This synopsis/solicitation seeks proposals for a single award task order contract to provide demolition assessment services. The Bureau of Indian Affairs intends to award a $15 million contract to an Indian Small Business Economic Enterprise to conduct assessments of unsafe and uninhabitable buildings on Bureau of Indian Education campuses nationwide. The contract period is five years with firm fixed price task orders issued as needed. Task orders will cover approximately five sites with 120-day periods of performance to assess 150 buildings totaling 500,000 square feet annually. Proposals are due by July 11, 2023 and must include an SF-330 for the prime firm and any consultants along with descriptions of up to five relevant past projects. Selection criteria prioritize professional qualifications, specialized experience, past performance, local knowledge, and capacity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B12_RFIs___Answers_11_July_2023_3.pdf | ||
| Synopsis_Solicitation_1401623R0031_Attachment_2_SF330_2.pdf | ||
| Synopsis_Solicitation_1401623R0031_Attachment_1_SOW_2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLITION ASSESSMENT SERVICES SINGLE AWARD TASK ORDER CONTRACT
(SATOC)
Synopsis/Solicitation: 140A1623R0031
1. Contract Information: Indian Affairs has a requirement to acquire Architect-Engineer (A-E) Demolition Assessment Services for execution of its education mission through the Bureau of Indian Education (BIE). The central goal is to allow the Bureau to improve the overall safety of school campuses by relieving the sites of unsafe and uninhabitable buildings. Before disposal, a determination needs to be made as to the presence of hazardous materials and the potential environmental impacts associated with demolition or transfer of ownership to a tribal entity. This contract will provide demolition and disposal assessment services for Bureau of Indian Affairs/Bureau of Indian Education (BIA/BIE) sites nationwide facilities located across the Continental United States and Indian Country.
This A-E acquisition will be conducted in accordance with the Selection of Architects and Engineers statute (40 USC Chapter 11), and Federal Acquisition Regulation (FAR) Subpart 36.6. Under the Selection of Architects and Engineers statute, price competition is not allowed for A-E contracts.
In support of this effort, the Government intends to award one SATOC (Single Award Task Order Contract) to an Indian Small Business Economic Enterprise with $15 million in total contract capacity.
This announcement is open to all Indian Small Business Economic Enterprises. The ordering period for the contract will be five (5) years from the time of award. It is anticipated that the contract will be awarded no earlier than August 2023.
Task orders will be issued as the need arises during the contract ordering period. These task orders will be firm fixed-price type orders. There is no limit on the value of individual task orders (aside from the $15 million total capacity threshold). The Government generally anticipates awarding one or more task orders per year covering approximately five (5) sites with an expected 120-day period of performance from time of task order award. The estimated annual project capability will evaluate approximately 150 buildings totaling 500,000 square feet.
The attached Statement of Work (SOW) establishes the general work requirements. Each task order will include a more specific SOW. A Request for Price Proposal (RFPP) will be issued to the selected firm for each task order.
The NAICS Code for this procurement is 541330 -- Engineering Services, with a small business size standard of $25.5M.
Prospective contractors must be registered in the System for Award Management (SAM) database to be eligible for contract award. Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.sam.gov.
2. Project Information: Firms must be capable of providing assessment services, which includes but is not limited to, all services, materials, supplies, equipment, investigations, studies, and travel required for demolition and disposal assessments at various Bureau of Indian Affairs/Bureau of Indian Education (BIA/BIE) sites nationwide. The selected A/E firm will compile required information and deliver Assessment Documents for each location. The Assessment Documents shall provide the basis for evaluation of the hazardous building material abatement and demolition. Project assignments will typically require performance on-site and in an office setting.
3. Selection Criteria: Selection of the firm will be based on the following criteria, listed in descending order of importance. Criteria A through E will be evaluated for all offerors.
(A) Professional qualifications of a firm's staff and team consultants to be assigned to this contract.
Relevant building demolition and hazardous building material assessment work by key personnel will be considered. Additional consideration will be given for experience and qualifications of key personnel of the Prime or Joint Venture (JV) firms and for experience on projects included in Section F. This criterion is primarily concerned with the qualifications of the key personnel and not the number of personnel. The number of personnel is addressed under the capacity criterion below. Responding firms should demonstrate the professional qualifications of their staff in these key disciplines, which are listed in descending order of importance. Responding firms shall submit resumes for each of the following key disciplines: (1) Project Management; (2) Hazardous Building Material Assessment; (3) Environmental Assessment; (4) Civil/Structural Assessment; (5) Architectural Assessment; (6) Archaeological/Historical Assessment; (7) Electrical Engineering Assessment; (8) Mechanical Engineering Assessment. A maximum of two (2) resumes for Project Manager, and a maximum of one
(1) resumes for each of the other disciplines shall be submitted. The basis of the evaluation will be the information in Section E and Section F of the SF 330.
(B) Specialized experience and technical competence of the firm shall be demonstrated for building abatement and demolition assessment services. Structural condition assessment experience shall also be demonstrated along with experience evaluating environmental and historical/cultural impacts. Direct experience in these areas will be given more consideration than the management or oversight of other contractors (e.g. oversight of PRPs or subcontractors). Additional consideration will be given for experience and qualifications by the Prime or Joint Venture (JV) firms as the Prime/JV. The basis of the evaluation will be the information in Section F of the SF 330.
(C) Past performance on Indian Affairs and other contracts with respect to cost control, quality of work, management/business relations, and compliance with performance schedules. The Contractor Performance Assessment Reports System (CPARS) is the primary source of information on past performance. CPARS will be queried by the Government for all firms submitting an SF 330. No submittals are required by the offerors for this criterion. If deemed appropriate by the evaluation board, performance evaluations for any significant team subcontractors may also be considered. The board may seek information on past performance from other sources but is not required to seek other information on the past performance of a firm if none is available from CPARS. When evaluating past performances, the board will determine the relevancy of performance evaluations, and will place greater consideration on recent and relevant performance evaluations.
(D) Location in the general geographical area of the project and knowledge of the locality: The board will evaluate a Prime/JV firm's knowledge of and experience with building materials and construction methods typical to the geographic area and understanding of state/local/tribal and federal regulatory agencies. Work under this contract may be in a widely dispersed geographic area. Responding firms should demonstrate the extent of their capabilities to serve projects located throughout the Continental United States and Tribal Nations. Additional consideration will be given for knowledge and experience of the Prime or Joint Venture (JV) firms. The basis of the evaluation will be the information in Sections F and H of the SF 330.
(E) Capacity to accomplish the work in the required time: The board will consider available capacity of the key disciplines listed in Criteria B from the Prime/JV firm and its team consultants when evaluating the capacity of a firm to perform the work. The basis of the evaluation will be the information in Section H and Part II of the SF 330.
4. Submittal Requirements: Interested firms having the capabilities to perform this work must submit one (1) electronic copy with searchable Adobe PDF files of an SF 330 (08/2016 edition) for the prime firm that includes all team consultants. Include the firm's UEI number in the SF 330, Part I, Sections B and C. A maximum of five (5) projects for the proposed team, including joint ventures and teaming partners, shall be shown in Section F. For the five (5) projects submitted in Section F of the SF 330, a "project" is defined as work performed at one site or at a single installation. An indefinite delivery-indefinite quantity (IDIQ) contract is not a project. A project may contain multiple task orders or contracts if they are for multiple phases of a project at the same site or installation. Each project in Section F of the SF 330 shall include the contract number, task order number, cost of work performed by firm, and owner's contact information. Project descriptions shall clearly state extent of work performed by the team, percent of work completed, dates when work was performed, and date of contract completion. Project A/E work must be 100% complete for consideration.
The SF 330 shall have a total page limitation of forty (40) printed pages with Section H limited to eight
(8) pages, and Part II is excluded from the 40-page limit. For all SF 330 sections, use no smaller than 11-point font. Solicitation packages are not provided. This is not a request for proposal. No pricing information is to be included. Any pages that exceed the page limitations noted will not be evaluated, nor considered.
THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL
NO SOLICITATION PACKAGE WILL BE ISSUED via SAM. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR Part 36.606.
QUESTIONS: All questions regarding this synopsis must be submitted in writing no later than July 11, 2023, 3:00 PM (ET).
Primary POC email: Brandon Carroll, brandon.carroll@bia.gov Alternate POC email: Thomas Tortorella, thomas.tortorella@bia.gov
The following documents are considered Attachments to this Synopsis/Solicitation:
Attachment 1: Statement of Work (SOW) Attachment 2: SF-330
File details come from the government source that posted it. Updated .