B08_SOL_Attachment_2_Price_Schedule_CGC_WAESCHE_(WMSL-751)_DS.xls
XLS spreadsheet 40 KB Posted
- Attached to
- USCGC WAESCHE (WMSL 751) DOCKSIDE REPAIRS FY2023
- Solicitation number
- 140D0423Q0054
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC WAESCHE (WMSL-751) DOCKSIDE AVAILABILITY FY2023 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-01 | Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | JOB | 1 | $0.00 | |
| D-02 | High Purity Water Tank, Clean And Inspect | JOB | 1 | $0.00 | |
| D-03 | Circuit Breakers (Draw Out), Inspect and Test | JOB | 1 | $0.00 | |
| D-04 | Fire Detection System, Inspect and Test | JOB | 1 | $0.00 | |
| D-05 | Air Conditioning Plants, Groom | JOB | 1 | $0.00 | |
| D-06 | Refrigeration Plant, System Groom | JOB | 1 | $0.00 | |
| D-07 | Temporary Services, Provide | JOB | 1 | $0.00 | |
| D-08 | Cargo Handling Elevator, Annual Inspection and Test, Perform | JOB | 1 | $0.00 | |
| D-09 | Forward and Aft Capstans, Level 2 Overhaul | JOB | 1 | ||
| D-10 | Dual Point Davit ,Biennial Maintenance, Perform | JOB | 1 | ||
| D-11 | Folding Boom Cranes, Biennial Maintenance, Perform | JOB | 1 | $0.00 | |
| D-12 | Incinerator Clean, Inspect and Test | JOB | 1 | $0.00 | |
| D-13 | Oily Water Separator (OWS) System, Inspect and Groom | JOB | 1 | $0.00 | |
| O-14 | Tanks (Aviation Fuel Stowage and Overflow), Preserve (Partial)(Optional) | JOB | 1 | $0.00 | |
| O-14A | Tank 4-70-2-J | JOB | 1 | ||
| O-14B | Tank 4-67-2-J | JOB | 1 | ||
| O-14C | Tank 5-70-0-J | JOB | 1 | ||
| O-14D | Tank 5-64-0-J | JOB | 1 | ||
| D-15 | Decks, Preserve (Full) | JOB | 1 | $0.00 | |
| D-16 | QAATD/QAWTD, Replace (NSC2)-Remaining | JOB | 1 | $0.00 | |
| D-17 | HVAC System (Port Aft Capstan), Modify | JOB | 1 | $0.00 | |
| D-18 | Steering Actuator and Hydraulic Power Unit (HPU), Overhaul | JOB | 1 | ||
| D-19 | Fire Prevention, Provide | JOB | 1 | ||
| O-0A | Composite Labor Rate | Hour | |||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(5/26/2022) Draft-1 - Page &P of &N
File details come from the government source that posted it. Updated .