B08_-_Statement_of_Work_Neal_Smith_NWR_Temporary_Modular_Office_Building_1.pdf

PDF 12 MB Posted

Attached to
IA - Temp Modular Office Space 36X56 ft
Solicitation number
140F0S26Q0051
Issued by

About this file

This is a Statement of Work (SOW) for the U.S. Fish and Wildlife Service (USFWS) requiring delivery and installation of a temporary modular office building at Neal Smith National Wildlife Refuge in Prairie City, Iowa.

The contractor must provide, deliver, install, modify, maintain, and remove a 36' × 56' modular office trailer with specified interior modifications, including two ADA-compliant restrooms, one kitchen with cabinets and sink, four 10' × 12' private offices, one 10' × 20' conference room, one 24' × 30' open workspace for cubicles, and one 5' × 8' secure closet with lockable door. An ADA-compliant access ramp is required. The contractor must also construct potable water and sanitary sewer laterals from existing systems and install electrical service from the existing main distribution panel, ensuring all utilities remain operational during winter freezing temperatures. The modular building must be fully operational and installed by October 1, 2026, with a 12-month base rental period beginning upon acceptance, with optional extension years available. Installation includes leveling, blocking, seaming, anchoring, hitch removal/storage, skirting installation, and debris handling. The contractor shall furnish all labor, equipment, materials, transportation, and supervision. Government acceptance requires verification that the unit meets all specifications, modifications match the provided drawings, ADA access is compliant, and the building is fully operational and clean. The contractor must maintain quality control throughout installation, modification, and removal activities, with any deficiencies corrected at contractor expense. Required deliverables include utility construction and installation schedules, floorplans and elevations for approval prior to shipment, delivery and installation reports, as-built modification records, and pickup/removal documentation at end of term.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Type of Service or Construction (NAICS)

Temporary Modular Office Building

PR Number:

Instructions: Complete all Bold Elements below and mark N/A for elements that are not applicable and delete sub elements. This will ensure that each element is considered.

1. General:

1.1 Describes the project in general terms: The U.S. Fish and Wildlife Service (USFWS) requires a temporary modular office building to support operations at the Neal Smith National Wildlife Refuge during the renovation of the existing Visitor Center and Headquarters building. The work includes providing, delivering, installing, modifying, maintaining, and removing an approximately 36' × 56' modular office trailer with specified interior modifications. It also includes constructing potable water and sanitary sewer laterals from existing systems and installing electrical service from the existing main distribution panel. Refer to the drawings for additional details.

1.2 Purpose/End Application: To provide temporary administrative office capacity for staff and operations during the Visitor Center Rehabilitation construction project.

1.3 Product: A shelter 36' × 56' modular unit with

specified modifications, ADA access components, electrical distribution, installation services, and site restoration requirements. Reference attached layout drawing.

1.4 Contractor Qualifications: The Contractor shall be qualified and experienced in the delivery, installation, modification, anchoring, ADA access installation, and removal of modular office buildings. The Contractor shall also be experienced in the installation of underground utilities. The Contractor must comply with all applicable federal, state, and local requirements

1.5 Other: N/A

2. Place of Performance and Period of Performance (Where and When)

2.1 Location: Neal Smith National Wildlife Refuge, 9981 Pacific Street, Prairie City, IA 50228. Refer to drawings for location on the refuge.

2.2 Performance start and end date: The temporary modular office building shall be installed and fully operational by October 1, 2026. The 12-month base rental period will begin once the building is fully operational and accepted, with optional extension years available.

2.3 Normal duty hours: 8:00 AM – 4:30 PM Monday through Friday.

2.4 Non-duty hours:

Evenings, weekends, and all Federal holidays.

3. Scope

3.1 The Contractor shall: Furnish all labor, equipment, materials, transportation, and supervision necessary to deliver, install, modify, maintain, and remove one modular office unit meeting the following specifications:

A 36' × 56' modular building in accordance with the attached basis of design drawings, including the following features:

o Restrooms: Two single user ADA compliant accessible restrooms.

o Kitchen: One kitchen including cabinets, sink/hot water, refrigerator space, water cooler accommodation, and counter receptacles.

o Private Offices: Four 10’-0” x 12’-0” private offices.

o Conference Room: One 10’-0” x 20’-0” conference room.

o Open Space: One 24’-0” x 30’-0” open workspace for cubicles.

o Secure Closet: One 5’-0” x 8’-0” closet with lockable door.

o ADA Access Ramp: Provide one ADA compliant access ramp for accessible entry and egress.

Utility Connections: Install all utilities in accordance with the drawings and connect the modular building to all utilities required for full operation, including (but not limited to) electrical service, potable water, and sanitary sewer.

o Note: All utilities shall be installed to remain fully operational during Winter freezing temperatures.

Installation: Perform installation including leveling, blocking, seaming, anchoring, hitch removal/storage, skirting installation, and debris handling.

Ensure all work complies with manufacturer specifications, safety requirements, and applicable codes.

Provide removal and site restoration services at end of rental period.

4. Deliverables and/or Delivery Schedule: (for extended list a quote schedule and/or use of line item detail on the PR is recommended)

4.1 Clearly state the deliverables required, the schedule for delivery, the quantities, schedule (for multiple items):

Delivery of modular building to Neal Smith National Wildlife Refuge.

Fully installed, properly anchored, leveled, and functional modular office meeting all specifications.

Completion documentation including installation report and confirmation of required modifications.

End-of-term removal, and cleanup.

4.2 Identify the type of documentation (printed and electronic-such as manuals) to be provided, as well as those quality indicators desired by the Government:

Utility construction and temporary modular office building installation schedule.

Temporary modular office building floorplan, elevations, and sample images for approval prior to shipment.

Delivery and installation reports.

As-built record of modifications.

Pickup/removal documentation at end of term.

5. Data Management Plan (DMP) for Science Data Agency Reference:

Not applicable. No new scientific data will be created.

6. Government-Furnished Equipment (GFE) / Government-Furnished Information (GFI):

Not applicable.

7. Evaluation and Acceptance

7.1 The contractor will be evaluated as detailed herein. Government acceptance is contingent upon:

[Either state generally or reference the table in 8.2 if used:

Past performance constructing underground utilities and providing temporary modular buildings.

The modular unit meets all required specifications.

Modifications match the provided drawing.

ADA access is compliant and properly installed.

The building is fully operational, clean, and ready for occupancy.

8. Quality Control/Quality Assurance:

8.1 For commercial supplies reference clauses for inspection and acceptance: N/A

8.2 Identify and detail measures for assessing quality control and acceptance; each requirement is unique and a table format is visually friendly and may be desirable:

Contractor shall maintain quality control of installation, modifications, and removal activities.

Government may inspect work at any stage to verify compliance.

Any deficiencies will be corrected at Contractor expense.

All dimensions are approximate and may not show support posts, electrical, plumbing, mechanical detail. All specs to be verified on factory drawings, Satellite is not responsible for incorrect details for space or project planning.

1" = 3/32"

1'

-9

1'

-9

11'-8"

16'-4 1/2"

30'-9 1/2"

11'-8"

1"

1"

11'-8" 11'-6"

6'-6 1/4"6'-6 1/4"

7' -1

/2

1"

Main Panels Per Floor Exterior Surface Mounted:

120/240 Volts-Single Phase A Floor = 150 amps B Floor = 125 amps D Floor = 125 amps

Green interior wall dimensions

TC

Frig

W C

Mod1: Kitchen – -3' cased opening – door on mateline won’t work well -Left Side: Upper lower cabinets sink w/hot water (7'-8')- leave 24" for trash can.

-Right Side: 4'-5' Base cabinet only with counter outlets. Space for 40" Frig, 18” water cooler with outlets.

-Outlet exterior door hallway side

Closet with light/ outlet Mod2: Closet with light and quad-dedicated outlet.

Mod3: 12' wall removal, close up interior door with matching wall

Timothy Fuller Text Box

BASIS OF DESIGN - TEMPORARY MODULAR OFFICE BUILDING

IOWA

DESCRIPTION

FISH AND WILDLIFE SERVICE

MIDWEST REGION NO.3

PROJECT DRAWING SET CODE:

File details come from the government source that posted it. Updated .