B2432 PI0019617 Slide show.pdf
PDF 855 KB Posted
- Attached to
- B2432 - Chattahoochee River Trail, Phase II
- Solicitation number
- PE-77050-NONST-2027-000000109
- Issued by
- Cobb County, Georgia
About this file
This is a slideshow presentation document related to Cobb County, Georgia's Chattahoochee River Trail, Phase II project. The project proposes to develop paved multi-use paths for pedestrians and bicycles along the Chattahoochee River between SR 139/Mableton Parkway and Nickajack Creek. The scope of work includes construction of shared-use paths, a bridge over a small creek at the southern end of the project, and boardwalks over environmentally sensitive areas. The southern terminus will connect to an existing 10-foot wide shared-use path at Lee Industrial Boulevard, while the northern terminus will connect at Nickajack Creek, which serves as the southern terminus for Phase I of the project. This initiative builds on the 2018 Cobb County Greenways & Trails Master Plan and the Chattahoochee RiverLands Greenway Study, a regional plan for the 100-mile Chattahoochee River corridor.
The presentation document provides conceptual and planning information for Phase II of the trail project, which was developed following the adoption of the Phase II conceptual plan. The project aims to provide public access to the Chattahoochee River south of I-285 and establish a model for implementation of future RiverLands segments. The project involves Cobb County-owned property and addresses environmental considerations through the inclusion of boardwalks over sensitive areas. The specific pricing terms, funding sources, and contract award details are not detailed within this slideshow presentation file.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chattahoochee River Trail, Phase II PI No. 0019617
Cobb DOT Project No. B2432 September 24, 2026
Cobb County Department of Transportation
Disclaimer
During this industry forum, Cobb DOT will provide information about the project’s delivery goals, anticipated scope, anticipated Design-Build procurement process, and potential risks. Any information provided by Cobb DOT shall be considered as informational only and is subject to change.
Registered Plan Holders
• BidExpress.com https://www.bidexpress.com/draft_solicitations/83003/edit https://www.bidexpress.com/draft_solicitations/83003/edit
Design-Build Overview
• Design-Build
• Combines preconstruction-related services with construction services into one contract.
• Allows the contractor to participate in the project’s design in an effort to improve communications, expedite project delivery, and reduce costs.
• Governed by:
• 23 Code of Federal Regulations (CFR) Part 636
• Georgia Code Section 32-2-81 (Enacted 2004)
• GDOTBoard Rules, Chapter 672-18 (Adopted 2006 and 2013)
Project Location Map
Project Justification Statement The Chattahoochee River Trail was included in the 2018 Cobb County Greenways & Trails Master Plan as a priority project and detailed in the Chattahoochee RiverLands Greenway Study, a regional river corridor plan for the 100-mile Chattahoochee River corridor. One task of this study was to develop a pilot project conceptual plan for a multi-use path on Cobb County-owned property between SR 139/Mableton Parkway and SR 8/US 278/Veterans Memorial Highway. The conceptual plan was adopted by the Cobb County Board of Commissioners on June 23, 2020 and provides unprecedented access to the portion of the Chattahoochee River south of I-285, giving people the opportunity to see, interact with, and experience nature in a new and unique way, while also serving as a model for implementation of future RiverLand segments.
Phase II of the subject project proposes to provide paved paths for shared use by pedestrians and bicycles along the Chattahoochee River between SR 139/Mableton Parkway and Nickajack Creek. In addition, this phase includes a bridge over a small creek at the southern end of the project and boardwalks over environmentally sensitive areas. The logical termini will be SR 139/Mableton Parkway at Lee Industrial Boulevard on the southern end, where it will connect to an existing 10-foot wide shared-use path, and Nickajack Creek on the northern end. Nickajack Creek is also the southern terminus for Phase I.
Project Overview
• Bike and pedestrian trail along the Chattahoochee River in Mableton, Cobb County, GA.
• The project begins at the southeastern quadrant of the intersection of SR 139/Mableton Pkwy and Lee Industrial Blvd and continues under the SR 139 roadway bridge crossing the Chattahoochee River and along the River to Nickajack Creek.
• The project consists of 10’-17’ shared use path with intermittent modal separation.
• A bridge is proposed over an unnamed creek. Boardwalks will be used over wetlands and other environmentally sensitive areas.
• The project will follow the Chattahoochee Riverlands Design Guide
• This trail is considered a “Main Stem Greenway” trail
• https://www.chattahoocheeriverlands.c om/wp-content/uploads/2022/06/Riverlands- Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf https://www.chattahoocheeriverlands.com/wp-content/uploads/2022/06/Riverlands-Design-Guidelines-Part-01.pdf
Project Schedule
• GDOT/CCDOT Costing Plan and RFP Review October 2026
• PIOH November 2026
• CE Approval Anticipated 2/24/2027
• Procurement Schedule listed in proceeding slides
Other Projects In The Area
• Cobb Project No. X2780, Chattahoochee River Trail Pilot, Phase I – Construction Complete
• Riverlands Gateway Park – Construction anticipated to begin in
• Riverlands Boat Launch Site – Construction anticipated to begin in
• Nickajack Creek Bridge – Construction anticipated to begin in
Design-Build Team Roles and Responsibilities
• Design and construction
• Design Deviation, if required
• Schedule development/management
• Permit and mitigation costs
• Environmental NEPA re-evaluation approval
• Final Utility Coordination
• Complete project within the defined timeline (defined in the Request for Proposals)
Cobb DOT Roles and Responsibilities
• Submittal review
• Coordination with GDOT
• Utility Agreements (Cobb County Marietta Water Authority)
• Construction Oversight
• Material Testing
• CEI
Risks and Mitigation Strategies
• Environmental
• CE anticipated Q1 2027
• Virtual PIOH conducted October-November 2026
• Utilities
• No major relocations anticipated
• Draft CCMWA Easement Encroachment Agreement in RIDs
• Right of Way
• No Right of Way required
• DE/DV/DD
• No Design Exceptions or Design Variances to GDOT or FHWA Controlling Criteria anticipated
• Cobb Review/Approval for Design Deviation to GDOT Drainage Manual Section 12.1.1 for bridge spanning 2-year flood elevation
• Geotechnical
• Limited BFI and soil data to be provided in RIDs
Procurement Method
• Best Value
• Proposals will be evaluated on a combination of their
Price Proposal and Technical Elements
• Price proposals developed based on the advertised RFP
• Apparent Successful Proposer shall be the Responsive, Shortlisted Proposer who obtains the highest combined score of the sum of the Price Proposal Score and the Technical Proposal Score
Tentative Procurement Schedule
TENTATIVE SCHEDULE OF EVENTS
Cobb DOT issues Public Notice Advertisement (PNA) 9/10/2026
Industry Forum – Virtual 9/24/2026
Cobb DOT issues (RFQ) 12/1/2026
Deadline for submission of SOQ 1/15/2027
Cobb DOT issues the Notice to Finalists 2/15/2027
Cobb DOT issues RFP to the Finalists 2/15/2027
ATC Submission Deadline 3/12/2027
Receipt of Proposals from Finalists 4/9/2027
Cobb DOT letting (opening of Price Proposals) 5/13/2027
Required Area Class for Lead Designer
Additional Required Area Classes for DB Team Number Area Class Number Area Class
1.06(a) NEPA Documentation 4.04 Hydraulic and Hydrological Studies (Bridges)
1.06(b) History 5.01 Land Surveying
1.06(c) Air Studies 5.02 Engineering Surveying
1.06(d) Noise Studies 5.08 Overhead/Subsurface Utility Engineering (SUE)
1.06(e) Ecology 6.01(a) Soil Survey Studies
1.06(f) Archaeology 6.01(b) Geological and Geophysical Studies
1.06(g) Freshwater Aquatic Surveys 6.02 Bridge Foundation Studies
1.06(h) Bat Surveys 6.05 Hazardous Waste Site Assessment Studies
1.07 Attitude, Opinion and Community Value Studies 8.01 Construction Engineering
3.08 Landscape Architecture 9.01 Erosion, Sedimentation and Pollution Control Plan (ESPCP) Preparation
3.10 Utility Coordination 9.02 Rainfall and Runoff Reporting
3.12 Hydraulic and Hydrological Studies (Roadway) 9.03 Field Inspections for Compliance of Erosion and Sedimentation Control Device Installations
4.01(a) Minor Bridge Design
OR
4.01(b) Minor Bridge Design - CONDITIONAL
Conflicted Firms
• The following firms are known to be conflicted on this project and may not participate:
• Arcadis U.S., Inc.
• AtkinsRéalis USA, Inc.
• Corporate Environmental Risk Management, LLC
• Croy Engineering, LLC
• Edwards-Pitman Environmental, Inc
• Michael Baker International
• Thomas & Hutton Engineering Co.
• UES Professional Solutions
• United Consulting Group, LTD
• New South Associates, Inc.
SOQ Evaluation Criteria
• SOQ Evaluation Criteria (shortlist)
• Statements of Qualifications (SOQ) will be reviewed for responsiveness, then evaluated by a Technical Review Committee
• Proposers that are deemed responsive and have been shortlisted may submit a price and technical proposal in response to the RFP in accordance with criteria included in the GDOT Design-Build Manual
Key Personnel
• Lead Contractor Project Manager
• Lead Design Consultant Project Manager
• Construction Manager
• Engineer of Record
• Bridge Engineer Lead
• Environmental Team Lead
• Landscape Architect
SOQ Evaluation Criteria
• Experience and Qualifications
• Personnel Evaluation: Lead Contractor Project Manager
• Personnel Evaluation: Lead Design Consultant Project Manager
• Personnel Evaluation: Other Personnel
• Firm Evaluation: Lead Contractor
• Firm Evaluation: Lead Design Consultant
• Suitability and Past Performance
• Team Evaluation: Apparent Suitability to Provide Services for the Project
Required Information
• Lead Contractor/Lead Design Consultant basic company information
• Lead Contractor Certificate of Qualifications
• Lead Design Consultant and subconsultants Notice of Professional
Consultant Qualifications
• Matrix listing proposer’s Georgia DOT Prequalified Area Classes
• Respondent’s team must have an identified team member who is prequalified for each of the foregoing Georgia DOT Prequalified Area Classes
• Exhibit II
• Certification Form for Lead Contractor
• Certification Form for Lead Design Consultant
Required Information (cont)
• Statement of Disclosure (Conflict of Interest)
• Organizational Chart and Narrative
• Letters regarding financial capacity of the respondent, the lead contractor, the lead design consultant, and each major subcontractor and major subconsultant
• Signed Certificate and Acknowledgment (bond) Form
Required Information (cont)
• Industrial Safety Record
• Key Personnel experience and qualifications
• A minimum of 10 years industry experience for each Key Personnel position and should include at least three years of experience in the same or similar role for projects of similar size and complexity as the Project.
• Lead Contractor experience and qualifications
• At least three construction projects delivered using Alternative Delivery and/or
Design-Bid-Build projects which collectively demonstrate similar size, function, complexity, scope of the project, project understanding, and alternative delivery approach.
• Lead Design Consultant experience and qualifications
• At least three design projects delivered using Alternative Delivery and/or Design-Bid-
Build contracting that demonstrate similar size, function, complexity, and/or scope of the project.
RFP Process
• Multiple volumes
• Instructions to Proposers
• Design-Build Agreement
• Technical Provisions
• Proposer feedback during RFP Phase
• Question and Response
• Proposal packages will include an administrative information submittal, technical proposal, and a price proposal to include firm-fixed pricing secured by a proposal bond
• Alternative Technical Concepts will be accepted
• No Stipulated Fee
Alternative Technical Concepts (ATCs)
• Proposers may submit ATCs
• Confidentiality will be maintained throughout RFP process
• One-on-one meetings can be held
• Accepted ATCs will be approved on a proposer-specific basis
Best Value
Technical proposal 650 points
Price Proposal 350 points
Total Points Possible 1000
Price Proposal Score = (Price Proposal Lowest Bid ÷ Price Proposal Respective Proposer’s Bid)*350
Tentative Technical Proposal Evaluation Scoring Technical Solutions & Design 200 points
Past Performance 150 points
Schedule Efficiency 150 points
Consistency with Chattahoochee Riverlands Design guidelines 75 points
Approach to Environmental Management 75 points
Questions?
• One-on-one meetings
• Available on a first come, first served basis between interested parties and
Cobb DOT staff until RFQ advertisement
• To schedule a one-on-one meeting, send an email to karyn.matthews@cobbcounty.gov
• During Procurement
• Once advertised, all proposer questions shall be submitted via Cobb County
Procurement Services
• References:
• GDOT Design Build Website: https://www.dot.ga.gov/GDOT/Pages/DesignBuild.aspx
• Cobb DOT: https://www.cobbcounty.gov/transportation/current-bids-rfps mailto:karyn.matthews@cobbcounty.gov https://www.dot.ga.gov/GDOT/Pages/DesignBuild.aspx https://www.cobbcounty.gov/transportation/current-bids-rfps https://www.cobbcounty.gov/transportation/current-bids-rfps https://www.cobbcounty.gov/transportation/current-bids-rfps https://www.cobbcounty.gov/transportation/current-bids-rfps https://www.cobbcounty.gov/transportation/current-bids-rfps
Thank You
| Slide Number 1 |
| Disclaimer |
| Registered Plan Holders |
| Design-Build Overview |
| Project Location Map |
| Project Justification Statement |
| Project Overview |
| Slide Number 8 |
| Project Schedule |
| Slide Number 10 |
| Design-Build Team Roles and Responsibilities |
| Cobb DOT Roles and Responsibilities |
| Risks and Mitigation Strategies |
| Procurement Method |
| Tentative Procurement Schedule |
| Required Area Class for Lead Designer |
| Additional Required Area Classes for DB Team |
| Conflicted Firms |
| SOQ Evaluation Criteria |
| Key Personnel |
| SOQ Evaluation Criteria |
| Required Information |
| Required Information (cont) |
| Required Information (cont) |
| RFP Process |
| Alternative Technical Concepts (ATCs) |
| Best Value |
| Tentative Technical Proposal Evaluation Scoring |
| Questions? |
| Slide Number 30 |
File details come from the government source that posted it. Updated .