B08 - Specifications.pdf

PDF 503 KB Posted

Attached to
2 PREFABRICATED 40 FT BRIDGES
Solicitation number
140P6421Q0010
Issued by

View the file

Other files

File Type Posted
Sol_140P6421Q0010_Amd_0001.pdf PDF
B09 Solicitation Amendments_0001.pdf PDF
Sol_140P6421Q0010.pdf PDF
B08 - Price Schedule.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Apostle Islands National Lakeshore

Pre-Fabricated Bridge Specifications

NATIONAL PARK SERVICE

INTERIOR REGION 3,4,5

OHIO MAJOR ACQUISITION BUYING OFFICE

Specifications for 40’ Fiberglass Bridges

Provide like in kind or an “or equal” 35’ Fiberglass Bridge in accordance with the following specifications.

Specifications based on: Stockton trail bridge (See “Figure 1” located at the end of specifications).

This requirement is for supplies only.

Supplies include fiberglass bridge material, connectors, and railings, along with shipment to specified destination – this does not include wood decking or assembly construction.

Brand name or “or equal” requirement, must meet or exceed, based on the following specifications:

1.0 Scope

These specifications are for 2 (two) fully engineered clear span bridge made of Fiber reinforced

Polymer (FRP) composite construction and shall be regarded as the minimum standards for design and construction.

2.0 General Features of Design

2.1 Span

Bridge spans will be 40’ 0” each (straight line dimension) and shall be measured from each end of the bridge structure.

2.2 Width

Bridge widths shall be 3’ 0” each and shall be measured from the inside face of structural elements at deck level.

2.3 Bridge System Type

Bridges must be designed as a FRP Composite Truss Span.

2.4 Member Components

All members shall be fabricated from pultruded FRP composite profiles and structural shapes as required.

2.5 Camber

Bridges to be precambered to eliminate initial dead load deflection.

3.0 Engineering

Structural design of the bridges structure shall be performed by or under the direct supervision of a Licensed Professional Engineer (and include engineer stamp) and done in accordance with recognized engineering practices and principles.

3.1 Uniform Live Load

All bridge spans to be designed for 85 psi.

3.2 Vehicle Load

A specified vehicle configuration determined by the Operating Agency may be used for the design vehicle. If an Agency design vehicle is not specified, the loads conforming to the

AASHTO Standard H-5 Truck is used. A 4’x4’ wheel base is assumed. Wheel loads are distributed as 4 equal concentrated point loads unless otherwise specified. The maintenance vehicle live load shall not be placed in combination with the pedestrian live load. A vehicle impact allowance is not required.

3.3 Wind Load

All bridges shall be designed for a minimum wind load of 25 psf. The wind is calculated on the entire vertical surface of the bridge as if fully enclosed.

3.4 Snow Load

Sustained snow load conditions shall be evaluated for time dependent effects (creep and relaxation) and recovery behavior.

4.0 Materials

4.1 FRP Composites (Vendor Provided)

FRP bridges shall be fabricated from high-strength E-glass and isophthalic polyester resin unless otherwise specified. Weathering and ultraviolet light protection shall be provided by addition of a veil to the laminate construction.

4.2 Decking (PARK PROVIDED AND INSTALLED IN THE FIELD)

Wood decking is NO2 Southern Yellow Pine treated according to the American Wood preservers

Bureau. Standard 3 in. x 12 in. (normal) planks. See Figure 1.

4.3 Hardware (Vendor to Provide)

Bolted connections shall be A307 hot-dipped galvanized steel unless otherwise specified.

Mounting devices shall be galvanized of stainless steel.

5.0 Submittals

5.1 Submittal Drawings

Schematic drawings and diagrams shall be submitted to the park for review after receipt of contract award. As required, all drawings shall be signed and sealed by a licensed Professional

Engineer.

5.2 Additional Submittal

For bridges shipped in component parts or partially assembled, contractor shall provide assembly drawings and a recommended assembly procedure for building the bridge after receipt of contract award.

6.0 Fabrication/Tolerances

All cutting and drilling fabrication to be done by experienced fiberglass workers using carbide or diamond- tipped tooling to a tolerance of 1/16”. No material deviations beyond industry standards are accepted. All cut edges to be cleaned and sealed.

6.1 Profile Tolerances

Pultruded profiles shall be manufactured to the dimensional requirements as set forth in ASTM

D3917 and the visual requirements as set forth in ASTM D4385.

7.0 Railings

Railings should be a minimum of 42’ above the floor deck for pedestrian and bicycle use and should be a minimum of 54’ above the floor deck for equestrian use.

7.1 Safety Rails

Continuous horizontal safety rail 3’ channel shall be located on the inside of the trusses.

Maximum opening between the safety rails shall be available as required, but should not be greater than 4’.

8.0 Finishing

Bridge color shall be green which is a standard option (See Figure 1). No painting is required as the color is added during the manufacturing process.

9.0 Delivery Terms

Delivery will be FOB Destination.

9.1 Delivery Location

Materials must be delivered to the following location:

37705 Roy’s Point Blvd

Bayfield WI 54814

Delivery POC: Garyck Hoenig 715 209 2219

9.2 Delivery Schedule

Vendor must coordinate the with the listed Delivery POC with delivery schedule 1 (one) week prior to delivery.

Award and delivery to be made as ONE LOT of material with two identical prefabricated bridge packages. To be delivered within 90 days after contract is awarded.

NOTE: Deliveries will be made between 9:00am and 4:00pm. M-F

10.0 WARRANTY

Contractor shall warrant the structural integrity of all FRP materials, design and workmanship for 15 years.

1. Warranty shall not cover defects in the bridge caused by foundation failures, abuse, misuse, overloading, accident, faulty field assembly, or alteration, or other cause not the result of defective materials or workmanship.

2. Warranty shall be limited to the repair or replacement of structural defects and shall not include liability for consequential or incidental damages.

Figure 1 - Existing Bridge at Apostle Islands National Lakeshore

END OF SPECIFICATIONS

File details come from the government source that posted it. Updated .