B2750 Telescope Statement of Requirements.pdf
PDF 107 KB Posted
- Attached to
- RAVEN SWIR Telescope Parts
- Solicitation number
- FA930425Q5012
About this file
This Statement of Requirements from the US Air Force Test Pilot School (TPS) details a procurement for specific PlaneWave Instruments SWIR Optimized Telescope Parts for the RAVEN project. The required equipment includes a DELTA RHO 500 (20") Fused Silica Optics telescope, a Series 5 XL 6.26" Focuser, a 5-inch Series-5 Rotator with 40B payload capacity, a Series-5 Controller Kit, a VIS SWIR BAR Coating, and a Camera/Instrument Adaptation component. All parts must be packaged in crating with poly foam and removable screws for protection.
The document specifies that the contractor must deliver all components no later than December 31, 2025, and the requirements are current as of May 13, 2025. The procurement is specifically for the US Air Force Test Pilot School and focuses on specialized telescope parts for what appears to be a research or optical imaging project involving short-wave infrared (SWIR) technology.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF REQUIREMENTS
US Air Force Test Pilot School (TPS)
RAVEN SWIR Telescope Parts Current as of 5/13/2025
1. SCOPE:
The USAF TPS requires PlaneWave Instruments SWIR Optimized Telescope Parts
2. REQUIREMENT:
• The following PlaneWave Instruments equipment is required:
o 1 QTY – Part 200128Q – DELTA RHO 500 (20”) Fused Silica Optics, 1537mm, F/3 o 1 QTY – Part: 6071001 – Focuser Series 5 XL 6.26” o 1 QTY – Part: 6021001 – 5 INCH Rotator Series-5 Rotator – 5” Clear Aperture
Motorized Rotator, 40B Payload Capacity. Requires 5-series o 1 QTY – Part: 600199-KIT – Series-5 Controller – KIT o 1 QTY – COATING – VIS SWIR BAR Coating o 1 QTY – Part: 90000 – Camera/Instrument Adaptation o All parts need to be in crating with poly foam and removable screws for protection.
3. SPECIFICATIONS:
• All parts need to be in crating with poly foam and removable screws for protection.
4. DELIVERY:
The contractor shall meet the above requirements no later than 31 December 2025.
File details come from the government source that posted it. Updated .