B08_SOW__Neal_Smith_NWR_Asphalt_140FC223Q0052.pdf

PDF 210 KB Posted

Attached to
IA NEAL SMITH NWR ASPHALT CRACK REPAIR
Solicitation number
140FC223Q0052
Issued by

About this file

This statement of work outlines requirements for asphalt crack repair services at the Neal Smith National Wildlife Refuge. The project involves sealing hairline cracks and filling cracks larger than 1/4 inch with hot pour rubber on approximately 4.7 miles of entrance road and 3,140 square feet of visitor center parking lot. Work must be performed between August 10 and October 31, 2023 under the supervision of the refuge manager, during normal duty hours of Monday through Friday 8am to 4:30pm. Contractors must be licensed and bonded and adhere to Iowa Department of Transportation specifications for road crack sealing and striping. The related federal contract opportunity is solicitation number 140FC223Q0052 for asphalt crack repair at the Neal Smith National Wildlife Refuge, issued by the U.S. Fish and Wildlife Service.

View the file

Other files

File Type Posted
Sol_140FC223Q0052.pdf PDF
B03_WD_Davis-Bacon_Act_WD___IA20230081_140FC223Q0052.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

NAICS Code 237310 – Highway, Street, and Bridge Construction

Entrance Road and Parking Lot Repair Work

PR Number: 40634923

Instructions: Complete all Bold Elements below and mark N/A for elements that are not applicable and delete sub elements. This will ensure that each element is considered.

1. General:

1.1 Project

Neal Smith National Wildlife Refuge (9981 Pacific St, Prairie City, IA 50228) needs to have the entrance road and Visitor Center parking lot cracks filled with tar to prevent further damage to the asphalt.

1.2 Purpose/End Application:

The Neal Smith NWR entrance road and parking lot were built in 2015. In 2021, a contract was issued to have the hairline cracks “sealed” with tar and road markings repainted. More cracks have developed and the “sealed” cracks need to be redone.

1.3 Contractor Qualifications: Contractor will be licensed and bonded and will adhere to IA DOT specifications on road crack sealing and lane striping.

2. Place of Performance and Period of Performance

2.1 Neal Smith National Wildlife Refuge

9981 Pacific St. Prairie City, IA 50228-0399 515-994-3400

2.2 Performance start and end date.

09/10/2023 – 10/31/2023

2.3 Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m.

2.4 Non-duty hours include weeknights, weekends, and Government holidays (Independence Day) will need to be coordinated with the refuge for approval.

3. Scope

3.1 Entrance Road

Approximately 4.7 miles of entrance road needs to have linear cracks sealed. Proper preparation of the area to include but is not limited to cleaning, sweeping, and degreasing, ensuring cracks and holes are void of any obstructions before filling.

Existing cracks should be routed, cut out and existing sealants removed. Traffic safety control will be provided by contractor and coordinated with refuge staff.

Seal hairline cracks with hot pour rubber (crack filler) per IA DOT specifications.

Blow out cracks larger than ¼” with compressed air and fill with black hot pour rubber.

Parking Lot Approximately 3,140’ of area to seal. Seal hairline cracks with hot pour rubber – same as entrance road specs. Blow out cracks larger than ¼” with compressed air and fill with black hot pour rubber. Traffic safety control will be provided by contractor and coordinated with refuge staff. Lot areas shall be blocked off while work is being performed to assure no damage to lot parked vehicles.

Weather Conditions

• Sealer should not be applied unless pavement temperature is at least 50F° and the air temperature is 50F° and rising.

• Sealer should not be applied during rainy or wet weather, or when rain is anticipated within eight hours after application is completed.

7. Evaluation and Acceptance

7.1 Government acceptance is contingent upon satisfactory completion of work.

8. Quality Control/Quality Assurance:

The Contracting Officer Representative will monitor, and record work completed and send reports to the Contracting Officer. Traffic safety measures will be coordinated with Technical Coordinator, Scott Gilje.

9. Technical Coordinator:

9.1 Scott Gilje

Refuge Manager, Neal Smith NWR 9981 Pacific St., Prairie City, IA 50228 515-994-3400

STATEMENT OF WORK
1. General:
2. Place of Performance and Period of Performance
2.1 Neal Smith National Wildlife Refuge
9981 Pacific St. Prairie City, IA 50228-0399
515-994-3400
2.2 Performance start and end date.
08/10/2023 – 10/31/2023
2.3 Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m.
2.4 Non-duty hours include weeknights, weekends, and Government holidays (Independence Day) will need to be coordinated with the refuge for approval.
3. Scope

File details come from the government source that posted it. Updated .