BAA - DSBD and Diving Equipment Encl 1 - Pre-proposal Format.docx
DOCX document 25 KB Posted
- Solicitation number
- N0002425R4305
About this file
This document is a Broad Agency Announcement (BAA) issued by the Naval Sea Systems Command (NAVSEA) soliciting pre-proposals and full proposals for applied Biomedical Research and Diving Equipment Development. The program's goals are to focus research on improving or developing diving equipment for rapid transition to fleet capabilities, and biomedical aspects of Diver Health, Safety, and Performance, Deep Diving, and Submarine Escape and Rescue. Key technical focus areas include breathing gas supply, human performance, environmental protection, decompression, and tools/transportation/training for diving, as well as atmosphere assessment, oxygen toxicity mitigation, and thermal stress mitigation for submarine escape and rescue. Pre-proposals are due November 30, 2024 and November 30, 2025 for work starting in FY26 and FY27 respectively, with full proposal invitations to follow. Contracts are expected to be two years or less, averaging around $300K per year. No set-asides are provided for Historically Black Colleges/Universities or Minority Institutions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BAA - DSBD and Diving Equipment Encl 2 - Full Proposal Format.docx | DOCX document | |
| BAA Diving and Sub Esc Resc - Att 1 - Full Proposal Non-Government Itemized Cost.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREPROPOSAL
TITLE
PREPROPOSAL TEMPLATE
1. DATE:
2. TITLE:
3. PRINCIPAL INVESTIGATOR (Co-Principal Investigator and/or Associate Investigator):
POSITION TITLE (if any):
DEGREE(S):
4. MAILING ADDRESS: (provide the mailing address of the principal investigator including laboratory, department and subdivision designations)
| 5. PHONE NUMBER (commercial): | (DSN): | |
| FAX NUMBER (commercial): | (DSN): |
E-MAIL ADDRESS:
6. RESOURCES:
a. ROM, estimated costs associated with project for each fiscal year and total ($K):
| BUDGET ITEM Fiscal Year: Oct 1 – Sept 30 (eg. FY24 starts 1 Oct 2023) |
| 1st Yr ($K) |
| 2nd Yr ($K) |
| 3rd Yr ($K) |
TOTAL
| (FY 20XX) |
| (FY 20XX) |
| (FY 20XX) |
In-House Personnel (direct labor)
Equipment and Maintenance
Expendable Supplies
Animal Purchase and Per Diem
Travel
Miscellaneous
Subcontractors/Consultants
TOTAL DIRECT COST:
TOTAL OVERHEAD COST:
GRAND TOTAL COST:
b. Personnel required for each fiscal year (professional and supporting, military and civilian). Indicate percent effort for each person.
c. Major equipment required for each fiscal year (indicate whether it is available or will be purchased, the expected year of purchase, and the projected cost).
d. Travel required for each fiscal year: provide the estimated number of people, estimated number of days, estimated number of trips, and the purpose for each trip.
7. NAVY NEED:
a. State the Navy need or deficiency.
b. Explain how the pre-proposal addresses the need.
c. List any official requirements documents that support the need including the specific element(s) in the BAA. (Documents should be current.)
8. SPECIFIC AIMS:
a. Describe the research hypothesis to be tested or the item to be developed.
b. Describe any associated, anticipated product(s).
9. EXPERIMENTAL DESIGN AND METHODS:
a. Describe how the work will be carried out, stepwise to the final product. This section should provide sufficient detail so that a knowledgeable reviewer can judge whether the approach is reasonable and complete.
b. Explain the rationale for the approach, relative to other approaches that could be taken.
c. Identify key associate investigators (by name, if possible) and the research contribution expected from each.
10. ASSESSMENT OF RISK:
a. Discuss the perceived level of risk of the research (high, medium, low). Are there any special considerations (i.e., new technological opportunities) that especially support investing in this R&D effort at this time?
b. Discuss any known problems that could inhibit the success of the R&D effort, and factors which contribute to research risk.
11. TRANSITION APPROACH:
a. Describe how the research product(s) would transition to use by the Fleet.
b. Describe any interactions with a Fleet user or transition sponsor.
c. Estimate how long it would take to achieve the transition product.
12. RELATED ACTIVITIES:
a. Identify any other groups (government or civilian) performing similar R&D efforts.
b. State whether Defense Technical Information Center (DTIC) and civilian (i.e., Medline) literature searches have been conducted.
c. Discuss any plans for interacting with other groups to maximize the likelihood of success.
13. LITERATURE CITED:
a. Cite the five most pertinent, recent references from the scientific literature.
File details come from the government source that posted it. Updated .