This document is a detailed set of architectural and engineering drawings for the Homestead National Historical Park's Geothermal HVAC replacement project located at 8523 NE-4 in Beatrice, NE. The drawing set includes comprehensive mechanical and electrical plans for the Education Center, covering demolition, floor plans, piping layouts, and equipment specifications across multiple sheets (M001-M401 for mechanical systems and E001-E601 for electrical systems). The project involves replacing the existing HVAC system with a geothermal solution, with specific attention to the Education Center Building No. 1, and includes a designated staging area limited to 5 parking stalls and a 15'x30' turf and aggregate camper pad. The drawings are dated 12/23/2024 and prepared by Schemmer, an architectural and engineering firm located in Omaha, NE, with project number 009258.003 and PMIS number 368.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question_-_Answer_doc_0001.docx | DOCX document | |
| B11_Site_Visit_Attendance_0001.pdf | ||
| Sol_140P6025B0003_Amd_0001.pdf | ||
| B08_Solicitation_-_Attachment_5_-_Submittal_List.pdf | ||
| Sol_140P6025B0003.pdf | ||
| B08_Solicitation_-_Attachment_3_-_Wage_Determination.pdf | ||
| B08_Solicitation_-_Attachment_4_-_Limitations_on_Subcontracting.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_Attachment_1_-_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PATIO
S
ID
E W A
LK
SIDEWALK
EDUCATION CENTER
BLDG NO. 1
U T
IL
IT
Y
B
LD
G
N O
R E S
ID
E N C E
B
LD
G
N O
R E S
ID
E N C E
B
LD
G
N O
CABIN
LOCATION OF WORK
STAGING AREA:
LIMIT OF 5 PARKING STALLS AND 15'X30' TURF AND
AGGREGATE CAMPER PAD
EDUCATION CENTER
BLDG NO. 1
SITE LOCATION
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
305846
80058
C :\U se rs
\ii gn at o\
D oc um en ts \R ev it_ te m p\
3-
M
EC
H _R
_i ig na to .rv t
SEF
SXR
JEK
12/23/2024
009258.003
COVER SHEET
NPS HOME GEOTHERMAL
HOMESTEAD NATIONAL HISTORICAL PARK
8523 NE-4
BEATRICE, NE 68310
12/23/2024
009258003- 0- 0 COVER SHEET
NPS HOME GEOTHERMAL
HOMESTEAD NATIONAL HISTORICAL PARK
8523 NE-4
BEATRICE, NE 68310
GENERAL
0 COVER SHEET
MECHANICAL
M 00 MECHANICAL INFO SHEET
M 01 SHEET SPECIFICATIONS - MECHANICAL
M 02 SHEET SPECIFICATIONS - MECHANICAL
M 03 SHEET SPECIFICATIONS - MECHANICAL
M 04 SHEET SPECIFICATIONS - MECHANICAL
M001 DEMOLITION FLOOR PLAN - MECHANICAL
M101 FLOOR PLAN - MECHANICAL
M201 PIPING FLOOR PLAN - MECHANICAL
M401 DETAILS - MECHANICAL
ELECTRICAL
E 00 ELECTRICAL INFO SHEET
E 01 ELECTRICAL SPECIFICATIONS
E 02 ELECTRICAL SPECIFICATIONS
E 03 ELECTRICAL SPECIFICATIONS
E001 FLOOR PLAN - DEMOLITION
E201 FLOOR PLAN - POWER & AUXILIARY SYSTEMS
E601 EQUIPMENT & PANEL SCHEDULES
DRAWING INDEX
SCALE: 6" = 1'-0"
1 PARK MAP
SCALE: 6" = 1'-0"
2 STAGING MAP
SCALE: 6" = 1'-0"
3 VICINITY MAP
DATE INITIAL
12/27/24
NPS HOME
GEOTHERMAL
D •
.Site of Freeman bridd{ouse' ,18i 6-1916
N9,th
If' o
1--~----.c.J2SOMeter, \.:!_;I 250 Fe<t
1,_ __ I Unpaved . r<:>ad
E---3 Trail
Parking
PJcnic area
·~,ol
SCH::MM::R
I, .1.FFERY E. KULHANEK
AM THE COORDINATING
PROFESSIONAi. ON:
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
EXISTING CONDITIONS ARE BASED ON DRAWINGS PROVIDED BY THE OWNER AND
LIMITED FIELD VERIFICATION. THE CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS AND DIMENSIONS AND NOTIFY THE ARCHITECT/ENGINEER
OF ANY DISCREPANCIES OR VARIATIONS FROM THOSE SHOWN ON THE DRAWINGS.
THE CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDITIONS AT NO
ADDITIONAL EXPENSE TO THE OWNER.
ALL CONTRACTORS ARE RESPONSIBLE FOR REVIEWING ENTIRE SET OF
DOCUMENTS TO DETERMINE THEIR FULL SCOPE OF WORK. CONTRACTOR SHALL
NOT BE ALLOWED EXTRA COSTS DUE TO FAILURE TO REVIEW ENTIRE SET OF
DOCUMENTS.
CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR WORK AND BE RESPONSIBLE
FOR SAME. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO
ADDITIONAL EXPENSE TO OWNER. COORDINATE THE WORK AND SHOP DRAWINGS
WITH ALL OTHER TRADES AFFECTED.
SCREENED HALF-TONE LINES INDICATE EXISTING CONSTRUCTION TO REMAIN.
FULL-TONE LINES INDICATED NEW OR RELOCATED CONSTRUCTION.
CONTRACTOR SHALL COORDINATE THE ROUTING OF ALL DUCTWORK WITH
STRUCTURE, CEILING, LIGHTING, AND PIPING.
MAINTAIN MANUFACTURER'S REQUIRED CLEARANCE AROUND ALL EQUIPMENT TO
ALLOW FOR MAINTENANCE ACCESS.
ALL PIPING IN CONCEALED LOCATIONS SHALL BE ROUTED AT RIGHT ANGLES AND
PARALLEL TO BUILDING WALLS UNLESS OTHERWISE INDICATED.
DO NOT ROUTE DUCTWORK OR PIPING ABOVE ELECTRICAL PANELS. MAINTAIN ALL
CODE REQUIRED CLEARANCES.
IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL
REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER
HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE
CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND
REPORT THE CONDITION TO THE OWNER AND ARCHITECT IN WRITING. THE WORK
IN THE AFFECTED AREA SHALL NOT THEREAFTER BE RESUMED EXCEPT BY
WRITTEN AGREEMENT OF THE OWNER AND CONTRACTOR.
ALL RUNOUTS TO AIR TERMINALS SHALL MATCH INLET SIZE UNLESS OTHERWISE
NOTED.
ANY UTILITY OR SYSTEM DISRUPTIONS OR OUTAGES DURING CONSTRUCTION
SHALL BE COORDINATED WITH THE OWNER AND GENERAL CONTRACTOR.
EXISTING BUILDING CONTROLS ARE ENGINEERED CONTROLS.
N. ALL NEW MECHANICAL EQUIPMENT SHALL BE PROVIDED WITH EQUIPMENT LABELS.
THE EQUIPMENT LABELS SHALL BE LAMINATED WITH WHITE LETTERS AND BLACK
BACKGROUND. NAMEPLATE SHALL BE 3/4" HIGH MADE OF VINYL WITH ADHESIVE
BACKINGS.
A.
B.
C.
D.
E.
F.
G.
H.
THE DEMOLITION PLANS WERE PRODUCED BY DUPLICATING THE ORIGINAL
DRAWINGS PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION.
DIMENSIONS AND EXISTING CONDITIONS ARE APPROXIMATE. CONTRACTOR SHALL
FIELD VERIFY EXISTING CONDITIONS. ITEMS WHICH ARE INTENDED TO BE
REMOVED, RELOCATED, OR SALVAGED ARE SHOWN AS FULL-TONE LINES. ALL
OTHER ITEMS ARE INTENDED TO REMAIN IN PLACE AND ARE SHOWN AS HALF-TONE.
DEMOLITION SHALL INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS LISTED BELOW OR
HERE-IN. THE CONTRACTOR SHALL COORDINATE ALL REQUIRED RENOVATION AND
NEW CONSTRUCTION WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL
EXTENT OF THE DEMOLITION REQUIRED AND AS LISTED BELOW.
THE REMOVAL OF FIRE PROTECTION, HVAC, AND PLUMBING EQUIPMENT FROM
FINISHED AREAS AND THROUGH WEATHER BARRIERS SHALL BE COORDINATED
WITH ARCHITECTURAL PLANS AND DETAILS AS WELL AS NOTES ON THE
MECHANICAL DRAWING TO ENSURE PROPER PATCHING AND REPAIR IS MADE TO
THE BUILDING.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL
OF ALL EXISTING COMPONENTS, MATERIALS, EQUIPMENT, AND APPURTENANCES
TO BUILD, ERECT, INSTALL, OR ACCOMMODATE ALL NEW CONSTRUCTION WITH THE
OWNER HAVING FIRST RIGHT OF REFUSAL ON ALL ITEMS.
ITEMS NOTED TO BE REMOVED AND SALVAGED OR REINSTALLED SHALL BE
CAREFULLY REMOVED BY THE CONTRACTOR WITHOUT DAMAGE AND STORED OR
REINSTALLED ON THE SITE AS DIRECTED. REMOVED OR SALVAGED ITEMS SHALL
REMAIN THE PROPERTY OF THE OWNER.
COORDINATE THE DISCONNECTION OF ELECTRICAL MOTORS AND CONTROLS WITH
ELECTRICAL CONTRACTOR PRIOR TO MECHANICAL REMOVALS.
IN THE EVENT THE CONTRACTOR ENCOUNTERS ON THE SITE, MATERIAL
REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER
HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE
CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND
REPORT THE CONDITION TO THE OWNER AND ARCHITECT IN WRITING. THE WORK
IN THE AFFECTED AREA SHALL NOT THEREAFTER BE RESUMED EXCEPT BY
WRITTEN AGREEMENT OF THE OWNER AND ARCHITECT.
ANY UTILITY OR SYSTEMS DISRUPTION OR OUTAGES DURING DEMOLITION SHALL BE
COORDINATED WITH THE OWNER AND GENERAL CONTRACTOR.
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
305846
80058
C :\U se rs
\ii gn at o\
D oc um en ts \R ev it_ te m p\
3-
M
EC
H _R
_i ig na to .rv t
SEF
SXR
JEK
12/23/2024
009258.003
M 00
MECHANICAL INFO SHEET
009258003- 6- M 00 MECHANICAL INFO SHEET
NPS HOME GEOTHERMAL
HOMESTEAD NATIONAL HISTORICAL PARK
8523 NE-4
BEATRICE, NE 68310
SYMBOL LEGEND
VOLUME DAMPER
DEMO TO EXISTING CONNECTION
SPRINKLER DRAIN
FIRE SUPPRESSION PIPING
ISOLATION VALVE
TAMPER SWITCH
MANUAL BALANCING VALVE
FLOW SWITCH
FIRE DEPARTMENT CONNECTION
CONTROL VALVE (3 WAY)
CONTROL VALVE (2 WAY)
HOSE END DRAIN VALVE
PRESSURE REDUCING VALVE
AUTO FLOW CONTROL VALVE
CHECK VALVE
HVAC DUCTWORK AND SPECIALTIES
(CONT.)
MISCELLANEOUS SYMBOLS
RETURN DUCT DOWN
AIR TERMINAL (VERTICAL MOUNTING)
ROUND DUCT UP / DOUBLE LINE PIPE
ROUND DUCT DOWN / DOUBLE
LINE PIPE
RETURN DUCT UP
TURNING VANES
SUPPLY AND FRESH AIR DUCT DOWN
SUPPLY AND FRESH AIR DUCT UP
SIZE/TYPE
SIZE/TYPE
FLOW
FLOW
SIZE/TYPE
FLOW
SMOKE DAMPER
FIRE DAMPER-HORIZ FIRE SEPARATION
MOTORIZED DAMPER-OPPOSED BLADE
MOTORIZED DAMPER-PARALLEL BLADE
ROUND AIR TERMINAL
(HORIZONTAL MOUNTING)
GRAVITY DAMPER
(OR) SAFETY VALVE-STEAM
TEMP & PRESS RELIEF
FLOOR SINK
FLOOR DRAIN
GRADE CLEANOUT
PLUMBING VENT THRU ROOF
CLEANOUT / WALL CLEANOUT
THERMOSTATIC MIXING VALVE
MM
MM
MANHOLE
TRENCH DRAIN
OVERFLOW ROOF DRAIN
OXYGEN OUTLET
PIPE CAP
ELBOW UP
AIR OUTLET
TEE
ELBOW DOWN
VACUUM OUTLET
ROOF DRAIN
SIZE/TYPE
FLOW
HUMIDISTAT
THERMOSTAT
FLEXIBLE DUCT
S
H
T
TEMPERATURE SENSORUNION
TEE DOWN
STRAINER
EXPANSION JOINT
FLEXIBLE PIPE CONNECTION
AIR VENT
TEE UP
FIRE/SMOKE DAMPER
RECTANGULAR RETURN AIR TERMINAL
(HORIZONTAL MOUNTING)
RECTANGULAR SUPPLY AIR TERMINAL
(HORIZONTAL MOUNTING)
SOLENOID VALVE
F D
TS
VALVES
FS
M
M
S
LPR
HPS
MPR
MPS
LPS
HVAC PIPING
GHWR
GHWS
HWR
HWS
PC
HPR
ES
BBD BOILER BLOW DOWN
EXHAUST STEAM
PUMPED CONDENSATE
HIGH PRESSURE RETURN
HIGH PRESSURE STEAM
MEDIUM PRESSURE RETURN
MEDIUM PRESSURE STEAM
LOW PRESSURE RETURN
LOW PRESSURE STEAM
GLYCOL HOT WATER RETURN
GLYCOL HOT WATER SUPPLY
HOT WATER RETURN
HOT WATER SUPPLY
FS-_
FD-_
CO
VTR
GCO
ORD-_
MH
X
A
V
RD-_
PIPING SPECIALTIES AND FITTINGS
WCO
FIRE PROTECTION
SIZE/TYPE
FLOW
RECTANGULAR EXHAUST AIR TERMINAL
(HORIZONTAL MOUNTING)
CWS
GCWS
CWR
CR
CS
RL
RDL
RS
GCWR GLYCOL CHILLED WATER RETURN
GLYCOL CHILLED WATER SUPPLY
REFRIGERANT LIQUID LINE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
REFRIGERANT DISCHARGE
REFRIGERANT SUCTION LINE
HCWS
HCWR
HOT/CHILLED WATER SUPPLY
HOT/CHILLED WATER RETURN
DOMESTIC HOT WATER
RECIRCULATING (DHWR)
DOMESTIC COLD WATER (DCW)
DOMESTIC HOT WATER (DHW)
ST/OST
PLUMBING PIPING
ACID VENT
TW
AV
AW
W
DS
DSCW
TWR
DSHW
SANITARY VENT
BURIED EXTERIOR WATER
TEPID WATER RECIRCULATING
TEPID WATER
DISTILLED WATER
SOFTENED HOT WATER
SOFTENED COLD WATER
ACID WASTE
STORM DRAIN
SANITARY DRAIN (BELOW FLOOR)
SANITARY DRAIN (ABOVE FLOOR)
OXYGEN
VACUUM
OX
VAC
RO
A
REVERSE OSMOSIS WATER
COMPRESSED AIR
DEIONIZED WATERDI
AIR FLOW STATIONAFSAFS
HPWR
HPWS
HEAT PUMP WATER RETURN
HEAT PUMP WATER SUPPLY
FF
SS
FSFS
NEW TO EXISTING CONNECTION
G NATURAL GAS
FOF
FOG
LPG
FOV
FOR
FOS
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL GAGE
FUEL OIL FILL
FUEL OIL VENT
LIQUEFIED PETROLEUM GAS
CD CONDENSATE DRAIN
EXHAUST DUCT DOWN
EXHAUST DUCT UP
CO CARBON MONOXIDE SENSOR
CO2 CARBON DIOXIDE SENSOR
NO2 NITROGEN DIOXIDE SENSOR
SENSOR WITH GUARD'X'
DOUBLE - GRADE CLEANOUTDGCO
ST/OST STORM DRAIN (BELOW FLOOR)
WASTE AND ANESTHETIC
GAS DISPOSAL
NITROGEN
WAGD
N
MEDICAL AIRMA
PIPE GUIDE
HOSE BIBB
THERMOMETER
PIPE ANCHOR
HB
STEAM TRAP
RHY
WH
ROOF HYDRANT
WALL HYDRANT
PRESSURE GAUGE
EXISTINGDEMO
EXISTINGNEW
18 Ø
18x10
18/10
ROUND DUCT
FLAT OVAL DUCT-1ST FIG IS SIDE
SHOWN
RECT DUCT-1ST FIG IS SIDE SHOWN
ACOUSTICAL DUCT LINER
HVAC DUCTWORK AND SPECIALTIES
HIGH EFFICIENCY TAKEOFF
HIGH EFFICIENCY TAKOFF
WITH VOLUME DAMPER
NITROGEN OUTLET
MEDICAL AIR OUTLET
WASTE AND ANESTHETIC GAS
DISPOSAL OUTLET
N
MA
V
FLEXIBLE DUCTWORK CONNECTION
ABBREVIATIONS
NORTH
ARROW
MATCHLINE
AREA A
AREA B
EXISTING
COLUMN
NEW
COLUMN
X
X
X
XXXX
SIM/OPP
X
XXXX
XX-1
X
X
SECTION/
DETAIL
PLAN
DETAIL
REFERENCE
NOTE
REFERENCE
DEMOLITION
NOTE
EQUIPMENT
NUMBER
ROOM NAME
ROOM / SPACE
NUMBER
LETTER/NUMBER
INDICATES NEW
COLUMN LINE
LETTER/NUMBER
INDICATES EXISTING
COLUMN LINE
SECTION/DETAIL NUMBER
SHEET NUMBER
INDICATES DIRECTION OF VIEW
DETAIL NUMBER
SHEET NUMBER
REFERENCE
DESIGNATION
DEMOLITION
DESIGNATION
EQUIPMENT
NUMBER
ROOM NAME DESIGNATION
ROOM NUMBER DESIGNATION
REFERENCE LEGEND
NAME
ELEVATIONLEVEL
TITLE
MARKER 1
VIEW NAME
SCALE: 1/8" = 1'-0"
DRAWING/DETAIL NUMBER
LEVEL CALLOUT
DESIGNATION
ELEVATION
DESIGNATION
GRAPHIC AREA FOR
DRAWING
TITLE
SCALE OF THE DRAWING
XXX-1
PLUMBING
FIXTURES PLUMBING FIXTURE
DESIGNATION
X"PIPE
SIZE
PIPE SIZE (DIAMETER)
X"xX"
DUCT
SIZE WIDTH x HEIGHT
X"/X" WIDTH / HEIGHT
X" DIAMETER
REF. DEMO NOTES ( ) XX REF. NOTES ( )
SEE INDIVIDUAL SHEETS FOR REFERENCE NOTES. SEE INDIVIDUAL SHEETS FOR REFERENCE NOTES.
GENERAL DEMOLITION NOTES GENERAL NOTES
MECHANICAL SHEET LIST
NORTH PLAN
NORTH
TRUE
NORTH
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MBH 1000 BTUH
MCA MINIMUM CIRCUIT AMPS
MD MOTORIZED DAMPER
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT
PROTECTION
MPR MEDIUM PRESSURE
RETURN
MPS MEDIUM PRESSURE STEAM
MS MOP SINK
N NITROGEN
NC NORMALLY CLOSED
NO NORMALLY OPEN
NPCW NONPOTABLE COLD WATER
NPHW NONPOTABLE HOT WATER
NPHWR NONPOTABLE HOT WATER
RECIRCULATING
OA OUTSIDE AIR
ORD OVERFLOW ROOF DRAIN
OX OXYGEN
P PUMP
PHC PREHEAT COIL
PIV POST INDICATING VALVE
PRV PRESSURE REGULATING VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH,
GAUGE
PTAC PACKAGED TERMINAL AIR
CONDITIONER
RA RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF AREA DRAINS
RL REFRIGERANT DISCHARGE LINE
RF RETURN FAN
RH RELIEF HOOD
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RELIEF AIR
RLF RELIEF FAN
RO REVERSE OSMOSIS WATER
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION LINE
RTU ROOF TOP UNIT
RV RELIEF VALVE
S SINK
SA SUPPLY AIR
SAN SANITARY SEWER
SD SMOKE DAMPER
SF SUPPLY FAN
SFU SANITARY FIXTURE UNIT
SH SHOWER
SP STATIC PRESSURE
SSS SURGICAL SCRUB SINK
ST STORM WATER
TD TRENCH DRAIN
TMV THERMOSTATIC MIXING VALVE
TONS TONS OF REFRIGERATION
TSP TOTAL STATIC PRESSURE
T THERMOSTAT
UH UNIT HEATER
UR URINAL
V VENT
VAC VACUUM
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
WB WET BULB
WC WATER CLOSETS
WCO WALL CLEANOUT
WF WASH FOUNTAINS
WFU WATER FIXTURE UNITS
WH WALL HYDRANT
WPD WATER PRESSURE DROP
WS WATER SOFTENER
WSHP WATER SOURCE HEAT PUMP
WWHP WATER TO WATER HEAT PUMP
YH YARD HYDRANT
A COMPRESSED AIR
AC AIR COMPRESSOR
AD AIR DOOR
AFCV AUTO FLOW CONTROL VALVE
AHU AIR HANDLING UNIT
AMP AMPERE
APD AIR PRESSURE DROP
AS AIR SEPARATOR
AV ACID VENT
AW ACID WASTE
B BOILER
BC BLOWER COIL
BD BIDET
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BHP BRAKE HORSEPOWER
BLKG BLOCKING
BLV BALANCING VALVE
BT BATHTUB
BV BALL VALVE
BW BEDPAN WASHER
CH CHILLER
CC COOLING COIL
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CUH CABINET HEATER
CI CAST IRON
CMU COMBINATION UNITS
CR CONDENSER WATER RETURN
CRAC COMPUTER ROOM AIR
CONDITIONER
CS CONDENSER WATER SUPPLY
CSS CLINICAL SERVICE SINKS
CT COOLING TOWER
CU CONDENSING UNIT - SPLIT SYSTEM
CWR CHILLED WATER RETURN
CWS CHILLED WATER SUPPLY
DB DRY-BULB TEMPERATURE
DCW DOMESTIC COLD WATER
DEG DEGREE
DF DRINKING FOUNTAIN
DGCO DOUBLE GRADE CLEANOUT
DH EMERGENCY DRENCH HOSES
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER
RECIRCULATING
DI DEIONIZED WATER
DOAS DEDICATED OUTDOOR AIR SYSTEM
DS DISTILLED WATER
DSA DUCT SOUND ATTENUATORS
DSCW DOMESTIC SOFT COLD WATER
DSHW DOMESTIC SOFT HOT WATER
DSHWR DOMESTIC SOFT HOT WATER
RECIRCULATING
DST DOMESTIC STORAGE TANK
DTW DOMESTIC TEPID WATER
DTWR DOMESTIC TEPID WATER
RECIRCULATING
EA. EACH
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EDH ELECTRIC DUCT HEATER
EEW EMERGENCY EYE WASH
EEWS EMERGENCY EYE
WASH/SHOWER
EF EXHAUST FAN
EFF EFFICIENCY
EFW EMERGENCY FACE WASH
EH EXHAUST HOOD
ERV ENERGY RECOVERY
VENTILATOR
ES EMERGENCY SHOWER
ESP EXTERNAL STATIC PRESSURE
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER
TEMPERATURE
ET EXPANSION TANK
F FIRE SUPPRESSION PIPING
F-_ FURNACE
FCO FLOOR CLEANOUT
FC FLUID COOLER
FCU FAN COIL UNIT
FD FIRE DAMPER
FLA FULL LOAD AMPS
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOOR SINK
FSD FIRE/SMOKE DAMPER
FT FINNED TUBE
G GAS
GCWR GLYCOL CHILLED
WATER RETURN
GCWS GLYCOL CHILLED
WATER SUPPLY
GD GARBAGE DISPOSAL
GDH GAS DUCT HEATER
GHCR GLYCOL HOT/CHILLED
WATER RETURN
GHCS GLYCOL HOT/CHILLED
WATER SUPPLY
GHWR GLYCOL HOT WATER RETURN
GHWS GLYCOL HOT WATER SUPPLY
GI GREASE INTERCEPTOR
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GV GAS VENT
GWH GAS WATER HEATER
HB HOSE BIBB
HC HEATING COIL
HCR HOT/CHILLED WATER RETURN
HCS HOT/CHILLED WATER SUPPLY
ACC AIR COOLED CONDENSER
ACCU AIR COOLED CONDENSING UNIT
ASHP AIR SOURCE HEAT PUMP
ARU AIR ROTATION UNIT
OI OIL INTERCEPTOR
SOI SAND OIL INTERCEPTOR
DSS DUCTLESS SPLIT SYSTEM
SP SUMP PUMP
OST OVERFLOW STORM WATER
WMB WASHING MACHINE BOX
OB OUTLET BOX
RH ROOF HYDRANT
H HUMIDIFIER
DHWP DOMESTIC HOT WATER
RECIRCULATING PUMP
DWET DOMESTIC WATER EXPANSION
TANK
HP HORSEPOWER
HPR HIGH PRESSURE RETURN
HPS HIGH PRESURE STEAM
HRC HEAT RECOVERY COIL
HWR HOT WATER RETURN (HEATING)
HWS HOT WATER SUPPLY (HEATING)
HX HEAT EXCHANGER
HY HYDRANTS
HP-_ HEAT PUMP
HVLS HIGH VOLUME LOW SPEED
IH INTAKE HOOD
IRH INFRARED RADIANT HEATER
KH KITCHEN HOOD
KW KILOWATT
KWH KILOWATT HOURS
L LAVATORY
LAT LEAVING AIR TEMPERATURE
LPR LOW PRESSURE RETURN
LPG LIQUIFIED PETROLEUM GAS
LPS LOW PRESSURE STEAM
LRA LOCKED ROTOR AMPS
LS LAUNDRY SINK
LV LOUVER
LWT LEAVING WATER TEMPERATURE
PROJECT MECHANICAL REFERENCED DEMOLITION NOTES PROJECT MECHANICAL REFERENCED NOTES
M 00 MECHANICAL INFO SHEET
M 01 SHEET SPECIFICATIONS - MECHANICAL
M 02 SHEET SPECIFICATIONS - MECHANICAL
M 03 SHEET SPECIFICATIONS - MECHANICAL
M 04 SHEET SPECIFICATIONS - MECHANICAL
M001 DEMOLITION FLOOR PLAN - MECHANICAL
M101 FLOOR PLAN - MECHANICAL
M201 PIPING FLOOR PLAN - MECHANICAL
M401 DETAILS - MECHANICAL
DATE INITIAL
12/27/24 l>
I I .__
-'----1------- : l><l
___ r;-1-
1)----r-½
--------1=:-c,1
----+-;t--u
III:
-------F--=--w
-,1
----u----
I I
I
I
::::71 ::::71 ::::71
7-- I
C
L
6-.·
SCH::MM::R
Design with Purpose. Build with Confidence.
I u.:
0:
0.-
1044 North 115th Street | Suite 300 Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
305846
80058
C :\U se rs
\ii gn at o\
D oc um en ts \R ev it_ te m p\
3-
M
EC
H _R
_i ig na to .rv t
SEF
SXR
JEK
12/23/2024
009258.003
M 01
SHEET SPECIFICATIONS -
MECHANICAL
009258003- 6- M 01 SHEET SPECIFICATIONS - MECHANICAL
NPS HOME GEOTHERMAL
HOMESTEAD NATIONAL HISTORICAL PARK
8523 NE-4
BEATRICE, NE 68310
DATE INITIAL
12/27/24
SECTION 230000-GENERAL HVAC REQUIREMENTS
PART 1-GENERAL
1.1 DESCRIPTION OF WORK
A.
B.
C.
This Division includes all labor, materials, equipment, tools, supervision, start-up services, Owner training, etc., including all incidental and related items, necessary to complete installation and successfully test and start up and operate the HVAC systems indicated on the drawings, and as de scribed in each Section of Division 230000 Specifications.
All work shall be completed in compliance with local codes, rules, and regulations. In the event that the plans conflict with any rules, regulation, or codes, the rules, regulations, and codes shall govern. Where the plans exceed code requirements, the plans shall govern.
The Contractor and his Subcontractors shall include all materials, labor, and necessary equipment in his bid.
1.2 DRAWINGS
A. The drawings are generally diagrammatic and show general location and arrangement of equipment, ductwork, piping, and accessories. The con tractor shall prm.tde and install all necessary equipment, fittings, offsets and other components required to adapt to field conditions, interferences, and code requirements to deliver a complete and functional system.
B. Deviations from the drawings, with the exception of changes to field con ditions, and do not effect system functionality, shall not be made without the written approval of the Engineer.
C. Architectural and Structural drawings take precedence in all matters per taining to the building structure. HVAC drawings take precedence in all matter pertaining to HVAC work and electrical drawings to electrical work.
Where conflicts between trades exist, report conflicts or differences to the Architect and Engineer.
1.3 COORDINATION
SECTION 230529-HANGERS AND SUPPORTS FOR HVAC PIPING AND
EQUIPMENT
PART 1-GENERAL
1.1 ACTION SUBMITTALS
A. Product Data: For each type of product.
PART 2-PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Structural Performance: Hangers and supports for HVAC piping and equipment shall withstand the effects of gravity loads and stresses within limits and under conditions indicated according to ASCE/SEI 7.
1. Design supports for multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system con tents, and test water.
2. Design equipment supports capable of supporting combined oper ating weight of supported equipment and connected systems and components.
2.2 METAL PIPE HANGERS AND SUPPORTS
A. Carbon-Steel Pipe Hangers and Supports:
1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.
2. Galvanized Metallic Coatings: Pregalvanized, hot-dip galvanized, or electro-galvanized.
3.
4.
5.
Nonmetallic Coatings: Plastic coated, or epoxy powder-coated.
Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.
Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.
A. The Contractor shall examine the plans and coordinate with other trades 2.3 EQUIPMENT SUPPORTS
B.
C.
D.
E.
for scheduling of work.
Coordinate all penetrations with architectural and structural trades.
Refer to architectural plans for exact locations and heights of fixtures.
Refer to architectural plans for coordination of all ceiling mounted access panels for HVAC equipment that requires access.
All HVAC equipment and piping located above ceiling shall be installed to preserve ceiling heights listed on architect ceiling plans.
1.4 GUARANTEE
A. Contractor shall guarantee that all labor, materials and equipment are free from defects. Contractor shall agree to replace or repair any part of their project scope that becomes defective with one year from substantial com pletion and following final acceptance from the Owner.
1.5 PERMITS AND FEES
A. Description: Welded, shop- or field-fabricated equipment support made from structural carbon-steel shapes.
2.4 MA TE RIALS
A. Carbon Steel: ASTh1 A 1011/A 1011M.
B. Structural Steel: ASTiv1 A 36/A 36M, carbon-steel plates, shapes, and bars; black and galvanized.
PART 3-EXECUTION
3.1 APPLICATION
A. Strength of Support Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static loads within specified loading limits. Minimum static design load used for strength determination shall be weight of supported components plus 90 kg (200 I b).
A. The Contractor shall be responsible for coordinating and obtaining all ap- 3.2 HANGER AND SUPPORT INSTALLATION plicable agency approvals for utility connections and permits.
1.6 ACTION SUBM ITTALS
A.
B.
Provide product submittals for all required specification sections. Submit tals shall be submitted in PDF format.
Contractor shall review and mark with approval stamp before submitting to Architect.
1.7 EQUIPMENT AND MA TE RIAL MANUFACTURERS
A. All equipment shall be provided with normally supplied accessories need ed for complete installation.
B. All equipment shall be new and shall be standard products from the cur rent manufacture product line offering.
C. If an alternate manufacturer to the basis of design is submitted and ap proved, the Contractor shall assume all costs required to adapt the sys tem to the submitted piece of equipment, including, but not limited to: pip ing, sheet metal, electrical work, and building alterations. Alternate equipment shall conform to all space requirements and operating condi tions.
1.8 QUALITY ASSURANCE
A.
B.
Structural-Steel Welding Qualifications: Qualify procedures and personnel according to AWS D1 .1/D1 .1M, "Structural Welding Code - Steel."
Pipe Welding Qualifications: Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code, Section IX.
PART 2-PRODUCTS (NOT USED)
PART 3-EXECUTION
3.1 PROTECTION AND HANDLING OF EQUIPMENT
A.
B.
The Contractor shall be responsible for ensuring all equipment and mate rials delivered to the site are protected from theft and damage until time of project turnover to the Owner.
All HVAC fixtures, ductwork, and piping shall be protected from damage and use after installation.
3.2 FIELD QUALITY CONTROL
A. Field Service: Engage a trained service representative to test and in spect all installed equipment, assemblies and installations.
B.
C.
D.
Perform functional tests on all installed equipment.
Any equipment that does not pass tests and inspections shall be consid ered defective.
Prepare test and inspection reports. Reports shall be included in Opera tion and Maintenance Manual turned over to Owner.
3.3 OPERATION AND MAINTENANCE
A.
B.
C.
D.
E.
F.
G.
H.
Metal Pipe-Hanger Installation: Comply with MSS SP-58. Install hangers, supports, clamps, and attachments as required to properly support piping from the building structure.
Equipment Support Installation: Fabricate from welded-structural-steel shapes.
Install hangers and supports to allow controlled thermal movement of pip ing systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
Install lateral bracing with pipe hangers and supports to prevent swaying.
Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 (DN 65) and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms and install reinforcing bars through open ings at top of inserts.
Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to con nected equipment.
Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.
Insulated Piping:
1.
2.
3.
Attach clamps and spacers to piping.
a.
b.
C.
Piping Operating above Ambient Air Temperature: Clamp may project through insulation.
Piping Operating below Ambient Air Temperature: Use ther mal-hanger shield insert with clamp sized to match OD of insert.
Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.
Install MSS SP-58, Type 39, protection saddles if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation.
Shield Dimensions for Pipe: Not less than the following:
a. NPS 1/4 to NPS 3-1/2 (DN 8 to DN 90): 12 inches (305 mm) long and 0.048 inch (1.22 mm) thick.
3.3 EQUIPMENT SUPPORTS
A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.
B. Provide lateral bracing, to prevent swaying, for equipment supports.
A. Prior to final inspections, the Contractor shall provide training to the Own- 3.4 METAL FABRICATIONS er on operation, adjustment, and maintenance on all installed equipment.
B. The Contractor shall prepare and turnover to the Owner a binder with all operation and maintained manuals for all equipment installed.
3.4 ACCESSIBILITY
A. All equipment installed shall fit within the designated space with adequate access for service and maintained and required by the manufacturer.
3.5 CLEANING
A. Each trade is responsible for maintaining a clean and hazard free work area.
B. After each piece of equipment has been installed and tested, each system shall be cleaned and flushed.
END OF SECTION
A.
B.
C.
Cut, drill, and fit miscellaneous metal fabrications for equipment supports.
Fit exposed connections together to form hairline joints. Field weld con nections that cannot be shop welded because of shipping size limitations.
Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding; appearance and quality of welds; and methods used in correcting welding work; and with the following:
1.
2.
3.
Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
Obtain fusion without undercut or overiap.
Remove welding flux immediately.
4. Finish welds at exposed connections so no roughness shows after finishing and so contours of welded surfaces match adjacent con tours.
3.5 ADJUSTING
A. Hanger Adjustments: Adjust hangers to distribute loads equally on attach ments and to achieve indicated slope of pipe.
B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches (40 mm).
3.6 HANGER AND SUPPORT SCHEDULE
A.
B.
C.
Specific hanger and support requirements are in Sections specifying pip ing systems and equipment.
Comply with MSS SP-58 for pipe-hanger selections and applications that are not specified in piping system Sections.
Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.
B.
C.
D.
Cut insulation, ducts, pipes, and equipment cabinets for installation oftest probes to the minimum extent necessary for TAB procedures.
1. After testing and balancing, patch probe holes in ducts with same material and thickness as used to construct ducts.
2.
3.
After testing and balancing, install test ports and duct access doors that comply with requirements in Section 233300 "Air Duct Acces sories."
Install and join new insulation that matches removed materials. Re store insulation, coverings, vapor barrier, and finish to original state.
Mark equipment and balancing devices, including damper-control posi tions, valve position indicators, fan-speed-control levers, and similar con trols and devices, with paint or other suitable, permanent identification material to show final settings.
Take and report testing and balancing measurements in inch-pound (IP) units.
D. Use nonmetallic coatings on attachments for electrolytic protection where 3.2 GENERAL PROCEDURES FOR BALANCING AIR SYSTEMS
E.
F.
G.
attachments are in direct contact with copper tubing.
Use carbon-steel pipe hangers and supports and attachments for general service applications.
Use thermal-hanger shield inserts for insulated piping and tubing.
1. Insert Material for All Piping: AS1M C 552, Type II cellular glass with 100-psi or ASTh1 C 591, Type VI, Grade 1 polyisocyanurate with 125-psi minimum compressive strength and vapor barrier.
Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1.
2.
3.
4.
Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of noninsulated or insulated, stationary pipes NPS 1/2 to NPS 30 (DN 15 to DN 750).
Yoke-Type Pipe Clamps (MSS Type 2): For suspension of up to 1050 deg F (566 deg C), pipes NPS 4 to NPS 24 (DN 100 to DN 600), requiring up to 4 inches (100 mm) of insulation.
Adjustable, Steel Band Hangers (MSS Type 7): For suspension of noninsulated, stationary pipes NPS 112 to NPS 8 (DN 15 to
DN 200).
Adjustable Band Hangers (MSS Type 9): For suspension of nonin sulated, stationary pipes NPS 1/2 to NPS 8 (DN 15 to DN 200).
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
Prepare test reports for both fans and outlets. Obtain manufacturer's out let factors and recommended testing procedures. Cross-check the sum mation of required outlet volumes with required fan volumes.
Prepare schematic diagrams of systems' "as-built" duct layouts.
Determine the best locations in main and branch ducts for accurate duct airflow measurements.
Check airflow patterns from the outdoor-air louvers and dampers and the return- and exhaust-air dampers through the supply-fan discharge and mixing dampers.
Locate start-stop and disconnect switches, electrical interlocks, and motor starters.
Verify that motor starters are equipped with properly sized thermal protec tion.
Check dampers for proper position to achieve desired airflow path.
Check for airflow blockages.
Check condensate drains for proper connections and functioning.
Check for proper sealing of air-handling-unit components.
Verify that air duct system is sealed as specified in Section 233113 "Metal Ducts."
H. Vertical-Piping Clamps: Unless otherwise indicated and except as speci- 3_3 PROCEDURES FOR CONSTANT-VOLUME AIR SYSTEMS fied in piping system Sections, install the following types:
I.
1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe nsers NPS 3/4 to NPS 24 (DN 24 to DN 600).
Hanger-Rod Attachments: Unless otheiwise indicated and except as specified in piping system Sections, install the following types:
1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches (150 mm) for heavy loads.
2. Steel Clevises (MSS Type 14): For 120 to 450 deg F (49 to 232 deg C) piping installations.
3. Swivel Turnbuckles (MSS Type 15): For use with MSS Type 11, split pipe rings.
4. Malleable-Iron Sockets (MSS Type 16): For attaching hanger rods to various types of building attachments.
J. Building Attachments: Unless otherwise indicated and except as specified in pping system Sections, install the following types:
1. Steel or Malleable Concrete Inserts (MSS Type 18): For upper at tachment to suspend pipe hangers from concrete ceiling.
2. Top-Beam C-Clamps (MSS Type 19): For use under roof installa tions with bar-joist construction, to attach to top flange of structural shape.
3. Side-Beam or Channel Clamps (MSS Type 20): For attaching to bottom flange of beams, channels, or angles.
4. Center-Beam Clamps (MSS Type 21): For attaching to center of bottom flange of beams.
5. C-Clamps (MSS Type 23): For structural shapes.
6. Top-Beam Clamps (MSS Type 25): For top of beams if hanger rod is required tangent to flange edge.
7. Steel-Beam Clamps with Eye Nuts (MSS Type 28): For attaching to bottom of steel I-beams for heavy loads.
K. Saddles and Shields: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel-Pipe-Covering Protection Saddles (MSS Type 39): To fill inte rior voids with insulation that matches adjoining insulation.
2. Protection Shields (MSS Type 40): Of length recommended in writ ing by manufacturer to prevent crushing insulation.
END OF SECTION
SECTION 230593-TESTING, ADJUSTING, AND BALANCING FOR HVAC
PART 1-GENERAL
1.1 ACTION SUBMITTALS
A. TAB Report: Documentation indicating that Work complies with ASHRAE/ IES 90.1, Section 6.7.2.3- "System Balancing."
1.2 INFORMATIONAL SUBMITTALS
A. Certified TAB reports.
1.3 QUALITY ASSURANCE
A. TAB Specialists Qualifications: Certified by NEBB or TABB.
1. TAB Field Supervisor: Employee of the TAB specialist and certified by NEBB or TABB.
A.
B.
C.
Adjust fans to deliver total indicated airflows within the maximum allowa ble fan speed listed by fan manufacturer.
1. Measure total airflow.
a. Set outside-air, return-air, and relief-air dampers for proper position that simulates minimum outdoor-air conditions.
b. Where duct conditions allow, measure airflow by Pitot-tube traverse. If necessary, perform multiple Pitot-tube traverses to obtain total airflow.
c. Where duct conditions are not suitable for Pitot-tube traverse measurements, a coil traverse may be acceptable.
d. If a reliable Pitot-tube traverse or coil traverse is not possi ble, measure airflow at terminals and calculate the total air flow.
2. Measure fan static pressures as follows:
a. Measure static pressure directly at the fan outlet or through the flexible connection.
b. Measure static pressure directly at the fan inlet or through the flexible connection.
c. Measure static pressure across each component that makes up the air-handling system.
d. Report artificial loading of filters at the time static pressures are measured.
3. Review Record Documents to determine variations in design static pressures versus actual static pressures. Calculate actual system effect factors. Recommend adjustments to accommodate actual conditi ans.
4. Obtain approval from Architect for adjustment of fan speed higher or lower than indicated speed. Comply with requirements in HVAC Sections for air-handling units for adjustment of fans, belts, and pulley sizes to achieve indicated air-handling-unit performance.
5. Do not make fan-speed adjustments that result in motor overioad.
Consult equipment manufacturers about fan-speed safety factors.
Modulate dampers and measure fan-motor amperage to ensure that no overload occurs. Measure amperage in full-cooling, full heating, economizer, and any other operating mode to determine the maximum required brake horsepower.
Adjust volume dampers for main duct, submain ducts, and major branch ducts to indicated airflows.
1. Measure airflow ofsubmain and branch ducts.
2. Adjust submain and branch duct volume dampers for specified air flow.
3. Re-measure each submain and branch duct after all have been adjusted.
Adjust air inlets and outlets for each space to indicated airflows.
1.
2.
Set airflow patterns of adjustable outlets for proper distribution with out drafts.
Measure inlets and outlets airflow.
3. Adjust each inlet and outlet for specified airflow.
4. Re-measure each inlet and outlet after they have been adjusted.
2. TAB Technician: Employee of the TAB specialist and certified by 3.4 PROCEDURES FOR VARIABLE-FLOW HYDRONIC SYSTEMS NEBB or TABB as a TAB technician.
B. Instrumentation Type, Quantity, Accuracy, and Calibration: Comply with requirements in ASHRAE 111, Section 4, "Instrumentation."
PART 2-PRODUCTS (Not Applicable)
PART 3-EXECUTION
3.1 GENERAL PROCEDURES FOR TESTING AND BALANCING
A. Peliorm testing and balancing procedures on each system according to the procedures contained in NEBB's "Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems" and in this Section.
A.
B.
C.
Balance systems with automatic two- and three-way control valves by setting systems at maximum flow through heat-exchange terminals, and proceed as specified above for hydronic systems.
Adjust the variable-flow hydronic system as follows:
1. Verify that the differential-pressure sensor is located as indicated.
2. Determine whether there is diversity in the system.
For systems with no diversity:
1. Adjust pumps to deliver total design gpm.
SCH::MM::R
Design with Purpose. Build wjth Confidence.
D.
c. Measure total water flow.
1) Position valves for full flow through coils.
2) Measure flow by main flow meter, if installed.
3) If main flow meter is not installed, determine flow by pump TDH or exchanger pressure drop.
b. Measure pump TDH as follows:
1) Measure discharge pressure directly at the pump out let flange or in discharge pipe prior to any valves.
2) Measure inlet pressure directly at the pump inlet flange or in suction pipe prior to any valves or strain ers.
3) Convert pressure to head and correct for differences in gage heights.
4) Verify pump impeller size by measuring the TDH with the discharge valve closed. Note the point on ma nu facturer's pump curve at zero flow and verify that the pump has the intended impeller size.
5) With valves open, read pump TDH. Adjust pump dis charge valve until design water flow is achieved.
c. Monitor motor performance during procedures and do not operate motor in an overioaded condition.
2. Adjust flow-measuring devices installed in mains and branches to design water flows.
a. Measure flow in main and branch pipes.
b. Adjust main and branch balance valves for design flow.
c. Re-measure each main and branch after all have been ad justed.
3. Adjust flow-measuring devices installed at terminals for each space to design water flo\/1/S.
a. Measure flow at terminals.
b. Adjust each terminal to design flow.
c. Re-measure each terminal after it is adjusted.
d. Position control valves to bypass the coil and adjust the by pass valve to maintain design flow.
e. Perform temperature tests after flows have been balanced.
4. For systems with pressure-independent valves at terminals:
a. Measure differential pressure and verify that it is within man ufacturer's specified range.
b. Perform temperature tests after flows have been verified.
5. For systems without pressure-independent valves or flow measuring de~ces at terminals:
a. Measure and balance coils by either coil pressure drop or temperature method.
b. If balanced by coil pressure drop, perform temperature tests after flows have been verified.
6. Prior to verifying final system conditions, determine the system dif ferential-pressure set point.
7. If the pump discharge valve was used to set total system flow with variable-frequency controller at 60 Hz, at completion open dis charge valve 100 percent and allow variable-frequency controller to control system differential-pressure set point. Record pump data under both conditions.
8. Mark final settings and verify that all memory stops have been set.
9. Verify final system conditions as follows:
a. Re-measure and confirm that total water flow is within de sign.
b. Re-measure final pumps' operating data, TDH, volts, amps, and static profile.
c. Mark final settings.
10. Verify that memory stops have been set.
For systems with diversity:
1. Determine diversity factor.
2. Simulate system diversity by closing required number of control valves, as approved by the design engineer.
3. Adjust pumps to deliver total design gpm.
4.
5.
a. Measure total water flow.
1) Position valves for full flow through coils.
2) Measure flow by main flow meter, if installed.
3) If main flow meter is not installed, determine flow by pump TDH or exchanger pressure drop.
b. Measure pump TDH as follows:
1) Measure discharge pressure directly at the pump out let flange or in discharge pipe prior to any valves.
2) Measure inlet pressure directly at the pump inlet flange or in suction pipe prior to any valves or strain ers.
3) Convert pressure to head and correct for differences in gage heights.
4) Verify pump impeller size by measuring the TDH with the discharge valve closed. Note the point on manu facturer's pump curve at zero flow and verify that the pump has the intended impeller size.
5) With valves open, read pump TDH. Adjust pump dis charge valve until design water flow is achieved.
c. Monitor motor performance during procedures and do not operate motor in an overioaded condition.
Adjust flow-measuring devices installed in mains and branches to design water flows.
a. Measure flow in main and branch pipes.
b. Adjust main and branch balance wives for design flow.
c. Re-measure each main and branch after all have been ad-justed.
Adjust flow-measuring devices installed at terminals for each space to design water flo\/1/S.
a. Measure flow at terminals.
b. Adjust each terminal to design flow.
c. Re-measure each terminal after it is adjusted.
d. Position control valves to bypass the coil, and adjust the by pass valve to maintain design flow.
e. Peliorm temperature tests after flows have been balanced.
6. For systems with pressure-independent valves at terminals:
a. Measure differential pressure, and verify that it is within man ufacturer's specified range.
b. Peliorm temperature tests after flows have been verified.
7. For systems without pressure-independent valves or flow measuring devices at terminals:
a. Measure and balance coils by either coil pressure drop or temperature method.
b. If balanced by coil pressure drop, perform temperature tests after flows have been verified.
8. Open control valves that were shut. Close a sufficient number of control valves that were previously open to maintain diversity, and balance terminals that were just opened.
9. Prior to verifying final system conditions, determine system differ ential-pressure set point.
10. If the pump discharge valve was used to set total system flow with variable-frequency controller at 60 Hz, at completion open dis charge valve 100 percent and allow variable-frequency controller to control system differential-pressure set point. Record pump data under both conditions.
11. Mark final settings and verify that memory stops have been set.
12. Verify final system conditions as follows:
a. Re-measure and confirm that total water flow is within de sign.
b. Re-measure final pumps' operating data, TDH, volts, amps, and static profile.
c. Mark final settings.
13. Verify that memory stops have been set.
3.5 TOLERANCES
A. Set HVAC system's airflow rates and water flow rates within the following tolerances:
1. Supply, Return, and Exhaust Fans and Equipment with Fans: Plus or minus 1 O percent.
2. Air Outlets and Inlets: Plus or minus 10 percent.
3. Heat Pump Water Flow Rate: Plus or minus 1 O percent.
B. Maintaining pressure relationships as designed shall have priority over the tolerances specified above.
3.6 FINAL REPORT
A. General: Prepare a certified written report; tabulate and divide the report into separate sections for tested systems and balanced systems.
1. Include a certification sheet at the front of the report's binder, signed and sealed by the certified testing and balancing engineer.
2. Include a list of instruments used for procedures, along with proof of calibration.
3. Certify validity and accuracy of field data.
B. Final Report Contents: In addition to certified field-report data, include the following:
1. Pump curves.
2. Fan curves.
3. Manufacturers' test data.
4. Field test reports prepared by system and equipment installers.
5. Other information relative to equipment performance; do not in clude Shop Drawings and Product Data.
END OF SECTION
SECTION 230713-DUCT INSULATION
PART 1-GENERAL
1.1 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
PART 2-PRODUCTS
2.1 INSULATIONMATERIALS
A. Comply with requirements in "Duct Insulation Schedule, General," "Indoor Duct and Plenum Insulation Schedule," and "Aboveground, Outdoor Duct and Plenum Insulation Schedule" articles for where insulating materials shall be applied.
B. Products shall not contain asbestos, lead, mercury, or mercury com pounds.
C. Foam insulation materials shall not use CFC or HCFC blowing agents in the manufacturing process.
D. Mineral-Fiber Blanket Insulation: Mineral or glass fibers bonded with a thermosetting resin. Comply with ASTh1 C553, Type II and ASTh1 C1290, Type Ill with factory-applied FSK jacket. Factory-applied jacket require ments are specified in "Factory-Applied Jackets" Article.
2.2 ACHES IVES
A. Materials shall be compatible with insulation materials, jackets, and sub strates and for bonding insulation to itself and to surfaces to be insulated unless otherwise indicated.
B. Mineral-Fiber Adhesive: Comply with MIL-A-3316C, Class 2, Grade A.
C. FSK Jacket Adhesive: Comply with MIL-A-3316C, Class 2, Grade A for bonding insulation jacket lap seams and joints.
2.3 MASTICS AND COATINGS
A. Materials shall be compatible with insulation materials, jackets, and sub strates.
B. Vapor-Retarder Mastic: Water based; suitable for indoor use on below ambient services.
1. Water-Vapor Permeance: Comply with ASTM C755, Section 7.2.2, Table 2, for insulation type and ser~ce conditions.
2. Service Temperature Range: Minus 20 to plus 180 deg F (Minus 29 to plus 82 deg C).
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
305846
80058
C :\U se rs
\ii gn at o\
D oc um en ts \R ev it_ te m p\
3-
M
EC
H _R
_i ig na to .rv t
SEF
SXR
JEK
12/23/2024
009258.003
M 02
SHEET SPECIFICATIONS -
MECHANICAL
009258003- 6- M 02 SHEET SPECIFICATIONS - MECHANICAL
NPS HOME GEOTHERMAL
HOMESTEAD NATIONAL HISTORICAL PARK
8523 NE-4
BEATRICE, NE 68310
DATE INITIAL
12/27/24
3.
4.
Comply with MIL-PRF-19565C, Type 11, for permeance require ments
Color: White.
N. Repair damaged insulation facings by applying same facing material over damaged areas. Extend patches at least 4 inches (100 mm) beyond dam aged areas. Adhere, staple, and seal patches similar to butt joints.
C. Breather Mastic: Water based; suitable for indoor and outdoor use on 3•3 PENE1RA TIONS above ambient services. A. Insulation Installation at Aboveground Exterior Wall Penetrations: Install
1.
2.
Water-Vapor Permeance: AS1M E96, greater than 1.8 perm at manufacturer's recommended dry film thickness.
Service Temperature Range: Minus 20 to plus 180 deg F (Minus 29 to plus 82 deg C).
3. Color: White.
2.4 FACTORY-APPLIED JACKETS
A. Insulation system schedules indicate factory-applied jackets on various applications. When factory-applied jackets are indicated, comply with the following:
1. FSK Jacket: Aluminum-foil, fiberglass-reinforced scrim with kraft paper backing; complying with ASTM C1136, Type II.
2.5 TAPES
A. Aluminum-Foil Tape: Vapor-retarder tape with acrylic adhesive.
1. Width: 2 inches (50 mm).
2. Thickness: 3.7 mils (0.093 mm).
3. Adhesion: 100 ounces force/inch (1.1 N/mm) in width.
4. Elongation: 5 percent.
5. Tensile Strength: 34 lbf/inch (6.2 N/mm) in width.
2.6 SECUREMENTS
A.
B.
C.
Aluminum Bands: ASTM 8209 (ASTM 8209M), Alloy 3003, 3005, 3105, or 5005; Temper H-14, 0.020 inch (0.51 mm) thick, 1/2 inch (13 mm) wide with wing seal or closed seal.
Insulation Pins and Hangers:
1. Insulation-Retaining Washers: Self-locking washers formed from 0.016-inch- (0.41-mm-) thick, galvanized-steel sheet, with be;eled edge sized as required to hold insulation securely in place but not less than 1-1/2 inches (38 mm) in diameter.
a. Protect ends with capped self-locking washers incorporating a spring steel insert to ensure permanent retention of cap in exposed locations.
Staples: Outward-clinching insulation staples, nominal 3/4--inch- (19-mm-) wide, stainless steel or Monel.
D. Wire: 0.062-inch (1.6-mm) soft-annealed, stainless steel.
PART 3-EXECUTION
3.1 PREPARATION
A. Surface Preparation: Clean and dry surfaces to receive insulation. Re move materials that will adversely affect insulation application.
3.2 GENERAL INSTALLATION REQUIREMENTS
A. Install insulation materials, accessories, and finishes with smooth, straight, and even surfaces; free of voids throughout the length of ducts and fittings.
B. Install insulation materials, vapor barriers or retarders, jackets, and thick nesses required for each item of duct system as specified in insulation system schedules.
C. Install accessories compatible with insulation materials and suitable for the service. Install accessories that do not corrode, soften, or otherwise attack insulation or jacket in either wet or dry state.
D. Install insulation with longitudinal seams at top and bottom of horizontal runs.
E.
F.
G.
H.
I.
J.
K.
L.
M.
Install multiple layers of insulation with longitudinal and end seams stag gered.
Keep insulation materials dry during application and finishing.
Install insulation with tight longitudinal seams and end joints. Bond seams and joints with adhesive recommended by insulation material manufactur er.
Install insulation with least number of joints practical.
Where vapor barrier is indicated, seal joints, seams, and penetrations in insulation at hangers, supports, anchors, and other projections with vapor barrier mastic.
1. Install insulation continuously through hangers and around anchor attachments.
2. For insulation application where vapor barriers are indicated, ex tend insulation on anchor legs from point of attachment to support ed item to point of attachment to structure. Taper and seal ends at attachment to structure with vapor-barrier mastic.
3. Install insert materials and install insulation to tightly join the insert.
Seal insulation to insulation inserts with adhesive or sealing com pound recommended by insulation material manufacturer.
Apply adhesives, mastics, and sealants at manufacturer's recommended coverage rate and wet and dry film thicknesses.
Install insulation with factory-applied jackets as follows:
1. Draw jacket tight and smooth.
2. Cover circumferential joints with 3-inch- (75-mm-) wide strips, of same material as insulation jacket. Secure strips with adhesive and outward clinching staples along both edges of strip, spaced 4 inch es (100 mm) o.c.
3. Overlap jacket longitudinal seams at least 1-1/2 inches (38 mm).
4.
5.
Clean and dry surface to receive self-sealing lap. Staple laps with outward clinching staples along edge at 2 inches (50 mm) o.c.
a. For below ambient services, apply vapor-barrier mastic over staples.
Cover joints and seams with tape, according to insulation material…