B08 W519TC24R0014 - 20240827.pdf

PDF 218 KB Posted

Attached to
M1A3 Bangalore Torpedo Kits
Solicitation number
W519TC-24-R-0014
Issued by

About this file

This document is a Request for Proposal (RFP) issued by the Army Contracting Command - Rock Island (ACC-RI) to procure Demolition Kits, Bangalore Torpedo: 2.5 FT, M1A3. The RFP is issued under the Women-Owned Small Business (WOSB) program and is restricted to Accurate Energetics Systems, LLC. The procurement includes a First Article Test, the Demolition Kits, and associated data items. ACC-RI is the only authorized issuing activity for delivery orders under the resulting Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract, which will have a guaranteed minimum of $4,250,000 and a maximum of $7,000,000. The RFP requires firm-fixed pricing to be submitted in a price matrix and includes requirements for packaging, inspection, acceptance, configuration management, and data deliverables. Proposals are due by 1200 Central Standard Time on 26 September 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W519TC-24-R-0014

X

2024SEP2612:00pm

DOA6

SEE SCHEDULE

W519TC

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

COLIN M. SOMMERS

(520)693-1274

CCRI

COLIN.M.SOMMERS.CIV@ARMY.MIL

X 5 25

1 84

X 1

X 4 X 6

X 10 X 11 X 22

X 28

X 30

X 35

X 60

X 61

X 72

X 84

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: COLIN M. SOMMERS

Buyer Office Symbol/Telephone Number: CCRI/(520)693-1274

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

EXECUTIVE SUMMARY_________________

A001. The Army Contracting Command - Rock Island (ACC-RI) issues this Request for Proposal (RFP) W519TC-24-R-0014 to procure the____ following Demolition Kits, Bangalore Torpedo:

CLIN ITEM National Stock Number (NSN)____ ____ ___________________________

0001 First Article Test N/A

0002 DEMOLITION KIT, BANGALORE 1375-01-528-7226

TORPEDO: 2.5 FT, M1A3 FAT

0003 Contract Data List N/A

Requirements

A002. This RFP is issued in accordance with (IAW) 10 U.S.C. 3204(a)(5), as implemented by Federal Acquisition Regulation (FAR) 6.302-5,____

Authorized or required by statute and FAR 19.1506(b), Women-Owned Small Business Program sole-source awards. Therefore, this RFP is restricted to Accurate Energetics Systems, LLC (AES). As a result of this solicitation, the Government intends to award to AES an

Undefinitized Contract Action (UCA) resulting, upon definitization, in a firm-fixed-price Indefinite-Delivery, Indefinite-Quantity

(IDIQ) contract with two, 12-month ordering periods, subject to AES being determined a responsible contractor prior to awarding the UCA, and the contracting officer's determination that AES's price(s) is/are fair and reasonable prior to definitizing the UCA.

A003. The ordering periods anticipated for the resultant contract are provided below:____

Ordering Period 1: Date of Award - 365 Days After Award (DAA)

Ordering Period 2: 366 DAA - 730 DAA

ACC-RI is the only contracting activity authorized to issue delivery orders under any resultant contract award.

A004. The North American Industry Classification System Code (NAICS) for this acquisition is 332993.____

A005. The UCA which may be awarded from this solicitation will be subject to Defense Federal Acquisition Regulation Supplement (DFARS)____

217.7404-4, Limitations on obligations. If the Government awards the IDIQ contract to AES, then the guaranteed minimum dollar amount for this procurement is $4,250,000.00 which will be awarded in the first delivery order in accordance with DFARS 217.7404-4 at or near the time of the IDIQ contract award. After the guranteed minimum dollar amount has been satisfied, the Government has no obligation to order additional quantity under the IDIQ contract.

A006. The maximum dollar amount that may be procured under the resultant contract is $7,000,000.00.____

A007. The Government will not reimburse AES for incurred costs associated with preparation of its proposals.____

A008. Price Matrix. This RFP includes range pricing as set forth in the Price Matrix, Attachment 0001, instead of Section B pricing. All____ proposed prices should be entered in Attachment 0001, Price Matrix. Failure to provide firm-fixed-prices for all CLINs, all quantity ranges, and all ordering periods on the Price Matrix is unacceptable and may render the offeror ineligible for award.

I. Refer to Section L for instructions for completing the Price Matrix, and Section M for how the Government will evaluate Price.

II. AES's Initial Price Proposal shall include, at a minimum, the Price Matrix reflecting Not-to-Exceed prices to permit award of a

UCA.

III. Within 30 days after award of a UCA, AES shall submit its Qualifying Proposal to include the Price Matrix and cost proposal/

Certified Cost or Pricing Data to support AES's proposed First Article Test (FAT) prices and proposed unit prices for each ordering period and each quantity range, as applicable.

2 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

IV. Upon definitization of the UCA, the prices reflected in the Price Matrix shall be fully executable by the Government at the prices and quantity range limits specified in the Price Matrix. All unit prices will be binding.

A009. Inspection/Acceptance/F.O.B. Point for production shall be Origin / Origin / Origin. See Section F, "Deliveries or Performance."____

The

Transportation Account Code (TAC) will be designated in each individual delivery order. The Government affirms that production quantities, where transportation protective services or transportation security is required by other clauses of the contract, shall be delivered F.O.B. Origin and shipped via a Government Bill of Lading.

A010. Monthly production deliveries shall start no later than 60 days after FAT approval (or waived). Delivery schedules will be____ established with each delivery order. Accelerated deliveries, defined as occurring prior to the scheduled month, require written contracting officer approval.

A011. Prior approval of Contract Data Requirements List (CDRLs), (i.e., QPP, SPC, MSE/AIE, ADC, OPSEC Plan, PoP Test, etc.) on other____

Government contracts does NOT guarantee roll-over approval of CDRLs on any award resulting from this RFP. All CDRLs and solicitation provisions/contract clauses must be flowed down to and met by subcontractors and vendors at all tiers.

A012. AES is advised to carefully read Section L and Section M before submitting any proposals. AES is responsible for understanding all____ requirements of the RFP and ensuring its proposal is complete, including all fill-ins and blanks in the solicitation. If fill-ins are not applicable, please indicate "N/A."

A013. AES may submit any questions via email to the PCO, Mrs. Megan Kirby, megan.m.kirby.civ@army.mil, and Contract Specialist, Mr.____

Colin Sommers, colin.m.sommers.civ@army.mil, until 1500 Central Time on 13 September 2024.

A014. AES's initial proposal will be due no later than 1200 Central Standard Time on 26 September 2024. Proposals shall be submitted____ electronically to the Contract Specialist, Mr. Colin Sommers, colin.m.sommers.civ@army.mil, and the PCO, Megan Kirby, megan.m.kirby.civ@army.mil. AES is responsible to confirm with the contracting officer and/or contract specialist to ensure that proposal(s) submitted have been received by the contracting officer and/or contract specialist by the date/time set forth in the RFP for receipt of offers.

A015. All proposals shall be submitted in English language and prices shall be proposed in U.S. dollars.____

A016. AES's proposal shall remain valid for 240 days from the submission of a Qualifying Proposal.____

A017. Clauses and provisions from the FAR and supplements thereto are incorporated into this document by reference and in full text.____

Those incorporated by reference have the same force and effect as if they were given in full text.

A018. In the event a discrepancy between any statements in the Section A Executive Summary and another section of the RFP exists, the____ other sections take precedence.

A019. The Technical Data Package (TDP) associated with this procurement is classified as Distribution "D" which means it is limited to____ the Department of Defense (DoD) and U.S. DoD Contractors only. Dissemination shall be in accordance with the provisions of DoD directive

5230.25. Violations of export laws are subject to civil and criminal penalties. Distribution of this TDP is only authorized to U.S.

agencies and private individuals or enterprises eligible to obtain export-controlled technical data in accordance with regulations implementing 10 U.S.C. 130. Controlled Documents (including the TDP) may be obtained by having an active Joint Certification Program

(JCP) account. THE PERSON APPROVED FOR AES'S BUSINESS IN JCP MUST BE THE PERSON WHO REQUESTS ACCESS IN SAM OR AES WILL BE DENIED ACCESS

TO THE TDP.

A020. This RFP should not be discussed with any U.S. Government employee except the Contracting Officer, Ms. Megan Kirby, or her____ representative, Mr. Colin Sommers. Any formal communications such as request for clarifications, discussions/negotiations, and/or information concerning this RFP should be submitted in writing to Mr. Sommers by email at colin.m.sommers.civ@army.mil. Please indicate the RFP number, W519TC-24-R-0014, in the subject line.

*** END OF NARRATIVE A0001 ***

3 84

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 FIRST ARTICLE TEST __________________

FAT shall be conducted IAW Section E-9.

FAT Plan (CDRL A004) shall be submitted no later than 120 calendar days after contract award.

Government/PCO approval of the FAT Plan shall be obtained prior to FAT.

FAT Report (CDRL A005) shall be submitted 270 calendar days from delivery order issuance and no later than 30 calendar days after completion of the

FAT. Within 30 calendar days after the Government receives the test report, the PCO shall notify the

Contractor of the conditional approval, approval, or disapproval of the FAT. PCO approval of the FAT

Report shall be obtained prior to start of production.

*ALL FAT PRICES SHALL BE SUBMITTED IN THE PRICE

MATRIX AT ATTACHMENT 0001 - DO NOT SUBMIT PRICING

INFO IN SECTION B FOR ANY CLIN.*

(End of narrative B001)

0002 DEMOLITION KIT, BANGALORE TORPEDO: 2.5 FT, M1A3 _______________________________________________

NOUN: Demolition Kit, Bangalore Torpedo: 2.5 ft, M1A3

NSN: 1375-01-528-7226

DODIC: MP03

CONTRACT TYPE: Firm-Fixed-Price

INSPECTION AND ACCEPTANCE:_________________________

Inspection: Origin

Acceptance: Origin

DELIVERIES OR PERFORMANCE:_________________________

FOB POINT: Origin

Delivery destinations shall be identified in Section

B of each delivery order.

*ALL UNIT PRICES SHALL BE SUBMITTED IN THE PRICE

MATRIX AT ATTACHMENT 0001 - DO NOT SUBMIT PRICING

INFO IN SECTION B FOR ANY CLIN.*

(End of narrative B001)

4 84

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0003 DATA ITEMS - CDRL (DD FORM 1423) ________________________________

The Contractor shall prepare and deliver data submissions in accordance with the requirements, quantities, and schedules set forth in the Contract

Data Requirements List (CDRL) found in Exhibit A.

A DD250 is not required.

(End of narrative B001)

5 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C-1 DRAWINGS AND SPECIFICATIONS ___________________________

(a) In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.

(b) The following drawings and specifications in accordance with the Technical Data Package Listing (TDPL) identified as follows, with revisions in effect as stated, are applicable to this procurement, and revisions of documents thereon:

ITEM NSN TDPL DATE______________________________________________________________________________________________

COAI-DEMO KIT BANGALORE TORPODP:2.5FT M1A3 1375-01-528-7226 13010551:19200 02/15/2024

(c) Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with the clause titled

"Technical Data Package Information and Distribution and Destruction of Restricted Technical Data" in Section C-2 of this document.

(d) The following engineering exceptions apply to the procurement:

(1) PRODUCT DRAWING AND ASSOCIATED LISTS

Delete Drawings: 8863370 and 8863391

(2) SPECIFICATIONS AND STANDARDS

Add Specification: A-A-59136

(3) SAFETY

SD ADD

67 X

150 X

453 X

10162 X

C-2 TECHNICAL DATA PACKAGE INFORMATION AND DISTRIBUTION AND DESTRUCTION OF RESTRICTED TECHNICAL DATA ________________________________________________________________________________________________

(a) TDPs will be obtained electronically via the "Contract Opportunities" posting for this requirement on the SAM.gov website. You must have an account prior to accessing any TDP(s). To register for an account in SAM.gov, please visit https://secure.login.gov/?request_id=d84abb0e-1664-4378-afa0-f29595aefb72 and select "create account." The toll free helpdesk phone number is (866)606-8220 and for International(334)206-7828. Vendors are responsible for placing correct information in SAM.gov.

(b) You may need to use special software to view the documents that are posted on SAM.gov. This viewing software is freeware, available for download at no cost from commercial websites like Microsoft and Adobe. Additionally, some TDPs may require ImageR or Lucent viewers to view the TDP(s) and are available as freeware at:

ImageR Viewer: http://g6msd.redstone.army.mil

Lucent Viewer: http://www.ec-edi.com/

(c) The TDP(s), TDPL(s) and their corresponding outstanding Engineering Exceptions for this solicitation will be accessible via the solicitation posting in "Contract Opportunities" (as described below) from the date of issue through the time specified on the solicitation for receipt of offers.

(d) RESTRICTED TDP(s): TDPs and any other related documents, if applicable, for this solicitation are restricted and can be accessed electronically via the solicitation posting, with valid contractor login credentials. TDPs and any other related documents are posed with various options, such as Restricted and Export Control. These additional controls are described below:

(1) Access to RESTRICTED TDP(s):

(i) TDP(s) that have been marked as Restricted can be accessed electronically via the solicitation posting, with valid contractor login credentials. TDP(s) that have been marked as Restricted will require U.S. Government approval prior to gaining access to the

6 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

requested information. To request access log in to SAM.gov, go to the applicable solicitation under "Contract Opportunities" within

SAM.gov, select the "Attachments / Links" tab, and then click on the Request Explicit Access button. A copy of an approved DD2345 for the data custodian making the request will need to be provided to the contracting officer and contract specialist via email for this procurement in order to be approved explicit access.

(ii) Completion of a Use and Non-Disclosure Agreement form may be required prior to gaining access to the TDP. Please allow 2-3 working days to process your request. You will receive a system generated email from "donotrely@sam.gov" saying "A Notice Manager from

ACC-RI has updated your access to Controlled Documents. Click here to sign in and view the request details or go to the notice to access the Controlled Documents." If your request is denied you will be able to see further details of why you were and how to proceed.

(2) Access to EXPORT CONTROL TDP(s):

(i) TDP(s) that have been marked as Export Control can be accessed electronically via the solicitation posting, with valid contractor login credentials. In addition, to obtain access to these TDP(s), vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement, on file with the Defense Logistics Information Service (DLIS). If you do not have an approved DD 2345, Militarily Critical Technical Data Agreement, on file with DLIS, then you will not be able to access the TDP. To obtain certification, go to https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/DD2345Instructions/ , click on Documents and follow the instructions provided. Processing time is estimated at five (5) working days after receipt.

(ii) TDP(s) that have been marked Export Control will require U.S. Government approval prior to gaining access to the requested information. To request access log in to SAM.gov, go to the applicable solicitation under "Contract Opportunities" within SAM.gov, select the "Attachments / Links" tab, and then click on the Request Explicit Access button. The requestor MUST BE the data custodian that is listed on the DD 2345. Please allow 2-3 working days to process your request. If the company MPIN changes, the user will be required to verify the MPIN again to gain access to the Export Control TDP(s). Completion of a Use and Non-Disclosure Agreement form may be required prior to gaining access the TDP. You will receive a system generated email from "donotrely@sam.gov" saying "A Notice Manager from ACC-RI has updated your access to Controlled Documents. Click here to sign in and view the request details or go to the notice to access the Controlled Documents." If your request is denied you will be able to see further details of why you were and how to proceed.

(iii) If multiple individuals in your company need access to the Export Control TDP for solicitation, it can be obtained from your data custodian listed on the DD 2345.

(iv) TDP(s) that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.

seq.) or the Export Administration Act of 1979. as amended, Title 50, U.S.C., App. 2401 et. seq.

(3) Further dissemination of Restricted TDP(s) must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(4) Upon completion of the purposes for which the Restricted technical data has been provided, the contractor is REQUIRED to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion of removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

(e) Questions related to registration in SAM.gov should be directed to https://fsd.gov/fsd-gov/home.do . The helpdesk phone number is

(866)606-8820. Vendors are responsible for placing correct information in SAM.gov. A user guide for SAM.gov can be found here:

https://dodprocurementtoolbox.com/site-pages/contract-opportunities .

C-3 STATEMENT OF WORK: CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION ________________________________________________________________

(a) The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the

Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, NORs, and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.

(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notices of Revision (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.

(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-

1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP

7 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.

(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre- production (formerly known as Request for Deviation (RFD)) or post- production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

(b) Submission of requested changes - The submission of an ECP or RFV by the contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this contract by the contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the contracting officer and documented via modification to the contract. The submission of an ECP and/or RFV by the contractor shall not preclude the Government from exercising its rights under any clause of the contract.

(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).

C-4 STATEMENT OF WORK: LIGHT AND MEDIUM PHOSPHATE COATING REQUIREMENT _________________________________________________________________

(a) The following requirements regarding light and medium phosphate coatings are applicable to this statement of work and any resultant contract in addition to those requirements set forth in specification TT-C-490F Amendment 3.

(b) Paragraph 3.2.1 of TT-C-490F Amendment 3 refers to "Procedure Approval." Prior to production, a detailed written procedure identifying cleaning, pretreatment and painting processes shall be submitted to the procuring agency for approval. Process time, temperature, chemical concentrations, process controls and acceptance criteria and any other pertinent details shall be listed for each step of the application process. The procedure shall include the manufacturer and exact proprietary designation of any material used as well as any equipment used in the application of the procedure. The complete procedure which demonstrates ability to pass the performance tests contained herein is to be signed by a company official prior to its submittal for approval. Deviation from the approved procedure is not permitted without written approval from the procuring agency (see Supplementary Requirements for Non-CARC).

(c) Paragraph 3.2.2 of TT-C-490F Amendment 3 refers to "Preproduction Validation Panels." The test panels shall be the same substrate as will be used in production. For parts or panels requiring epoxy primer and urethane/epoxy topcoat finishes (CARC paint systems), the preproduction panels or parts three phosphated only; three phosphate plus primer; three phosphate, primer, and topcoat. For parts or panels requiring Alkyd topcoat finishes, the preproduction panels or parts three phosphated only; three phosphate plus topcoat.

C-5 ENGINEERING SUPPORT ___________________

Throughout the life of this contract, the contractor may be required to provide additional support, above and beyond what is already required by the terms and conditions in this contract. This may include, but is not limited to, activities associated with Material

Change and/or Maintenance efforts, Qualification/Malfunction testing such as providing test assets and/or subcomponents/components as required/needed, etc. As support is needed, the U.S. Government will provide the contractor with a formal request detailing the type of support needed (i.e., manufacturing engineering support and/or hardware/components) that will be negotiated and incorporated by contract modification.

C-6 CONTRACTUAL BASELINE ____________________

(a) The Technical Data Package (TDP) issued through "Contract Opportunities" in the SAM.gov website in conjunction with the RFP will serve as the TDP baseline at the time of contract award. After contract award, Engineering Change Proposals (ECP) and/or Requests for

Variations (RFV) may be incorporated via a contract modification.

(b) The U.S. Government may require specific efforts applicable to production design or material changes, obsolescence mitigation concepts, malfunction investigations, and product tear downs for the program to address safety, cost, and performance issues during the contract period of performance. These efforts will be initiated through Statements of Work (SOWs) or Engineering Change Proposals (ECPs) and reviewed by the contractor prior to incorporation into the contract via contract modification.

C-7 STATEMENT OF WORK: RESTRICTION OF CRITICAL ITEMS AND COMPONENTS _______________________________________________________________

(a) The items and components listed in paragraphs (b) and (c) are critical to the support of national defense items. As such, it is necessary to create and/or maintain a domestic capability for the production of these items and components by limiting production and procurement to the United States/Canadian industrial base.

8 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(b) Items listed in this paragraph, to include all components contained therein, down to but not including raw materials (unless a more stringent restriction applies as set forth elsewhere in this contract), must be manufactured, assembled, and tested in the United States or Canada. Raw material is defined as material in the mill forms and shapes normally produced for commercial use.

DEMOLITION KIT, BANGALORE TORPEDO: 2.5 FT, M1A3 NSN: 1375-01-528-7226 DODIC: MP03

(c) Components listed in this paragraph must be manufactured, assembled, and tested in the United States or Canada.

N/A

In all cases, final assembly and testing of the items listed in the Schedule in Section B of this contract must be performed in the

United States or Canada.

(d) The failure of the contractor or subcontractor(s) to comply with this statement of work shall be a material breach of the contract.

(e) The contractor will insert the substance of this statement of work, including this paragraph (e), in every subcontract for items or components identified above to ensure flow down to, but not including, raw materials.

*** END OF NARRATIVE C0001 ***

9 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D-1 PACKAGING AND PALLETIZATION REQUIREMENTS ________________________________________

(a) Packaging shall be in accordance with Drawing 13008483, revision C, dated 19 DEC 2023.

(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.

(c) Marking shall be in accordance with Drawing 13008483, revision C, dated 19 DEC 2023. 2-D barcodes are required in accordance with Drawing 12999545, revision K, dated 06 MAY 2021.

(d) The following shall apply to Drawing 13008483, revision C, dated 19 DEC 2023:

(1) PERFORMANCE ORIENTED PACKAGING (POP): Prior to shipment, the manufacturer shall make sure the container has been tested by a Government-approved Performance Oriented Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the Government. The

POP test report shall be generated by the Manufacturer/Laboratory following the test. The report must be kept on file by the contractor and submitted as required by CDRL A016 (DI-PACK-81059C). For multiple year contracts, the contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.

(2) EXCEPTION TO POP MARKINGS: If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.

(3) POP VERIFICATION: In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease, and the procuring activity shall be contacted immediately.

(4) HEAT TREAT WOOD QUALITY MARKING: In accordance with the requirements of the International Standards for Phytosanitary Measures

(ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material

Enforcement Regulations (see URL: http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(5) MARKING: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.

(e) Palletization shall be in accordance with 19-48-4116/125B, revision 1, dated 01 JAN 2014. 19-48?4116, Revision 14, dated 01 December

2019, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with

ACV00561, revision H, dated 29 June 2022. Wood Packaging Material (WPM) shall be in accordance with ACV00831, revision A, dated 06 Oct

2022. 2-D barcodes are required.

*** END OF NARRATIVE D0001 ***

10 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2015; only design/development exclusions permitted

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E-4 MIL-STD-1916 ____________

The Department of Defense (DoD) Preferred Methods for this Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.

E-5 STATISTICAL PROCESS CONTROL ___________________________

Part I - General Statistical Process Control Requirements_________________________________________________________

(a) In addition to the quality requirements of the technical data package, the contractor shall implement Statistical Process Control

(SPC) in accordance with a Government-accepted SPC Program Plan. Control chart techniques shall be in accordance with the American

National Standards Institute (ANSI) B1, B2 and B3. Alternate SPC charting methods may be proposed and submitted to the Government for review.

(b) The SPC Program Plan developed by the contractor shall consist of a general plan and a detailed plan. The plans shall be structured as delineated on the Data Item Description referenced in the DD Form 1423. The general and the detailed plans shall be submitted to the

Government for review per DD Form 1423 requirements. Notification by the Government of acceptance or nonacceptance of the plans shall be provided in accordance with the timeframes specified on the DD Form 1423. Once a general plan for a facility has been approved by this

Command, the approval remains in effect for subsequent contracts as long as the contractual requirements remain substantially unchanged from contract to contract. Therefore, resubmission of a previously accepted general SPC plan is not required if current SPC contract requirements and Data Item Description (DID) requirements are fulfilled. If this Command has previously accepted the general SPC plan under essentially the same SPC contractual requirements, so indicate by providing the contracting officer with the following information:

Date of Acceptance ______________

Contract Number(s) ____________________________

(c) The contractor is responsible for updating the general plan to current SPC contractual requirements. If errors or omissions are encountered in a previously accepted SPC general plan, opportunities for improvement will be identified by the Government, and corrective action shall be accomplished by the contractor.

(d) A milestone schedule will be submitted for those facilities who do not have, or have never had, a fully implemented SPC program and will not have a fully operational SPC program once production is initiated. The milestones shall provide a time phased schedule of all efforts planned relative to implementation of an SPC program acceptable to the Government. A milestone schedule shall include implementation start and complete dates for those SPC subjects addressed in the Statistical Process Control requirement located in Part

II of this section. The milestone schedule shall only include those actions that cannot be accomplished prior to first article or the initiation of production, if a first article is not required. Milestones shall be developed for each commodity identified for SPC

11 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

application. Milestones shall be submitted through the Government Quality Assurance Representative to the contracting officer for review and acceptance. Any deviations from the accepted milestones, to include justification for such deviations, shall be resubmitted through the same channels for review. The Government reserves the right to disapprove any changes to the previously accepted milestones.

Notification by the Government of the acceptance or nonacceptance of the milestones shall be furnished to the contractor by the contracting officer.

(e) The contractor shall review all process and operation parameters for possible application of SPC techniques. This review shall include processes and operations under the control of the prime contractor and those under the control of subcontractor or vendor facilities. A written justification shall be included in the detailed plan for each process and operation parameter that controls or influences characteristics identified as critical, special, or major which have been deemed impractical for the application of SPC techniques. A pamphlet on application of SPC for short production runs is available through the contracting officer.

(f) Statistical evidence in the form of control charts shall be prepared and maintained for each process or operation parameter identified in the detailed plan. These charts shall identify all corrective actions taken on statistical signal. During production runs, control charts shall be maintained in such a manner to assure product is traceable to the control charts. At the conclusion of the production run, a collection of charts traceable to the product, shall be maintained for a minimum of 3 years. The control charts shall be provided to the Government for review at any time upon request.

(g) When the process or operation parameter under control has demonstrated both stability and capability, the contractor may request, in writing, through Administrative Contracting Officer (ACO) and Procuring Contracting Officer (PCO) channels to the Product Assurance and

Test Directorate, that acceptance inspection or testing performed in accordance with contract requirements be reduced or eliminated.

Upon approval by the CO, acceptance shall then be based upon the accepted SPC plan, procedures, practices and the control charts.

(h) The Government will not consider requests for reduction or elimination of 100% acceptance inspection and testing of if any one of the following conditions exist:

(1) The existing process currently utilizes a fully automated, cost effective, and sufficiently reliable method of 100% acceptance inspection or testing for an attribute-type critical parameter or characteristic.

(2) The contractor utilizes attribute SPC control chart methods for the critical parameter or characteristic.

(3) The critical parameter or characteristic is a first order, single point safety failure mode (nonconformance of the critical parameter or characteristic in and of itself would cause a catastrophic failure).

(i) The Government will only consider reduction or elimination of the 100% acceptance inspection or test requirement for other critical parameters or characteristics if either of the following conditions are met:

(1) The process is in a state of statistical control utilizing variable control chart methods for the critical parameter or characteristic under control and the process performance index (Cpk) is at least 2.0. The contractor shall maintain objective quality evidence through periodic audits that the process performance index is being maintained for each production delivery.

(2) The critical parameter or characteristic is conclusively shown to be completely controlled by one or more process or operation parameters earlier in the process, and those parameters are in a state of statistical control utilizing variable data, and the product of the probability of the conformance for each earlier parameter associated to the critical characteristic is better than or equal to a value equivalent to that provided by a Cpk of at least 2.0. The contractor shall maintain objective quality evidence through periodic audits that the process performance indexes are being maintained for each production delivery.

(j) For characteristics other than critical, requests for reduction or elimination of acceptance inspection and testing shall be considered when the process performance index is greater than or equal to a Cpk of 1.33 for variables data. Requests shall be considered for attributes data when the percent beyond the specification limits is less than or equal to .003 (Cpk=1.33).

(k) Process or operation parameters under reduced or eliminated inspection or testing that undergo a break in production less than 6 months in length, may continue to operate under reduced or eliminated inspection or testing provided there has been no degradation below a Cpk of 1.33 (2.0 for criticals). Any break in production greater than 6 months shall require resubmission of the request for reduction or elimination of inspection or testing through the same channels cited in paragraph (g) above.

(1) Not used.

(m) Immediately following a change to a process or operation parameter under reduced or eliminated inspection, the process capability

(Cp) or process performance indexes (Cpk) shall be recalculated and documented for variable data; the grand average fraction defective shall be recalculated for attribute data. If any of these values have deteriorated, immediate notification shall be made to the

Government along with the associated documentation. Return to original inspection and test requirements may be imposed as stipulated in paragraph (n) below.

12 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(n) The Government reserves the right to withdraw authorization to reduce or eliminate final acceptance inspection or testing and direct the contractor to return to original contract inspection or test procedures at any indication of loss of process control or deterioration of quality.

Part II - Detailed Requirements Pertaining to Plan Submittal____________________________________________________________

In accordance with DD Form 1423 and Part I of this section, the following supplemental information shall be considered and used when designing your general and detailed SPC plans.

1.0 General Management Plan: This section shall define management's SPC responsibilities and involvement and shall include management's commitment to continuous process improvement. The plan shall embrace a total commitment to quality and shall be capable of standing on its own merit.

1.1 Policy/Scope: Describe the contractor's policy for applying SPC, including goals and management commitment to SPC.

1.2 Applicable Document: List documents that are the basis for the contractor's SPC program (i.e., ANSI standard, textbooks, Government documents).

1.3 SPC Management Structure: Define the SPC management structure within the organization. Identify and include interrelationships of all departments involved in SPC (i.e., Production, Quality, Engineering, Purchasing, etc. Identify by job title or position all key personnel within departments involved in the application of SPC. Describe which functions are performed by key personnel and when these functions are performed (i.e., include personnel responsible for performing inspections/audits, charting and interpreting data;

personnel responsible for determining, initiating and implementing corrective action upon detecting assignable causes, etc.)

1.4 SPC Training: Identify by job title or position the primary individual responsible for overseeing that SPC training is accomplished.

Describe the qualification program required and in use for all personnel utilizing SPC techniques, including the qualification of trainers. Identify who is to be trained and the type, extent and length of such training (i.e., on-the-job, classroom, etc.). Identify when refresher training is required and how personnel using SPC techniques are monitored.

1.5 Manufacturing Controls: Identify the criteria for performing SPC gage capability studies and describe how and when these studies are applied. Repeatability and accuracy of gages should be addressed.

1.6 Determination of SPC Use: Describe how the process/operation parameters are determined appropriate for SPC application and explain what actions are taken if SPC is not deemed appropriate for critical, special and major process/operation parameters (i.e., Pareto analysis; analysis of characteristics with tight tolerances, etc.)

1.7 Process Stability and Capability:

(a) Identify the criteria for performing process capability studies and describe how and when these studies are applied. Describe how the process capability index is calculated and include the frequency of these calculations. Describe what actions are taken as a result of each process capability study. Describe the contractor's methodologies when process capability is for variable and attribute data. To determine a capable process, the process/operation parameters shall meet the following requirements:

(1) Variable Data. Process capability (Cp) shall be determined. Process performance index shall be greater than or equal to 1.33

(Cpk). For critical parameters/characteristics, the process performance index shall be greater than or equal to 2.0 (Cpk).

(2) Attribute Data: Process capability/performance shall be the percent beyond the upper/lower specification limit less than or equal to .003 percent (Cpk=1.33).

(b) Describe what actions will be taken if process/operation is sub-marginal or marginal. (Cpk less than 1.33 or 2.0 for criticals) or grand average fraction defective is greater than .003 percent).

(c) Include analysis of statistical distributions and define all formulas and symbology utilized.

1.8 Control Chart Policy:

(a) Type of charts to be used (i.e., x bar/R x bar/S, etc.) and rationale for use; the criteria for selection of sample size, frequency of sampling and rational subgroups.

(b) Procedures for establishing and updating control limits, including frequency of adjustments.

(c) Criteria for determining out-of-control conditions (i.e., trends, points beyond control limits, etc.) and the corrective action taken; to include failure analysis when the process is unstable or when nonconforming product has resulted from unstable processes.

Illustrate out-of-control tests.

13 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(d) Describe the method of recording pertinent facts on control charts such as changes in raw material, machines, manufacturing methods and environment, and corrective actions taken and describe how control charts are traceable to the product.

1.9 Vendor/Subcontractor Purchase Controls: Identify whether suppliers are required to utilize SPC and describe the extent the vendor's…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .