B08_Solicitation_(Attch_1_SOW).docx
DOCX document 39 KB Posted
- Attached to
- DEER CENSUS FOR NER PARKS
- Solicitation number
- 140PS125Q0002
About this file
This is a Statement of Work (SOW) for white-tailed deer census services at eight National Park Service (NPS) Northeast Region park units. The contractor must conduct total deer counts at Flight 93 National Memorial, Fort Necessity National Battlefield, Friendship Hill National Historic Site, Hopewell Furnace National Historic Site, Morristown National Historical Park, Saint-Gaudens National Historical Park, Saratoga National Historical Park, and Weir Farm National Historical Park.
The work involves conducting single-night winter deer censuses in 2025 at all eight parks, with three parks requiring a second census using different methodology to measure variability. The contractor must provide all personnel, equipment, and services needed, process the census data by land cover types, and deliver a summary report with methodology, results, and analysis. Optional census years from 2026-2029 may be added for 0-8 parks, subject to funding availability. Key requirements include obtaining necessary permits and clearances, submitting a Project Safety Plan, and delivering raw and processed data with FGDC-compliant metadata within 30 workdays of fieldwork completion. The census data will support deer management and forest restoration planning, as overabundant deer populations are contributing to forest regeneration decline in these parks.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140PS125Q0002_Amd_0001.pdf | ||
| B08_Solicitation_(Attch_6_QA_Document)_0001.docx | DOCX document | |
| B08_Solicitation_(Attch_5_PPQ).doc | DOC document | |
| Sol_140PS125Q0002.pdf | ||
| B08_Solicitation_(Attch_3_Limitations_on_Subcontracting_Report).xlsx | XLSX spreadsheet | |
| B08_Solicitation_(Attch_4_TQ_-_Service).docx | DOCX document | |
| B08_Solicitation_(Attch_2_Wage_Det_(2015-4143_Rev_28))_-_Copy.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Multi-year, Multi-park White-tailed Deer (Odocoileus virginianus) Censuses for National Park Service Northeast Region Park Units
EXTENT: The service provider shall perform the work described herein for the Natural Resources Division, Resource Stewardship and Science Directorate of the Northeast Region (NER) of the National Park Service (NPS) and the individual NPS park units identified in this scope of work (hereafter, SOW) and listed in Table 1.
SCIENTIFIC INTEGRITY: Scientific integrity is vital to Department of Interior (DOI) activities under which scientific research, data, summaries, synthesis, interpretations, presentations, and/or publications are developed and used. Failure to uphold the highest degree of scientific integrity will result not only in potentially flawed scientific results, interpretations, and applications but will damage DOI’s reputation and ability to uphold public trust. All work performed must comply with the DOI Scientific Integrity Policy posted to http://doi.gov, or its equivalent as provided by the service provider or State law.
PERFORMANCE PERIOD: The performance of the white-tailed deer censuses described in this SOW shall be done in the winter season of 2025, and additional option years (2026-2029) dependent upon funding.
PROJECT IDENTIFICATION: The work in this SOW shall consist of the services described below for the referenced project. In all related documents, the project shall be referred to as Multi-year, Multi-park Deer Censuses for NPS – NERO Park Units.
Reference number to be used on all project documents:
1.0 Introduction
The Resource Stewardship and Science Division of the NPS Northeast Region (NER) needs to obtain total counts of white-tailed deer at eight (8) NER park units in 2025 as part of the essential data needed to effectively develop and implement native forest restoration plans. The park units are Flight 93 National Memorial (FLNI), Fort Necessity National Battlefield (FONE), Friendship Hill National Historic Site (FRHI), Hopewell Furnace National Historic Site (HOFU), Morristown National Historical Park (MORR), Saint-Gaudens National Historical Park (SAGA), Saratoga National Historical Park (SARA), and Weir Farm National Historical Park (WEFA). FLNI, FONE, FRHI, and HOFU are in Pennsylvania, MORR is in New Jersey, SAGA is in New Hampshire, SARA is in New York, and WEFA is in Connecticut. The potential exists for additional census years (2026-2029) in 0 to 8 parks, subject to the availability of funds. Overabundant deer have been shown to be one of the main factors responsible for the decline in forest regeneration in these park units (Miller et al. 2023), resulting in a regeneration debt that must be addressed and reversed through targeted adaptive management actions. All park units are in Imminent Failure, Probable Failure, or Insecure regeneration status categories. Efficient and reliable total deer counts are required to establish baseline deer population densities in these park units, determine whether population control actions are justified, and adjust any actions if needed over time.
2.0 Purpose
Rapid yet accurate deer counts for each park unit are needed to support planning for deer management and native forest restoration. Fieldwork to obtain the deer counts will need to be completed in a single night at each park unit.
3.0 Scope of Work
The deer censusing work will include:
| 3.1 | Preparatory planning, pre-survey reconnaissance, and censuses of the entirety of each | |
| park to obtain rapid and accurate deer counts over the course of a single night in | winter of 2025 at each park unit identified in this SOW (Table 1). For three parks a |
second census will be conducted over the same time period using a different census design to provide a measure of variability and detection probability in the counts.
3.2 Processing of data obtained from fieldwork to produce deer counts for each park unit area and a suitable buffer zone around each unit boundary, subdivided by National Land Cover Database 2021 (Dewitz 2023) land cover types, using methodologies agreed upon with NPS-NERO and each park unit’s natural resources staff.
3.3 Summary Report: Abstract, Introduction, Materials and Methods, Data Processing and Analysis, Results, and Discussion.
3.4 Data Delivery.
4.0 Project Requirements
| 4.1 | The contractor shall comply with National Defense Authorization Act 2024 | requirements. |
| 4.2 | The contractor shall secure all required clearances and permits before starting | fieldwork. |
| 4.3 | The contractor will work within all local, State, and Federal laws. | |
| 4.4 | The contractor shall submit a copy of their licensing certificates. | |
| 4.5 | Personnel, equipment, transportation, travel and services needed for tasks described in this SOW will be provided by the contractor. | |
| 4.6 | The contractor will conduct research and documentation activities needed for tasks |
described in this SOW.
| 4.7 | All work must be technically accurate and must meet accepted professional guidelines as well as national, regional and local policy requirements and regulations. |
| 4.8 | The contractor will work with the POCs to establish census standards for the tasks in this SOW. |
| 4.9 | All consultation with State Historic Preservation Offices and Tribal Historic Preservation Offices, if needed, is the responsibility of the NPS, not the contractor. |
| 4.10 | All related documents must refer to the project as Multi-year, Multi-park Deer Censuses for NPS – NERO Park Units |
| 4.11 | The contractor shall submit a Project Safety Plan (PSP) for acknowledgement and |
approval by each park unit’s Superintendent.
4.12 The contractor shall obtain a NPS Scientific Research and Collection Permit prior to conducting field work through the Research Permit and Reporting System (https://www.nps.gov/subjects/science/research-permit.htm)
5.0 Deliverables
| 5.1 | Reliable censuses (total counts) of deer in all park units obtained over the course of a single night in each of the survey years |
| 5.2 | Raw and processed data, imagery, maps |
| 5.3 | Summary report to NPS-NERO that will include: |
5.3.1 Description of survey equipment, sensors used and methodology for fieldwork, including methods used to distinguish deer from other animals with certainty.
5.3.2 Data processing methodology
5.3.3 Results and Discussion of findings
5.3.4 Maps and imagery including mapped coverage for each park unit
5.3.5 A spreadsheet documenting all data for delivery including column headers: File Name, File Type (e.g., .pdf, .jpg, geo-tif), Data Type, Data Type product
| 5.4 | Submission of an Investigator Annual Report via the NPS Research Permit and Reporting System | upon completion of the work. |
| 5.5 | Data Delivery: Project raw and processed data deliverables, including FGDC-compliant metadata, will be transferred to NPS-NERO, either via electronic file transfer or on an external hard drive. |
6.0 General
| 6.1 | All fieldwork scheduling and project logistics within each park unit boundary and suitable buffer | zone must be coordinated with NPS personnel designated by each park unit’s Superintendent. |
| 6.2 | Fieldwork for all censuses will occur in the winter season of 2025 for each park unit, and in | additional years (2026-2029) for 0-8 park units dependent upon availability of funding. |
| 6.3 | The National Park Service has royalty-free, irrevocable, and non-exclusive license to field notes, |
raw data, images, manuscripts, and reports for non-profit NPS uses, including educational, archival, and research uses. These materials may be used, reproduced and displayed for these purposes in any and all media including, but not limited to, the World Wide Web, with proper accreditation.
7.0 Performance Period
7.1 The contractor shall submit all draft work products to the NPS within 30 workdays of the conclusion of field work. The NPS will have 30 workdays to submit comments on draft materials.
7.2 The contractor shall submit final work products to the NPS within 30 workdays of return of comments.
8.0 Contacts
Norm Bourg, Ph.D.
Biologist – Resilient Forests Program Manager Interior Region 1 North Atlantic - Appalachian National Park Service 1100 Ohio Drive SW Washington, DC 20242 Tel.: 202-961-8936 (work mobile)
Brian Mitchell, Ph.D.
Research Coordinator/Science Advisor North Atlantic Coast Cooperative Ecosystem Studies Unit National Park Service 128 Coastal Institute 218 South Ferry Road, URI Bay Campus Narragansett, RI 02882 401-318-5165
Jim Comiskey, Ph.D.
Program Manager Interior Region 1 North Atlantic - Appalachian Inventory and Monitoring Division National Park Service 120 Chatham Lane Fredericksburg, VA 22405 540-693-3124 (Tel.)
703-258-2145 (Cell)
References:
Dewitz, J., 2023. National Land Cover Database (NLCD) 2021 Products: U.S. Geological Survey data release. https://doi.org/10.5066/P9JZ7AO3.
Miller, K.M., Perles, S.J., Schmit, J.P., Matthews, E.R., Weed, A.S., Comiskey, J.A., Marshall, M.R., Nelson, P. and Fisichelli, N.A. 2023. Overabundant deer and invasive plants drive widespread regeneration debt in eastern United States national parks. Ecological Applications 33(4), p.e2837.
Table 1. NPS-NERO park units requiring deer censuses in the winter of 2025 with option years for 2026 through 2029.
| NPS Park Unit |
| Total Area (ha) |
| Forest Area (ha) |
| Censuses Year 1 |
| Censuses Years 2-5 |
| FLNI |
| 938 |
| 511 |
| 1 |
| 1 |
| FONE |
| 370 |
| 267 |
| 2 |
| 1 |
| FRHI |
| 272 |
| 218 |
| 1 |
| 1 |
| HOFU |
| 343 |
| 270 |
| 1 |
| 1 |
| MORR |
| 676 |
| 626 |
| 2 |
| 1 |
| SAGA |
| 80 |
| 48 |
| 2 |
| 1 |
| SARA |
| 1156 |
| 687 |
| 1 |
| 1 |
| WEFA |
| 28 |
| 18 |
| 1 |
| 1 |
File details come from the government source that posted it. Updated .