B08_Solicitation_Scope_of_Work_LAVO_Glulam_Bridge.pdf

PDF 66 KB Posted

Attached to
SUPPLY AND DELIVER GLULAM BRIDGE, Lassen Volcanic
Solicitation number
140P8425Q0027
Issued by

About this file

This document is a Scope of Work (SOW) for Lassen Volcanic National Park, Solicitation #140P8425Q0027, seeking the supply and delivery of a pre-engineered three-stringer glulam bridge package. The specific requirements include a 36-foot long by 5-foot wide bridge designed to support a 600-pound per square foot snow load, to be delivered to the park's Mineral Headquarters in California. The bridge will replace a previously failed Channel Iron steel bridge damaged during the 2021 Dixie Fire and will be used to restore visitor access to the Devils Kitchen Geothermal Area.

Key specifications mandate that the bridge must be untreated due to the area's wilderness designation, with NPS procuring all additional hardware, decking, and handrailing. Delivery is restricted to Monday through Friday, 7:00 AM to 5:00 PM, excluding holidays. The National Park Service will provide a forklift and operator for offloading. This acquisition is a Total Small Business Set-Aside with a North American Industry Classification System (NAICS) Code of 321999, targeting businesses with 500 or fewer employees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Solicitation # 140P8425Q0027

Lassen Volcanic National Park

Supply and Deliver One (1) - 3-Stringer Glulam Bridge and Blocking for

Devils Kitchen Geothermal Area

PMIS # 345519

Background / Introduction:

Lassen Volcanic National Park is seeking a vendor / manufacturer who can fabricate / supply and deliver one (1) - three stringer Glu-Lam Bridge package with blocking meeting load calculated specifications provided under “Scope”. Bridge must be constructed to support a 600-pound per square foot snow load. This contract is for the fabrication and delivery of the bridge specified under scope. NPS shall provide a forklift and operator to offload the bridge package.

This bridge will replace an existing non-engineered and failed Channel Iron steel stringer bridge which was compromised during the 2021 Dixie Fire. Replacement will eliminate existing public safety concerns and allow the park to reopen the area that has been closed since this fire.

Scope:

Lassen Volcanic National Park (LAVO) is seeking a cost proposal for the manufacturing, supply, and delivery of one (1) pre-engineered three-stringer glulam bridge package. Bridge must be 36 feet in length and also provided with blocking necessary to structurally assemble and affix the package together. Bridge must be manufactured at 36 feet in length x five (5) feet in width. This bridge package will be manually imported to the Parks Devils Kitchen Geothermal Area and placed to span the areas Hot Springs Creek that will then provide safe visitor access. Because of the areas wilderness designation, the bridge must NOT be chemically treated. No hardware or fasteners are needed with this bridge: NPS will procure all necessary hardware, decking and handrailing necessary to assemble the bridge on site.

Delivery Instructions:

Bridge package must be delivered to:

Lassen Volcanic Nation Park Mineral Headquarters

Historic District Maintenance Yard, which is located 42 miles east of Red Bluff California at 38050

Hwy 36E Mineral California 96063.

Delivery will be accepted Monday through Friday 7:00 AM to 5:00 PM excepting Holidays.