B08_Solicitation_-_Attachment_2_-_Technical_Questionnaire.docx
DOCX document 22 KB Posted
- Attached to
- SLBE - Exterior Painting of 12 Structures 36690
- Solicitation number
- 140P6022R0009
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONNAIRE
Exterior Painting of 12 Structures
Sleeping Bear Dunes National Lakeshore
OFFEROR:
SOLICITATION #:
DATE:
PLEASE NOTE: IN ADDITION TO PRICING PROVIDED ON THE BID/PRICE SCHEDULE, YOUR RESPONSES ON THIS QUESTIONNAIRE (AND YOUR RESPONSES ON THE PAST PERFORMANCE QUESTIONNAIRE) ARE CRITICAL TO THE SELECTION OFFICIAL WHEN EVALUATING A PROPOSAL FOR AWARD. INADEQUATE OR VAGUE RESPONSES MAY RESULT IN A LOWER RATING (PLEASE SEE SECTION M OF THE SOLICITATION FOR EVALUATION INFORMATION). YOU MAY USE ADDITIONAL PAGES FOR YOUR RESPONSES, IF NEEDED.
SUBFACTOR #1 – Technical Approach
Technical approach is your means and methods to complete the technical aspect of required work in exterior painting as described in the project specifications. Submit a written narrative limited to 5 pages describing your technical approach to the specific aspects below. Additional pages will not be evaluated. Pictures can be included and will not be counted towards the page limitation.
· Approach to Critical Contract Requirements: Describe your approach to successfully accomplish exterior painting in accordance with requirements outlined in the Project Specifications and Drawings within proposed contract performance period and budget.
Technical approaches that comply with applicable contract requirements; are realistic, appropriate, efficient; and demonstrate clear logic and scope understanding present lower levels of risk and will be more favorably rated. Approaches not demonstrating these attributes present higher levels of risk and will be less favorably rated.
SUBFACTOR #2 – Project Experience
Submit "Project Experience" addressing specific experience working in exterior painting in the below section/box, preferably a minimum of 3 and/or a maximum of 5, relevant projects completed in the last 10 years.
NOTE: Submit the same projects for Past Performance as submitted under this factor.
SUBFACTOR #3 – Key Personnel
Submit resumes for key personnel as identified below with experience in exterior painting. All personnel proposed are subject to substitution requirements contained in this solicitation.
· Project Manager
· Superintendent
· Construction Management (field staff)
· On-Site Quality Control Specialist
· On-Site Safety Specialist/Manager
Key Personnel experience demonstrating (1) capability in same or similar key personnel positions on successful relevant projects of similar scope and magnitude to this solicitation; (2) strong technical knowledge and skill required for this solicitation; and (3) effective organization present lower levels of risk and will be more favorably rated. Those not demonstrating these attributes present higher levels of risk and will be less favorably rated.
File details come from the government source that posted it. Updated .