B08 Solicitation_Attach_1_ Specification.docx

DOCX document 158 KB Posted

Attached to
THRO PURCHASE FENCING MATERIALS
Solicitation number
140P6321Q0044
Issued by

View the file

Other files

File Type Posted
B08 Solicitation_Attach_3_Pricing Schedule.xlsx XLSX spreadsheet
Sol_140P6321Q0044.pdf PDF
B08 Soilcitation_Attach_2_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Purchase Fencing Materials

1. Project Location and Identifications

North Unit of Theodore Roosevelt National Park. The North Unit is located approximately 11 miles south of Watford City, North Dakota.

North Unit Address:
208 Scenic Dr Watford City, ND 58854

2. Scope of Work The project consists of purchase and delivery of fence materials. All materials will be delivered to the North Unit’s Mix Pit. Mix Pit location is identified on the overhead map below (Attachment A)

3. Materials Specifications

- 9’ Steel Posts;

- Chicago Heights Steel Brand or approved equivalent
-Quantity- 1,800 posts
- 9’ length

- U channel Design,

- Finish- Baked on green enamel

- Steel Requirement: ASTM A-499 Grade 60 / 60,000 psi minimum yield strength / 90,000 psi minimum tensile strength / -Punch holes must be 3/8” diameter, on 1" centers, starting 1" from the top of post -Posts must be produced from recycled steel -Treated Blunt Wood Posts

- Quantity- 524 posts -Treatment Type: Pressure Treated with Chromate Copper Arsonate (CCA)

- 6” Diameter -10’ length -Woven Wire -Red Brand or approved equal

- Quantity- 220 rolls

-11 Gauge top and bottom wire / 14 Gauge filler wire
-Dimensional Data: (Monarch knot / Hinged Joint)
- Minimum of 24 horizontal filler wires between top and bottom wires
- Graduated horizontal wire spacing
- 165’ Roll Length
- 72” Roll height
-Class #1 Galvanization

-Horizontal Steel Brace

- Quantity: 330 braces

- Horizontal Brace shall be constructed of 16 Ga Steel Square Tubing and include 1/8” thick steel mounting plate with drilled holes to accommodate two 5/16” lag screws which shall be used to attach to wood posts

- Horizontal steel brace shall telescope, thereby accommodating work post spacing from 6’0”(Min) to 8’0” (Max)

- Mounting Plates shall be fillet welded to the square tubing

4. Responsibility Contractor is responsible for verifying all measurements to ensure materials are delivered as per the specification.

5. Hours of Operation Delivery must be arranged during normal business hours, 7:00am to 4:30 pm, Monday thru Friday

Attachment A – Material Delivery Location image1.PNG

File details come from the government source that posted it. Updated .