MISSOURI NATIONAL GUARD

AVIATION CLASSIFICATION REPAIR ACTIVITY DEPOT

5250 W. DEPOT ROAD

SPRINGFIELD, MISSOURI 65803-9513

Statement of Work (SOW) for

Tri-Max Fire Extinguisher Rebuild

W912NS-23-Q-8507

SECTION 1

GENERAL

1.0 Purpose: This is a non-personal service contract to provide Tri-Max Fire Extinguisher Rebuild services for the Missouri Aviation Classification Repair Activity Depot (MO AVCRAD) located in Springfield, MO. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, workspace, and quality control necessary, except as specified in Section 2 as Government Furnished, to perform fire extinguisher rebuild services, as defined in this SOW.

1.1.1 Objectives: Rebuild, test, and recertify nine (9) Tri-Max 30 Compressed Air Foam (CAF) fire extinguishers to factory standards. Receive, disassemble, clean, reline tanks, replace parts as indicated, test, and return ship the rebuilt and recertified fire extinguishers to MO AVCRAD.

1.2 Background: MO AVCRAD provides field and limited depot aviation aircraft support to a regional 14 state support area. MO AVCRAD maintains a modern, state of the art, limited depot repair facility capable of completing complex repairs on military aircraft. The rebuild of the fire extinguishers is required to remain compliant with Federal and DoD standards.

1.3 Period of Performance (PoP): The Period of Performance shall be approximately 180 days from the contract award date.

1.4 Place and Performance: Performance shall be at contractor’s facility.

1.5 Supervision: The government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer immediately.

Machine Shop Equipment Move

W912NS-23-Q-8503

1.6 Special Qualifications: The contractor shall ensure all employees possess all required licenses and certifications for the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)

SECTION 2

GOVERNMENT FURNISHED PROPERTY

2.0 The Government will not furnish workspace or equipment for the contractor to perform services outlined in this SOW.

SECTION 3

CONTRACTOR FURNISHED PROPERTY

3.0 Except for those items specifically stated to be Government-Furnished in Section 2 above, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

3.1 Contractor will supply all special tooling and fixtures at contractor's expense, including parts, personnel, equipment, and any other miscellaneous items required for the rebuild of the fire extinguishers.

SECTION 4

REQUIREMENTS

4.0 The Contractor shall:

4.1 Receive the nine (9) fire extinguishers (See ATTACHMENT 1) that will be shipped to the contractor from the MO AVCRAD at MO AVCRAD’s expense. No more than one

(1) extinguisher may be removed from service at one time.

4.2 Disassemble each fire extinguisher and clean and reline the tanks. Replace valves, airlines, and O-rings. Hydrostatically test five (5) of the bottles, tanks, and hoses as indicated by (*) in the list at ATTACHMENT 1. Reassemble, and final test each unit in

Machine Shop Equipment Move

W912NS-23-Q-8503

accordance with Title 14, Code of Federal Regulations (CFR), Part 139 as instructed in Advisory Circular (AC) 150/5210-6D - Aircraft Fire Extinguishing Agents as well as National Fire Protection Agency (NFPA) and DoD standards.

4.3 Document actions completed and results of tests. Affix indelibly marked identification tag or decal displaying Item Number, Date of Hydrostatic Test and Certification, and Next Testing Due Date.

4.3.1 Provide hard copy and digital report to the AGSE Supervisor regarding pass/fail status and noting any new or updated data pertaining to each unit.

4.4 Return ship the rebuilt fire extinguishers to the MO AVCRAD within 15 days of receipt, at MO AVCRAD’s expense.

Machine Shop Equipment Move

W912NS-23-Q-8503

ATTACHMENT 1

Listed below are the nine (9) Tri Max 30 fire extinguishers to be rebuilt and recertified.

Items with * require Hydrostatic Testing

Units to Be Serviced and Tested Item Serial

Number U/I Quantity

FIREX SMCAF30 01 327466 EA 1

FIREX SMCAF30 02 330520 EA 1

FIREX SMCAF30 03* 330536 EA 1

FIREX SMCAF30 04* 330511 EA 1

FIREX SMCAF30 05* 327488 EA 1

FIREX SMCAF30 06* 327482 EA 1

FIREX SMCAF30 07* 330533 EA 1

FIREX SMCAF30 08 310385 EA 1

FIREX SMCAF30 09 310393 EA 1