if necessary, return the final report with comments no later than the date specified in the Schedule, CLIN 0002. If the report is returned to the contractor with comments, the contractor shall deliver the camera-ready copy of the report no later than the date specified in the Schedule, CLIN 0002.

NOTE: Headings in Block 14B, Copies, have been changed. “Draft” is changed to “Final” and “Final” (in second column) is changed to “CRC” (camera-ready copy).

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE :

G. PREPARED BY:
Michael Mendoza
I. APPROVED BY: Scott Brown
H. DATE:
06/03/2011
J. DATE: 06/03/2011

Page _ of _ Pages

EXHIBIT A

EXHIBIT A

File details come from the government source that posted it. Updated .