This is a Request for Quotation (RFQ) for asbestos abatement services at the Little Pend Oreille National Wildlife Refuge in Colville, Washington. The solicitation is a total small business set-aside for removing approximately 192 square feet of mud texture containing 1-3% chrysotile asbestos from the Q40 building bathroom, along with additional clean-up and clearance sampling. The work includes removing baseboards, cleaning ventilation ducts, wet wiping horizontal surfaces, vacuuming carpeted areas, and performing clearance sampling.

The solicitation (No. 140FS125Q0095) requires quotations to be submitted by June 17, 2025, at 1700 Eastern time via email to Oscar_orozco@fws.gov. The contract will be awarded on a firm-fixed-price basis to the lowest-priced technically acceptable offeror. The NAICS code is 562910, with a small business size standard of $25 million. Contractors must be registered in the System for Award Management (SAM) and provide a cover letter, equipment list, and documentation of technical acceptability. Performance is required to be completed by July 31, 2025.

View the file

Other files

File Type Posted
Sol_140FS125Q0095.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Little Pend Oreille National Wildlife Refuge SOLICITATION NO. 140FS125Q0095

FWS

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued.

U.S. Fish and Wildlife Service, Little Pend Oreille National Wildlife Refuge has a requirement for abatement services to be performed at the Little Pend National Wildlife Refuge 1310 Bear Creek Road Colville WA 99114. Performance is required to be completed by July 31, 2025.

This Request for Quotation (RFQ) is a Total Small Business Set Aside requirement and is conducted under the procedures of FAR Parts 12 and 13, incorporating provisions and clauses in effect through Federal Acquisition Circular 2025-04. The NAICS code is 562910, PSC F108 and the small business size standard is $25 Million.

Instructions All responsible sources may submit a quote, which shall be considered by the agency. Award will be made as a firm-fixed-price contract. The basis of award is the lowest price technically acceptable. The vendor that submits the lowest priced quote and documentation of technical acceptability for the services will be awarded the firm fixed priced contract. Award will be made to a responsible source pursuant to FAR subpart 9.1.

Technical Acceptability: Technical Acceptability (To include Past Performance in CPARS/FAPIIS)

1. Technical Acceptability

a. Provide a cover letter outlining general information regarding your company’s history, organizational structure, size, primary expertise, e-mail address, website address, and how your offer meets all specifications as outlined in the statement of work. (Maximum two pages, one-sided)

b. Provide a list of related equipment/supplies in the Offeror’s inventory related to the work requirement sufficient for successful contract performance.

The Contractor must submit documentation of applicable technical acceptability with their quote.

Please submit your quotation (showing unit and total price) on company letterhead or the enclosed pricing form with SAM.gov UEI code, and point of contact phone number and e-mail address. Refer to FAR provision 52.212-1 Instructions to Offerors – Commercial Items for additional submission guidance, and include a copy of FAR provision 52.212-3 Offeror Representations and Certifications -- Commercial Items with applicable sections completed.

Solicitation Questions Due: June 10, 2025 1600 Eastern to Oscar_orozco@fws.gov Quotes Due: June 17, 2025 1700 Eastern E-Mail Quote Submission: Oscar_orozco@fws.gov

In order to have a quote considered for award, respondent must be registered at the System for Award Management (SAM) website (https://www.sam.gov) as an active vendor by the time an award decision is necessary.

Bid Form for Quarters 40 – LPO NWR Abatement and Clean-up

Task # Description Estimated Quantity

Rate Total

Task 1 Asbestos Notification Permits S

Task 2A Quarter 40 – LPO NWR

Abate approximately 192 square feet of mud texture on cement wall with 1- 3% chrysotile asbestos in bathroom

Clean ventilation ducts throughout house

Mop or wet wipe all horizontal hard flat surfaces through house.

Vacuum all carpeted surfaces with HEPA Vacuum

Clearance sampling $

Total $

Task 3 Abatement Report and documentation of disposal of asbestos material

Lump Sum Bid Total Task 1-3 $

STANDARD FORM 36, JULY 1966 REF NO OF DOC BEING CONT'D PAGE 1 OF 1

GENERAL SERVICES ADMINISTRATION

FED PROC. REG. (41 CFR) 1-16.101

NAME OF OFFEROR OR CONTRACTOR

BID SCHEDULE

ITEM

NO.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Furnish all labor, tools, equipment, materials, superintendence and transportation necessary to construct the project described in Block 10 of Page A1, Solicitation, Offer, and Award, Standard Form 1442 in accordance with the Technical Specifications, Drawings, and terms and conditions contained herein as follows:

SCHEDULE I – Asbestos Removal

I - 1

Asbestos abatement to include but is not limited to the removal

LS

of asbestos containing material from Little Pend Oreille NWR Quarter Number 40:

a) Abate approximately 192 square feet of mud texture on cement wall with 1-3% chrysotile asbestos in bathroom.

1. Remove baseboards to abate mud behind baseboards.

2. Clean ladder and tools that can be wiped down.

3. Clean vacuum discuss with COR if not feasible.

b) Abatement (Clean-up) the following areas as abatement work on the 192 square feet mud texture was not done in containment or wetted prior to disturbance:

1. Clean ventilation ducts throughout house.

2. Mop or wet wipe all horizontal hard flat surfaces throughout house.

3. Vacuum all carpeted surfaces with HEPA Vacuum.

c) Clearance sampling after abatement and clean-up completed.

TOTAL SCHEDULE I

If estimated quantities are listed, Bidders must only bid on the estimated quantities listed. These quantities indicated are the Government's best estimate of actual quantities needed to complete the work. Payment will be made for the actual amount of work done on the basis of unit or lump sum prices bid.

PROJECT CONSISTS OF: The asbestos abatement work includes abatement of 192 square feet of mud texture on cement wall with 1-3% chrysotile asbestos and abatement (clean-up) of potentially contaminated surfaces from partial abatement of 196 square feet of mud texture on cement not performed in containment and/or using wet method at the Q40 Building located at Little Pend Oreille NWR in Colville, WA 99114. Contractor must coordinate work with Refuge. The building is unoccupied and has power and water.

PROJECT LOCATION: Little Pend Oreille NWR Quarter 40 Building 1310 Bear Creek Rd.

Colville, WA 99114

Page J - 1

PART III, SECTION J

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

INVITATION NO. xxxxxxxxx

INDEX

TECHNICAL PROVISIONS/SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01100 SUMMARY OF THE WORK

SECTION 01310 PROJECT COORDINATION

SECTION 01330 SUBMITTALS

SECTION 01420 DEFINITIONS AND STANDARDS

SECTION 01770 PROJECT CLOSEOUT

DIVISION 2 – SITE WORK

SECTION 02200 HAZARDOUS MATERIALS REMOVAL

ATTACHMENTS

1) Location of Work, Photos, and Estimated Square Footage

2) Quarters Number 40, Little Pend Oreille NWR – Limited Asbestos Survey

3) Washington State Department of Labor and Industries Asbestos Abatement

Notice of Intent Form

4) Washington State Department of Ecology Asbestos Abatement

Notification

5) PRECONSTRUCTION SAFETY CHECKLIST

DIVISION 1

GENERAL REQUIREMENTS

SECTION 01100

SUMMARY OF THE WORK

01100-5

PART 1 – GENERAL

1.1 Project Title: Asbestos Abatement and Clean-Up at Quarter 40

Building, Little Pend Oreille NWR

1.2 Work Under These Specifications: The asbestos abatement work includes but is not limited to: the removal and clean-up of asbestos containing material from Quarter 40, Little Pend Oreille NWR, Colville, WA 99114 including;

a) Abate approximately 192 square feet of mud texture on cement wall with 1-3% chrysotile asbestos in bathroom.

1) Remove baseboards to abate mud behind baseboards.

2) Clean ladder and tools that can be wiped down.

3) Clean vacuum discuss with COR if not feasible.

b) Abatement (Clean-up) the following areas as abatement work on the 192 square feet mud texture was not done in containment or wetted prior to disturbance:

1) Clean ventilation ducts throughout house.

2) Mop or wet wipe all horizontal hard flat surfaces through house.

3) Vacuum all carpeted surfaces with HEPA Vacuum.

c) Clearance sampling after abatement and clean-up completed.

This work will not be measured for payment and shall be performed on a lump sum basis.

1.3 Location and Inspection Of Site

The work site is located at Quarter 40, Little Pend Oreille NWR, 1310 Bear Creak Rd., Colville, WA 99114. The mailing address is shown on the Solicitation, Offer, and Award (Standard Forms 1442 or, 18 block 9) as attached to this Invitation. Kelly Moroney, Refuge Manager may be contacted for further information at the Inland Northwest NWR Complex at 26010 South Smith Road, Cheney, WA 99004-9326 by telephone at

(541) 270-1864, or by e-mail: kelly_moroney@fws.gov. The site Point of Contact is Kelly Connall and he can be reached by phone (509)563-9498 or by e-mail: kelly_connall@fws.gov

All prospective bidders/quoters, contractors, subcontractors, and related persons are encouraged to visit the site(s) of the proposed Work and to assess the location(s) and extent mailto:kelly_moroney@fws.gov mailto:kelly_connall@fws.gov

SECTION 01100

01100-6 of the Work prior to submitting bids/quotes. Persons may inspect the site by contacting Kelly Connall, Engineering Equipment Operator.

1.4 Work Not Included In This Contract

A. Only work identified above is included in this contract.

1.5 Items Provided By The Government

A. No materials or equipment shall be furnished by the

Government under this Contract.

1.6 Temporary Facilities

A. Temporary toilet facilities are not provided as part of this contract.

B. Electric utilities are provided on the site.

C. Potable water is available at the site.

D. Maintain and restore all government roads, service areas and utilities used to pre-construction conditions.

1.7 Site Access and Right of Way

A. The construction access limits on Government property will be established by the Government and the Contractor shall be responsible for complying with these limits and governing all work accordingly. The work site is in a restricted area that is not open to public access and there are no other ongoing activities adjacent the work site.

B. All bidders are reminded that they are responsible for contacting the local entity such as township, county, or state having jurisdiction in the project vicinity to ensure bidders/quoters are aware of any requirements of the local entity. These requirements are between the entity and the bidder. Load limits and other restrictions shall be obeyed. If the Contractor proposes to cross private property, permission must be obtained from the owner to use private property or roads in the conduct of the Work.

C. Work scheduled on Saturdays, Sundays, Federal Holidays or other than normal working hours shall be approved

SECTION 01100

01100-7 in advance by the Government.

1.8 Safety - In addition to FAR 52.236-13 Accident Prevention

A. Contractor shall fill out and submit the “Preconstruction Safety Checklist” to the Contracting Officer (CO) prior to beginning construction.

B. The contractor shall designate a safety officer to ensure a safe work site. The safety officer shall perform daily work site inspections to assure compliance with all safety regulations and standards.

C. The Contractor’s Safety Plan shall be available on- site.

The Contractor shall provide Safety Data Sheets (SDS) for all hazardous materials brought on- site. SDS shall be made available in a conspicuous location and a copy shall be provided to the Refuge.

D. All equipment and work activities shall comply with

OSHA Regulations and all accidents incidental to work performed under this contract shall be reported in accordance with OSHA reporting requirements.

Additionally, a copy of the accident report shall be provided to the Contracting Officer.

E. The contractor shall provide and install barricades, signs, or other warning devices to delineate the construction area and restrict public access to the construction site. Follow Manual of Uniform Traffic Control Devices (MUTCD).

F. Provide at least one non-freezing-type fire extinguisher in each workshop and shed used for storage of materials on the premises. Place in location readily accessible to workers.

G. Provide at least one non-freezing-type fire extinguisher of the appropriate class for each group of workers performing flammable procedures.

SECTION 01100

01100-8

H. Provide and maintain a basic first aid kit for use of workers.

(a) Provide first aid supply commensurate with size of project with items necessary for first aid treatment of all injuries. The first aid supply shall include items identified on SDS (see paragraph B of this section) in applicable locations.

(b) Advise all workers of the location of first aid supplies.

(c) Post telephone numbers of nearest hospital or ambulance service and fire station in conspicuous location. Advise all workers of location of telephone numbers.

I. Provide necessary Personnel Protective Equipment (PPE) as identified by SDS and OSHA regulations. Provide documentation, workers have been trained in use of PPE prior to individual use.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

(END OF SECTION 01100)

SECTION 01310

PROJECT COORDINATION

01310-

PART 1 - GENERAL

1.1 Jobsite Administration - Superintendence, Subcontract

administration and Quality Control, is the responsibility of the Contractor.

A. Final decisions relative to items in conflict shall be made by the Contracting Officer.

B. The Government shall have the authority to temporarily suspend the Work for such time as necessary because of the failure on the part of the Contractor to perform any of the provisions of the Contract. No extension of contract performance time will be permitted until the Government determines that the deficiencies in performance, which caused the temporary suspension, have been corrected.

C. The Contractor shall have responsible superintendence on site during all project operations. Contractor shall notify Government of any changes of superintendents.

D. The Contractor shall notify the COR at least ten (10) days prior to the anticipated date of completion of all Work specified herein. Upon completion of the Work, the COR shall proceed with the final inspection which shall be completed as promptly as practicable. The time required for such inspection and for performing any corrective Work shall be included in the contract performance time.

1.2 Modification/Change Order procedures

A. In the event of the need for a Change Order, the

Contractor will receive a letter requesting a price quote for proposed changes to the Contract.

For evaluation purposes, the Contractor's quote shall be broken down to show the costs of labor and materials for each proposed category of Work include with the change, along with the total cost for Contractor's overhead, profit, and bond for the proposed changes.

SECTION 01310

PROJECT COORDINATION

01310-

B. All Contract time extensions required as a result of a proposed change must be justified and supported in detail at the time of the proposal.

1.3 Preconstruction Conference

A. Soon after award of the Contract and prior to commencing construction, the Contractor and any subcontractors shall attend a preconstruction conference with representatives of the Government. Timely notification of the meeting will be given to the Contractor. Time, date, and place of the conference will be determined by the Contracting Officer. Requirements pertaining to Contract administration, construction operations and the project schedule will be discussed. The project schedule shall be in accordance with Section 01330.

The Preconstruction Safety Checklist shall be submitted for review during this conference.

1.4 Progress Meetings

A. Periodic general project meetings will be conducted with a representative of the Contractor at the project site or by telephone by the Government's representative for the purpose of coordinating, expediting, and assessing the work progress.

B. The Contractor shall provide reports of progress on the project, discuss the work schedule for the coming period and present all conflicts, discrepancies, or other difficulties for resolution. A record of discussions and decisions will be prepared by the Government and distributed to those attending and others affected.

C. The contractor shall provide daily status reports with photos when abatement activity is being conducted.

PART 3 - EXECUTION (not Applicable)

(END OF SECTION 01310)

SECTION 01330

SUBMITTALS

01330-1

1.1 Submittal Register:

A. The Contractor shall provide all required submittals to the COR within 30 days of award except for items noted otherwise on the submittal register.

B. Furnish a minimum of one electric copy and one hard copy of all required submittals.

C. The approval of submittals shall not relieve the Contractor to comply with the terms and conditions of the Contract Drawings and Specifications. The Contractor shall be responsible to determine correct dimension, design, connection, detail and satisfactory construction of all Work.

1.2 Project Schedule: Contractor shall provide as required by

Federal Acquisition Regulation (FAR) clauses. *

1.3 Price Breakdown - Lump Sum Items: Contractor shall provide as required by FAR clauses. *

1.4 Subcontractor's List

A. Submit a list of subcontractors who will be working on the project.

1.5 Submittal of Progress Payment Certificate: Contractor shall provide as required by FAR clauses. *

1.6 Guarantees, Warranties And Certificates: Refer to Section

01770

1.7 Waste Manifests

A. The Contractor shall submit copies of all waste manifests.

SECTION 01330

SUBMITTALS

01330-2

B. Manifests shall state type of waste (i.e., construction debris, hazardous asbestos, etc.), location of disposal, landfill designation, EPA registration of landfill, and EPA registration for transportation of any hazardous wastes.

* The applicable FAR clauses will be provided in full text to the resultant contractor at the pre-construction conference.

(END OF SECTION 01330)

SECTION 01420

DEFINITIONS AND STANDARDS

01420-1

1.1 Regulatory Requirements

A. All Work shall be accomplished in strict accordance with the regulations, codes, and laws in effect at the time the Work is performed for the location where it is to be performed. All completed construction shall comply with OSHA, EPA, NFPA, and ADA regulations.

1.2 Means and Methods

A. Means and methods used in the performance of this

Contract must be in accordance with all applicable Federal Acquisition Regulations in addition to OSHA regulations, 29 Code of Federal Regulations, acceptable industry practices as recognized by societies, associations, building codes, manufacturers’ specifications and any applicable state safety and health requirements.

1.3 Permits

A. All permits required to support construction activities such as asbestos notification, road permits for oversize, overweight vehicles and equipment, bridge permits, and utility hookup permits, shall be obtained and paid for by the Contractor.

(END OF SECTION 01420)

SECTION 01770

PROJECT CLOSEOUT

01770-1

1.1 Final Inspection

A. The Contractor shall request a final inspection in writing at least ten (10) days prior to the anticipated date of completion.

B. Work will not be considered ready for final inspection until all the Work has been completed and the Contractor has certified that all items are properly operating and in strict compliance with all Contract terms and conditions.

C. The Contractor or the project supervisor shall be at the job site during the final inspection.

1.2 Test

A. Provide any regulatory acceptance documents in cases of cleanup. The contractor will need to provide a clearing sample for the Quarter 40 Building after abatement and clean-up is completed using a certified asbestos lab. Samples shall be taken at a minimum:

1) Bathroom

2) Location immediately outside of bathroom.

3) And two additional samples located on each floor of the quarters.

1.3 Guarantees, Warranties and Certificates

A. The Contractor will submit all guarantees, warranties and certificates to the Government prior to final payment.

B. The Government requires a 100% warranty for a period of one full year after final acceptance. Items of Work found defective during the warranty period will be replaced at no cost to the Government and the warranty for that particular part of the Work shall automatically extend for one full year beyond the completion date of repairs.

SECTION 01770

PROJECT CLOSEOUT

01770-1

(END OF SECTION 01770)

1.1 SUMMARY:

A. The requirements of this section shall govern all site preparation, hazardous material removal, and disposal operations.

B. The Contractor shall provide all labor, tools, equipment, and materials necessary to prepare the site for removal, clean-up, and disposal of hazardous materials.

C. All work shall be completed in accordance of all Federal, State and Local regulations.

D. All permits shall be acquired by the Contractor at the Contractors expense.

1.2 QUALITY ASSURANCE:

A. Removal of Asbestos Containing Building Material (ACM) shall be conducted in accordance with the following:

1. NESHAP - 40 CFR Part 61, Subpart M – National Emission Standard for Asbestos

2. TSCA - 40 CFR Subpart D, Section 763 – Asbestos

3. 29 CFR 1910.1001: General Industry Occupational Safety and Health Standards

4. 29 CFR 1926.1101: Safety and Health Regulations for

Construction

5. Washington Administrative Code (WAC) 296-62-077, Asbestos, tremolite, anthophyllite, and actinolite

6. Washington Administrative Code Asbestos Removal &

Encapsulation Chapter 296-65 WAC

B. A licensed Washington state certified asbestos removal service shall be obtained for asbestos removal, clean-up, and disposal operations.

C. Contractor shall ensure all employees are current on

NESHAP training prior to allowing employees on-site to conduct asbestos removal operations.

1.3 SUBMITTALS:

A. Submit the credentials certifying that the Asbestos Abatement Company is currently certified to remove ACM’s in the state of Washington by Washington State Department of Labor and Industries.

B. Submit certificates of all personnel who are to work at the site are currently certified to remove ACM’s in the state of Washington by Washington State Department of Labor and Industries.

C. Submit the name and certification of the Waste Disposal

Site for which asbestos containing materials are to be disposed.

D. Submit the name and certification of the hazardous materials Transport Company used to haul ACM materials.

E. Submit the name and certification of lab that will be used to analyze clearing sample for asbestos.

1.4 CONDITIONS

A. The structure is schedule to be used as housing for the refuge.

PART 2 – PRODUCTS N/A

PART 3 – EXECUTION

3.1 GENERAL:

A. Contractor shall complete and submit at least 10 days before the start of the project the State of Illinois Demolition/Renovation/Asbestos Project Notification form to the State of Washington by Washington State Department of Labor and Industries and Washington State Department of Ecological Services.

B. Contractor shall prepare for asbestos removal according to all Federal, State of Washington, and OSHA rules and regulations.

C. ACM material shall be placed into containers for transportation to landfill. All containers shall be lined with two layers 6 mil polyethylene per Federal EPA and State of Washington Department of Ecology rules and regulations. All containers shall be properly labeled for transportation of hazardous materials.

1. All ACM’s shall be disposed of in a state certified landfill certified to accept ACM’s.

D. All ACM’s shall be transported per Washington State Department of Transportation (WSDOT) rules and regulations.

E. Provide the refuge manager and CO/COR written certification of compliance that all ACM’s have been removed.

1. Provide clearing sample for Quarters 40 Building once abatement is completed.

(END OF SECTION 02220)

26March2025 Services Under SAT

Clauses

52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (NOV 2023)

---Addendum to 52.212-4---

DIAR 1452.237-70 INFORMATION COLLECTION - DEPARTMENT OF THE INTERIOR (JUL

1996)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation: https://www.acquisition.gov/far Department of the Interior Acquisition Regulation: https://www.acquisition.gov/diar

(End of clause)

DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE

PROCESSING PLATFORM (IPP) (FEB 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:

https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

PDF Vendor-created invoice

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone

(866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

http://www.acquisition.gov/far http://www.acquisition.gov/diar http://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

(End of Local Clause)

DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (DEC

2015)

1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.

b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

c) All information provided should be reviewed for accuracy prior to submission.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

6) The following guidelines apply concerning your use of the past performance evaluation:

a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or http://www.cpars.gov/ http://www.cpars.gov/ submit the form through CPARS, contact the CO for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

52.204-28 Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts (Dec 2023)

52.204-29 Federal Acquisition Supply Chain Security Act Orders—Representation and Disclosures (Dec 2023)

52.204-30 Federal Acquisition Supply Chain Security Act Orders—Prohibition (Dec 2023)

52.217-2 CANCELLATION UNDER MULTI-YEAR CONTRACTS (OCT 1997)

52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND

CONSTRUCTION CONTRACTS (AUG 2018)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days prior to PoP expiration.

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years 6 months.

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services (Jan 2025) (DEVIATION FEB 2025)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108- 78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.]

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/52.203-13#FAR_52_203_13

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

_X_ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (6) [Reserved].

__ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

_X_ (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).

_X_ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub.

L. 115–390, title II).

_X_ (11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title II).

_X_ (ii) Alternate I (Dec 2023) of 52.204-30.

_X_ (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025) ( 31 U.S.C. 6101 note).

__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).

__ (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C. 657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (17) [Reserved]

__ (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-6.

__ (19)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-7.

https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.204-14#FAR_52_204_14 https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 https://www.govinfo.gov/link/uscode/31/6101 https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7

__ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)( 15 U.S.C. 637(d)(2) and (3)).

__ (21) (i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) ( 15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

__ (iv) Alternate III (Jun 2020) of 52.219-9.

__ (v) Alternate IV (Jan 2025) of 52.219-9.

_X_ (22) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (Mar 2020) of 52.219-13.

_X_ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) (15 U.S.C. 657f).

__ (26) (i) 52.219-28, Postaward Small Business Program Rerepresentation (Jan 2025) (15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (Mar 2020) of 52.219-28.

__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).

__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) ( 15 U.S.C. 644(r)).

_X_ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).

_X_ (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

_X_ (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2025)( E.O.

13126).

_X_ (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

_X_ (34) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

__ (ii) Alternate I (Feb 1999) of 52.222-26.

__ (35) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (ii) Alternate I (Jul 2014) of 52.222-35.

_X_ (36) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-29#FAR_52_219_29 https://www.acquisition.gov/far/52.219-30#FAR_52_219_30 https://www.acquisition.gov/far/52.219-32#FAR_52_219_32 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section644&num=0&edition=prelim https://www.acquisition.gov/far/52.219-33#FAR_52_219_33 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.federalregister.gov/executive-order/13126 https://www.federalregister.gov/executive-order/13126 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim

__ (ii) Alternate I (Jul 2014) of 52.222-36.

__ (37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

_X_ (39) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O.

13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ (40) 52.222-54, Employment Eligibility Verification (Jan 2025) ( Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

__ (41) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

_X_ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).

_X_ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).

_X_ (44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).

_X_ (45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).

_X_ (46) 52.223-23, Sustainable Products and Services (May 2024) (DEVIATION FEB 2025) ( 7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).

__ (47) (i) 52.224-3 Privacy Training (Jan 2017) ( 5 U.S.C. 552 a).

__ (ii) Alternate I (Jan 2017) of 52.224-3.

_X_ (48) (i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).

__ (ii) Alternate I (Oct 2022) of 52.225-1.

__ (49) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19 U.S.C.

3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I [Reserved].

__ (iii) Alternate II (Jan 2025) of 52.225-3.

__ (iv) Alternate III (Feb 2024) of 52.225-3.

__ (v) Alternate IV (Oct 2022) of 52.225-3.

__ (50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-54#FAR_52_222_54 https://www.federalregister.gov/executive-order/12989 https://www.acquisition.gov/far/22.1803#FAR_22_1803 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-23#FAR_52_223_23 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2112&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3805&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section4001&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-5#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim

_X_ (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

_X_ (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) ( E.O. 13513).

__ (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

_X_ (57)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .