B08_-_SOW.pdf

PDF 104 KB Posted

Attached to
DE- BOMBAY HOOK NWR-CDC DUMPSTER-URGENT Federal contract opportunity
Solicitation number
140FS324Q0068
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document provides details for a federal solicitation from the Department of the Interior Fish and Wildlife Service seeking dumpster services at Bombay Hook National Wildlife Refuge. Specifically, the solicitation with number 140FS324Q0068 is for urgent dumpster services at the Bombay Hook National Wildlife Refuge Center in Delaware. Interested parties should review the attached Statement of Work document for requirements regarding delivery, servicing, and removal of dumpsters on an as-needed basis. The solicitation is open with no defined response or award dates provided in this summary document. The service is required for the Bombay Hook National Wildlife Refuge Center.

View the file

Other files for this federal contract opportunity

Other files attached to DE- BOMBAY HOOK NWR-CDC DUMPSTER-URGENT, newest first.
File Type Posted
B08_-_Calculations_Redacted.pdf PDF
Sol_140FS324Q0068.pdf PDF
B08_-_Quote_Schedule.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

DUMPSTER RENTAL AND DISPOSAL FOR

Bombay Hook NWR

2591 Whitehall Neck Rd, Smyrna, DE 19977

PART A – GENERAL INFORMATION AND INSTRUCTIONS

GENERAL DESCRIPTION OF WORK: Provide dumpsters to aid in the disposal of demolition debris from a single structure at the address listed above. The dumpsters will be provided for two different types of material to be separated by refuge staff. The two types of material are; concrete (metal reinforcement not removed ie, clean concrete) and general demolition debris. The structures have been tested and no known hazardous materials were located.

PART B – PERFORMANCE REQUIREMENTS

Dumpsters by material type:

General Demolition Debris (30 yds dumpsters) Concrete Material (30 yds dumpsters – half full due to weight)

Pricing provided based on the following for Clean Concrete:

1. Initial Delivery Fee (if applicable)

2. Per Haul Fee (Fee to include full removal and empty return – ie. swap out)

3. Per Ton Disposal Fee

Pricing provided based on the following for General Construction Debris Materials:

1. Initial Delivery Fee (if applicable)

2. Per Haul Fee (Fee to include full removal and empty return – ie. swap out)

3. Per Ton Disposal Fee

Dumpsters will be provided on an as needed basis, with no less than three dumpster per material type (if needed) on the site(s) at one time. Pricing will include all fees and charges associated with dumpster handling -

ie. hauling, disposal, permitting (if necessary), etc. The expectation is that all dumpsters necessary to complete the project will be coordinated and completed from March 25, 2024 to May 25, 2024. The expectation is that the removal tasks will be completed during a two week phase within this operational window. The awarded vendor will be responsible for swapping up to 8 cans per day during select phases with possible no work periods due to operational needs or weather.

The material types (concrete or construction debris) are subject to change based on site needs.

Coordination of deliveries and pickup will be done through refuge staff while the job is being completed.

General refuge hours are 7AM – 4PM Monday – Friday. The demolition task is expected to take two weeks or less.

PART C – OTHER PERFORMANCE REQUIREMENTS AND INFORMATION

DOCUMENTATION AND REPORTING: A written ticket will be provided to refuge staff as dumpsters arrive and exit to ensure load counts are accurate. The weights for disposal for general debris will not be known at the time of departure; however, refuge staff will be notified within 24 hours of disposal weights. Sorted materials will be recycled to the maximum extent possible to divert as much waste from landfills. All local and state transportation regulations apply. All materials are considered property of the contract upon pickup.

CONTACT INFORMATION: Possible contractors are encouraged to contact David Miller, GAOA Project Coordinator at 973-417-9550 or David_j_miller@fws.gov for additional information or site specific requirements.

mailto:David_j_miller@fws.gov

File details come from the government source that posted it. Updated .