This document contains a proposal schedule for a federal construction contract opportunity with the Department of the Interior Fish and Wildlife Service. The proposal schedule outlines 8 base bid tasks and 1 optional task for construction work at the Bear Lake National Wildlife Refuge to enhance wetlands at Bunn Lake. The base bid tasks include field verification, mobilization and demobilization, installation of erosion and sediment controls, construction of a dewatering system, construction and installation of a new water control structure and inlet and outlet channels, special inspections and tests, site restoration, and all other necessary work. The optional task is for placement of new asphalt pavement. Offerors are required to provide pricing for all tasks. The closing date for this solicitation is not stated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BEAR LAKE NATIONAL WILDLIFE REFUGE.
BUNN LAKE WETLAND ENHANCEMENT PROJECT.
PROPOSAL SCHEDULE
SCHEDULE OF PRICES
INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their bid (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks nd Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Offeror shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.
Construction - Base and Option Bids:
Reference Drawing Page(s)
SOW
Task No.
Description Quantity Unit Amount
G001, G002, G003, G004, EC001, EC002,
GC001, GC002,
C101, C102, C103, C104, GS001,
S101, S102.
(BASE)
Field Verification Site Visit. Review of Existing Site Features and Existing Site Conditions. Document Review, Planning, Development, Preparation, and Submittal of Project Documents.
Review Contract Drawing Pages, Specification Pages, and All Associated Contract Documents.
Perform a Field Verification Site Visit and Review Existing Site Features and Existing Site Conditions.
[The General Contractor Management Team shall be required to Attend this Field Verification Site Visit with the USFWS.] After Performing the Field Verification Site Visit, Develop, Prepare, and Submit General Requirement Specification Submittals under Division 01. Develop, Prepare, and Submit Technical Specification Submittals and Design Submittals under All Remaining Division Sections. As New Technical Specifications are Added by the Contractor and Contractor's Manufacturer, the Contractor shall update their Submittal Registry as Necessary.
Major Contractor Submittals to be submitted include a Traffic Control Plan and a Construction Access Agreement.
The Traffic Control Plan shall be developed, prepared, and submitted to the Bear Lake County Road Department and PacifiCorp for Review and Approval / Disapproval and shall meet the requirements of Bear Lake County and Idaho Transportation Department.
In addition, a separate Construction Access Agreement shall be developed, prepared, and submitted to PacifiCorp for Review and Approval / Disapproval.
To include but not be limited to:
Incidentals.
All Associated Hardcopy and Electronic Deliverables.
1 Lump Sum
Not Referenced.
(BASE)
Mobilization and Demobilization. Mobilize All Labor, Materials, PPE, Equipment, and Tools onto the Project Site.
De-Mobilize All Labor, Materials, PPE, Equipment, and Tools from the Project Site. 1 Lump Sum
PROPOSAL SCHEDULE
SCHEDULE OF PRICES
INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their bid (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks nd Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Offeror shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.
Construction - Base and Option Bids:
Reference Drawing Page(s)
SOW
Task No.
Description Quantity Unit Amount
EC001, EC002.
(BASE)
Construct and Install Site, Sediment, and Erosion Control Measures.
To include but not be limited to the following:
Temporary Soil Stabilization Measures.
Permanent Soil Stabilization Measures.
Bare Ground Protection Measures.
All Erosion and Sediment Control Measures.
All Re-Vegetation Measures.
Down Gradient Sediment Control Measures.
Bio Bags and Other Barrier Protection Measures.
Develop, Prepare, Submit and Maintain On-site a Written Spill Prevention and Response Procedure.
Develop, Prepare, Submit, and Maintain Toxic and Hazardous Materials Storage, Application, and Disposal Procedures.
1 Lump Sum
EC002.
(BASE)
Construct and Install Dewatering and Coffer Dam System.
The System shall be installed around the Inlet and Outlet of the Proposed New Water Control Structure.
Contractor shall Field Verify Existing Conditions and Field Adjust Dewatering and Coffer Dam System as necessary to meet Project Requirements.
1 Lump Sum
PROPOSAL SCHEDULE
SCHEDULE OF PRICES
INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their bid (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks nd Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Offeror shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.
Construction - Base and Option Bids:
Reference Drawing Page(s)
SOW
Task No.
Description Quantity Unit Amount
GC001, GC002,
C101, C102, C103, C104, GS001,
S101, S102.
(BASE)
Construct and Install New Water Control Structure.
New Water Control Structure includes but is not limited to:
- Contractor's Construction Site Layout.
- Owner Supplied and Contractor Installed JM Eagle 48-Inch Diameter Dual Wall Corrugated Polyehtylene Pipe,
- Contractor Supplied and Contractor Installed Filter Diaphragm,
- Owner Supplied and Contractor Installed Pre-Cast and/or Cast-In-Place Reinforced Concrete Control Structure Inlet Riser,
- Contractor Supplied and Contractor Installed Reinforced Concrete Control Structure Inlet Foundation System,
- Owner Supplied and Contractor Installed Pre-Cast and/or Cast-In-Place Reinforced Concrete Control Structure Outlet Riser,
- Contractor Supplied and Contractor Installed Reinforced Concrete Control Structure Outlet Foundation System,
- Contractor Supplied and Contractor Installed Inlet Channel Apron,
- Contractor Supplied and Contractor Installed Outlet Channel Apron,
- Contractor Supplied and Contractor Installed Inlet and Outlet Wing Walls and Retaining Walls,
- And All Associated Contractor's Excavaton, Over-Excavation, Fill, Backfill, and Compaction required for a 100% Complete Turnkey Installation.
1 Lump Sum
C101.
(BASE)
Construct Inlet and Outlet Channels and Open Up Inlet and Outlet Channels to New Water Control Structure and Waterbodies.
After Completion and Owner Acceptance of the New Water Control Structure and Pipe Installation, Breach and Excavate an Approximate 30 Feet Long Channel between the Water Control Structure and Borrow Ditch.
After Completion and Owner Acceptance of the New Water Control Structure and Pipe Installation, Breach and Excavate Trench and Extend Rip Rap Materials to 5 Feet Beyond the Toe of Slope in St. Charles Creek.
This Operation is Expected to require Dewatering and a Coffer Dam to Install the Geotextile Fabric and Rip Rap.
PROPOSAL SCHEDULE
SCHEDULE OF PRICES
INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their bid (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks nd Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Offeror shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.
Construction - Base and Option Bids:
Reference Drawing Page(s)
SOW
Task No.
Description Quantity Unit Amount
Not Referenced.
(BASE)
Perform Special Inspections and Tests and Standard Inspections and Tests for the Full Duration of On-Site Work Activities and as part of the Contractor's Quality Assurance and Quality Control Program and Plan (QA-QCPP).
To include but not be limited to:
Laboratory, Shop, and Field Inspections and Test Reports for:
- International Building Code and State Building Code - Special Inspections and Tests as defined in relevant IBC Chapters and State Building Code Chapters.
- Rebar Inspections and Inspection Reports for Rebar Size, Spacing, Quantity, and Placement in the Formwork for Pre-Cast and Cast-In-Place Concrete Elements.
- Anchor Bolts, Anchor Rods, Bolts, Nuts, and Washers Inspections and Inspection Reports for Size, Spacing, Quantity, and Placement in the Formwork.
- Concrete Cylinder Compressive Strength Tests and Test Results at the 7-Day and 28-Day Cure Times.
- Compaction Tests and Test Results for All Products and Materials to be Placed and Installed and Intended to Support Above and Below Grade Structural Loads.
- All Other Inspections, Tests, and Test Results not noted but required as part of the Contract Technical Specifications provided as a separate attachment to this Statement of Work.
- Incidentals.
- All Associated Electronic and Hard Copy Deliverables.
1 Lump Sum
G001, G002, G003, G004, EC001, EC002,
GC001, GC002,
C101, C102, C103, C104, GS001,
S101, S102.
(BASE)
Perform Site Restoration and Restore Site to previous Existing Conditions or 'Improved Conditions.'
To include but not limited to:
Re-Establishing and Re-Configuring Ground Surface Profiles to Match Existing Conditions and Site Grades.
Re-Seeding of All Disturbed Ground Surfaces and Re-Establishment of Vegetation to minimize ground surface erosion.
Incidentals.
All Associated Hardcopy and Electronic Deliverables.
PROPOSAL SCHEDULE
SCHEDULE OF PRICES
INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their bid (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks nd Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Offeror shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.
Construction - Base and Option Bids:
Reference Drawing Page(s)
SOW
Task No.
Description Quantity Unit Amount
Not Referenced.
A
(OPTION)
Place, Compact, and Install New Asphalt Road Surface Course at location of previous Asphalt Pavement and Below Grade Excavation. Minimum Asphalt Thickness to Match Existing. Refer to Drawing Page 9 (C101), Structure Plan, Key Note B.
To include but not be limited to:
Incidentals.
All Associated Hardcopy and Electronic Deliverables.
1 Lump Sum
Not Referenced.
(BASE)
All Other Necessary Work for a Complete and Operable Project In Accordance With All The Requirements of the PE's Stamped and Signed Bid Documents (Drawings and Specifications) and Contractor's Manufacturer's Design Drawings and Specifications. 1 Lump Sum
Total $0.00
The Offeror shall provide a detailed breakdown of their bid and all associated line item pricing.
The above Proposal Schedule Description column is not intended to be comprehensive. It is the responsiblilty of the Offeror to ensure all requirements are met.
As part of the Proposal Schedule, and at the Offeror's discretion, Prepare and Submit Back-Up Documents for the Proposal Schedule including Number of Labor Categories, Labor Rates, Number of Labor Hours, Material Quantities, Equipment Quantities, PROPOSAL SCHEDULE
SCHEDULE OF PRICES
INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their bid (including support documentation) and all associated line item pricing. It is the responsibility of the Offeror to ensure all requirements are met and all support documentation is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks nd Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Offeror shall show pricing for items. Failure to provide pricing for all items may result in bid not being considered for award.
Construction - Base and Option Bids:
Reference Drawing Page(s)
SOW
Task No.
Description Quantity Unit Amount
Equipment Rates, and Required Tools. Include All Items Required and Anticipated to successfully deliver the Project.
As the Contractor is preparing their Proposal, Material Quantities require Contractor assumptions.
The Contractor/Offeror may submit their assumptions about Material Quantities as part of their Offer.
Whether the Contractor/Offeror chooses to submit their assumptions about Material Quantities to USFWS for review and as part of their Offer is at the discretion of the Contractor/Offeror.
Incomplete Bids Will Not Be Considered.
Name of Bidder and Company:
Address (Include Zip Code):
File details come from the government source that posted it. Updated .