B08 - Specifications.pdf
PDF 503 KB Posted
- Attached to
- 2 PREFABRICATED 40 FT BRIDGES
- Solicitation number
- 140P6421Q0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P6421Q0010_Amd_0001.pdf | ||
| B09 Solicitation Amendments_0001.pdf | ||
| Sol_140P6421Q0010.pdf | ||
| B08 - Price Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Apostle Islands National Lakeshore
Pre-Fabricated Bridge Specifications
NATIONAL PARK SERVICE
INTERIOR REGION 3,4,5
OHIO MAJOR ACQUISITION BUYING OFFICE
Specifications for 40’ Fiberglass Bridges
Provide like in kind or an “or equal” 35’ Fiberglass Bridge in accordance with the following specifications.
Specifications based on: Stockton trail bridge (See “Figure 1” located at the end of specifications).
This requirement is for supplies only.
Supplies include fiberglass bridge material, connectors, and railings, along with shipment to specified destination – this does not include wood decking or assembly construction.
Brand name or “or equal” requirement, must meet or exceed, based on the following specifications:
1.0 Scope
These specifications are for 2 (two) fully engineered clear span bridge made of Fiber reinforced
Polymer (FRP) composite construction and shall be regarded as the minimum standards for design and construction.
2.0 General Features of Design
2.1 Span
Bridge spans will be 40’ 0” each (straight line dimension) and shall be measured from each end of the bridge structure.
2.2 Width
Bridge widths shall be 3’ 0” each and shall be measured from the inside face of structural elements at deck level.
2.3 Bridge System Type
Bridges must be designed as a FRP Composite Truss Span.
2.4 Member Components
All members shall be fabricated from pultruded FRP composite profiles and structural shapes as required.
2.5 Camber
Bridges to be precambered to eliminate initial dead load deflection.
3.0 Engineering
Structural design of the bridges structure shall be performed by or under the direct supervision of a Licensed Professional Engineer (and include engineer stamp) and done in accordance with recognized engineering practices and principles.
3.1 Uniform Live Load
All bridge spans to be designed for 85 psi.
3.2 Vehicle Load
A specified vehicle configuration determined by the Operating Agency may be used for the design vehicle. If an Agency design vehicle is not specified, the loads conforming to the
AASHTO Standard H-5 Truck is used. A 4’x4’ wheel base is assumed. Wheel loads are distributed as 4 equal concentrated point loads unless otherwise specified. The maintenance vehicle live load shall not be placed in combination with the pedestrian live load. A vehicle impact allowance is not required.
3.3 Wind Load
All bridges shall be designed for a minimum wind load of 25 psf. The wind is calculated on the entire vertical surface of the bridge as if fully enclosed.
3.4 Snow Load
Sustained snow load conditions shall be evaluated for time dependent effects (creep and relaxation) and recovery behavior.
4.0 Materials
4.1 FRP Composites (Vendor Provided)
FRP bridges shall be fabricated from high-strength E-glass and isophthalic polyester resin unless otherwise specified. Weathering and ultraviolet light protection shall be provided by addition of a veil to the laminate construction.
4.2 Decking (PARK PROVIDED AND INSTALLED IN THE FIELD)
Wood decking is NO2 Southern Yellow Pine treated according to the American Wood preservers
Bureau. Standard 3 in. x 12 in. (normal) planks. See Figure 1.
4.3 Hardware (Vendor to Provide)
Bolted connections shall be A307 hot-dipped galvanized steel unless otherwise specified.
Mounting devices shall be galvanized of stainless steel.
5.0 Submittals
5.1 Submittal Drawings
Schematic drawings and diagrams shall be submitted to the park for review after receipt of contract award. As required, all drawings shall be signed and sealed by a licensed Professional
Engineer.
5.2 Additional Submittal
For bridges shipped in component parts or partially assembled, contractor shall provide assembly drawings and a recommended assembly procedure for building the bridge after receipt of contract award.
6.0 Fabrication/Tolerances
All cutting and drilling fabrication to be done by experienced fiberglass workers using carbide or diamond- tipped tooling to a tolerance of 1/16”. No material deviations beyond industry standards are accepted. All cut edges to be cleaned and sealed.
6.1 Profile Tolerances
Pultruded profiles shall be manufactured to the dimensional requirements as set forth in ASTM
D3917 and the visual requirements as set forth in ASTM D4385.
7.0 Railings
Railings should be a minimum of 42’ above the floor deck for pedestrian and bicycle use and should be a minimum of 54’ above the floor deck for equestrian use.
7.1 Safety Rails
Continuous horizontal safety rail 3’ channel shall be located on the inside of the trusses.
Maximum opening between the safety rails shall be available as required, but should not be greater than 4’.
8.0 Finishing
Bridge color shall be green which is a standard option (See Figure 1). No painting is required as the color is added during the manufacturing process.
9.0 Delivery Terms
Delivery will be FOB Destination.
9.1 Delivery Location
Materials must be delivered to the following location:
37705 Roy’s Point Blvd
Bayfield WI 54814
Delivery POC: Garyck Hoenig 715 209 2219
9.2 Delivery Schedule
Vendor must coordinate the with the listed Delivery POC with delivery schedule 1 (one) week prior to delivery.
Award and delivery to be made as ONE LOT of material with two identical prefabricated bridge packages. To be delivered within 90 days after contract is awarded.
NOTE: Deliveries will be made between 9:00am and 4:00pm. M-F
10.0 WARRANTY
Contractor shall warrant the structural integrity of all FRP materials, design and workmanship for 15 years.
1. Warranty shall not cover defects in the bridge caused by foundation failures, abuse, misuse, overloading, accident, faulty field assembly, or alteration, or other cause not the result of defective materials or workmanship.
2. Warranty shall be limited to the repair or replacement of structural defects and shall not include liability for consequential or incidental damages.
Figure 1 - Existing Bridge at Apostle Islands National Lakeshore
END OF SPECIFICATIONS