B08_Solicitation_Attachment_1_SOW.docx
DOCX document 138 KB Posted
- Attached to
- COLO - REPLACE SIDING AND PAINT BURCHER COTTAGE
- Solicitation number
- 140P4325R0038
About this file
This document is a Statement of Work (SOW) for the National Park Service's project to replace siding and paint the Burcher Cottage located at 402 Main St. in Yorktown, Virginia. The base contract requires removing and replacing approximately 660 square feet of damaged wood siding, with options to paint the entire cottage and replace windowsill trim on 5 windows. The project involves using new cedar wood siding matching the existing dimensions and design, and painting with colors approved by the park. The work must be performed between 8 AM and 4:30 PM, with the contractor responsible for providing all necessary personnel, equipment, materials, and liability insurance.
The solicitation (140P4325R0038) is issued by the Department of the Interior's National Park Service Northeast Region, with an estimated project value between $25,000 and $100,000. An organized site visit is scheduled for July 21, 2025, at 8:00 am ET at the project location. The contract requires adherence to OSHA guidelines, includes a minimum 1-year warranty for building components and 5-year warranty for workmanship, and mandates that all materials and methods meet current local, state, and federal codes. The primary point of contact is Joseph Lamm, Supervisory Facility Operations Specialist, who can be reached at 757-272-9847.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLO PMIS 349541 April 10, 2025
COLONIAL NATIONAL HISTORICAL PARK
Yorktown, Virginia Replace Siding and Paint Burcher Cottage PROJECT MANUAL Summary of Work
NATIONAL PARK SERVICE
April 10, 2025
STATEMENT OF WORK
Replace Siding and Paint Burcher Cottage 402 Main St. Yorktown VA 23690 Colonial National Historical Park Virginia
PART 1 - GENERAL
1.01 DESCRIPTION OF WORK
A. This contract provides for the removal and replacement of approximately 660 -SF of damaged wood siding, removal and replacement of 5 damaged windowsills and painting of Burcher Cottage (approximately 3,300 – SF).
1. The building is a two-story housing unit. The structure was built circa 1887 with a single-story addition in 1950.
2. The building will not be occupied during this contract.
B. The contract work includes:
Base Contract Work:
1. Remove and dispose of the existing damaged wood siding off site (Note: 20% of building siding needs replacement and contract will cover replacement of up to 660SF of siding replacement). Damaged siding includes all siding that shows signs of rot, splitting or water damage.
2. Replace all damaged siding with new in-kind cedar wood siding (Note: All new siding must match dimensions and design of current siding). Siding will need to be approved by park before installation. Burcher Cottage has multiple different styles of siding.
3. Hardware used for installation of siding must match current hardware.
4. Protect the building structure and contents from weather and other potentially damaging elements.
5. Caulk any area of siding where water could enter building.
6. Disposing properly of all excess materials and debris.
7. Erosion prevention and quality assurance testing.
8. Reconstruction and restoration of disturbed areas.
Option 1 Work:
1. Paint entire Burcher Cottage siding/trim/chimney(s). Paint must match color and finish of current paint on structure. Any loose or peeling paint should be removed before new paint is applied. Note: Park will approve paint color and finish before application. Note: Two colors will be required for contract (siding color and window trim color).
2. Disposing properly of all excess materials and debris.
3. Reconstruction and restoration of disturbed areas.
Option 2 Work:
1. Replace Windowsill trim damaged by elements on 5 separate windows.
2. Paint entire Burcher Cottage Window Trim/Sills/Shutters. Paint must match color and finish of current paint on structure. Note: Park will approve paint color and finish before application. Note: Two colors will be required for contract (siding color and window trim color).
3. Reconstruction and restoration of disturbed areas.
C. All work will be performed under a single contract.
D. Work and materials shall adhere to the following mitigations:
1. Replacement cedar siding should match existing siding in size, design, color, and texture. New siding must be approved by COR before installation.
2. Materials shall be stored at work location.
3. Must follow OSHA guidelines for work performed on an elevated surface.
1.02 LOCATION AND ACCESS
A. The project site is located at 402 Main St. Yorktown VA 23690.
1.03 CONTRACTOR-FURNISHED ITEMS
A. The Contractor shall furnish all necessary supervision, personnel, equipment, transportation, materials, and incidentals required to complete the contract requirements.
B. Contractor shall provide proof of liability insurance for all personnel working in completion of this project.
1.04 WORK CONDITIONS AND LIMITATIONS
A. FACILITY USE
1. There are open public restrooms within walking distance of work location.
B. REQUIRED PERFORMANCE PERIOD
1. Work performance period is to be determined; all work shall be performed between 8 AM – 4:30 PM.
C. CONTRACTOR’S USE OF PREMISES
1. Confine on-site material storage, equipment and vehicle parking, and staging to paved parking areas or other areas specifically designated by the Contracting Officer’s Representative (COR).
2. Keep job site clear of trash and debris. Dispose of any trash, debris and other unusable material legally at authorized facilities on non-Federal land.
D. FIELD VERIFICATION
1. The measurements and quantities specified are estimates and provided for information only. The Contractor must verify all locations, dimensions and conditions affecting the work.
1.05 QUALITY ASSURANCE
A. All proposed materials and methods must meet or exceed the current local, state, and federal codes, standards, and regulations applicable to the contract work.
B. All personnel performing work shall be fully qualified and experienced in the type of work they will execute.
1.06 WARRANTIES
A. Building components: Minimum 1-year warranty against defects. Provide a minimum 5-year warranty for workmanship.
B. Prior to beginning work, report to the COR any conflict in warranty requirements, work scheduling or material availability before proceeding with the work.
1.07 MATERIAL HANDLING
A. Deliver materials to the job site as per COR instructions. Comply with all manufacturers’ recommendations for storage, protection and handling.
PART 2 - MATERIAL
2.01 GENERAL
A. Use new materials except as otherwise approved by the Contracting Officer (CO).
2.02 REQUIRED SUBMITTALS AND APPROVALS
A. LIST OF REQUIRED SUBMITTALS
1. Contractor Liability Insurance
2. Warranty Information
B. CHANGES TO MATERIAL REQUIREMENTS
1. Any proposed changes by the Contractor to the construction materials shall be submitted in writing to the COR
PART 3 - EXECUTION OF WORK
3.01 GENERAL
A. SERVICE INTERRUPTION
1. Indicate by work schedule expected periods of construction to avoid conflict with operations.
B. SITE INVESTIGATION
1. The Contractor is responsible for investigating site conditions in the vicinity of the required work for any hazards or obstacles which may increase time or cost of the work.
C. CHANGES TO CONSTRUCTION METHODS
1. Any proposed change by the Contractor to the specified construction methods and manufacturer’s instructions must be submitted in writing to the CO along with the justification for the proposed change. Approval from the CO is required for changes in specified construction methods.
D. PROTECTION OF WORK SITE
1. Work site is not protected and is open with no fencing.
2. Maintain the work area and approaches clean and free from trash and debris to reduce interference with ongoing maintenance operations.
3. Provide a safe bypass for NPS employees, and contractor’s personnel.
3.02 PROJECT CLOSEOUT
A. CLEANUP
1. Remove all tools, equipment, excess materials, construction debris, and trash from the project site. Leave project site clean and ready for use at the time of final inspection.
2. Legally dispose of all excess and unusable materials at authorized disposal facilities.
B. FINAL INSPECTION AND ACCEPTANCE OF WORK
1. When all work including any site restoration and cleanup has been completed, the Contractor shall contact the COR to arrange the final inspection.
2. The Contractor shall be notified of any deficiencies found during the final inspection. After all deficiencies have been corrected and all required closeout submittals have been forwarded to the COR, the CO will issue a letter of final acceptance and request the release of claims.
C. CLOSEOUT SUBMITTALS
A. Provide to the COR the following closeout submittals and any other closeout submittals required by the CO:
1. Cut-Sheet Binder: Submit one binder with all manufacturer product information and cut-sheets for all materials installed under this contract. Label binder with project title and include one “contents” page.
PART 4 – PAYMENT
1. Final payment shall be processed upon confirming all noted contractor performance deficiencies have been satisfactorily corrected.
PART 5 – POC’s
1. Project COR will be Joseph Lamm, Supervisory Facility Operations Specialist, Colonial National Historical Park, Cell: 757-272-9847, Email: Joseph_Lamm@nps.gov
2. Alt POC Matt Henderson, Supervisory Facility Operations Specialist, Colonial National Historical Park, Email: Matt_Henderson@nps.gov image1.png
File details come from the government source that posted it. Updated .