B08_SOL_140D0425Q0180_OAS_Hangar_Lights.pdf

PDF 587 KB Posted

Attached to
Repair Motion Light Sensors for OAS Anchorage
Solicitation number
140D0425Q0180
Issued by

About this file

This is a Request for Quotation (RFQ) issued by the Department of the Interior's Office of Aviation Services (OAS) in Anchorage, Alaska for repair of motion sensor lights in their secondary hangar facility. The requirement involves troubleshooting and repairing faulty motion sensor lights that currently have a 5-10 foot delay when triggered, creating a safety hazard when personnel enter the hangar in darkness. The period of performance is 45 days from award.

This is a total small business set-aside under NAICS code 238210 (Electrical Contractors) with a size standard of $19M. Quotes are due by 4:00pm AST on February 19, 2025, with questions due by February 6, 2025. A site visit is scheduled for February 5, 2025 at 9:00am AST at 4405 Lear Court, Anchorage. Required submissions include a 1-2 page executive summary and detailed pricing schedule with hourly labor rates based on DOL Wage Determination 2015-5681 Rev 22 (Electronics Technician Maintenance III at $42.69/hr). The solicitation uses FAR Part 13 Simplified Acquisition Procedures and includes two CLINs - an initial inspection CLIN and a repair CLIN to be priced after inspection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Document No.

RFQ 140D0425Q0180

OAS-Hangar Lights Repair

Motion Sensor Lights Repair for the Secondary Hangar for the Department of the Interior, Office of Aviation Services

Solicitation Notes

This solicitation is in accordance with FAR part 13 Simplified Acquisition Procedures.

1. This is a Request for Quotation (RFQ) under solicitation number 140D0425Q0180. The solicitation document and incorporated provisions and clauses are those in effect through the Federal Acquisition Regulation (FAR), and the Office of Aviation Services (OAS) in Anchorage, Alaska.

2. This announcement constitutes the only solicitation.

3. The anticipated period of performance will be a total of 45 days from date of award to allow time for troubleshooting and ordering any necessary materials and equipment.

4. Quotes shall be submitted to Nicole Johnson, at Nicole_Johnson@ibc.doi.gov, no later than 4:00pm, AST on Wednesday February 19, 2025. All questions shall be submitted no later than 1:00pm, AST, Friday February 6, 2025, to Nicole Johnson Nicole_Johnson@ibc.doi.gov. It is the Contractor’s responsibility to ensure their quote is received by the due date and time.

5. As an Addendum to FAR 52.212-1, Contractor shall submit all items in accordance with the Supplemental Information by the solicitation closing date and time. The Contractor SHALL provide all required documents with submission of initial quote. This includes:

1-2 Page Executive Summary demonstrating the vendor’s understanding of the requirement and how they plan to repair any identified faulty motion sensor lights.

Quote Pricing Schedule- To be viable for award, the price submission must be determined complete and reasonable.

An hourly break down of labor hours and labor rate is required to support the inspection of the existing motion sensor lights system and an hourly rate for the repair of the faulty motion sensor lights. The quoter shall identify which labor category per the applicable WD they are utilizing.

U.S. Department of Labor (DOL) Wage Determination (WD) 2015-5681 Rev. 22 is applicable to this requirement, and labor category 23183-Electronics Technician Maintenance III is being utilized for this procurement.

If all required documents noted above are not provided with the quote submission, your quote may not be considered for award.

6. This RFQ is a Total Small Business Set-Aside in accordance with FAR Clause 52.219-6 under North American Industry Classification System (NAICS) Code 238210: Electrical Contractors mailto:Nicole_Johnson@ibc.doi.gov and Other Wiring Installation Contractors, with a size standard of $19,000,000. Please identify your business size in your response based on this standard.

7. Period for acceptance of quotes. The Contractor agrees to hold the prices in its quote firm for 60 calendar days from the date specified for receipt of quotes.

8. Site visit: A site visit is scheduled at 4405 Lear Court Anchorage AK on Wednesday February 5th at 9:00am Alaska Standard Time (AST). If you have any questions about the site visit, please contact the COR, Bryant Strain at 907-382-1781.

9. System for Award Management (SAM) Registration: An Active SAM Registration is required of all contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.

A. A SAM Unique Entity ID is required for SAM registration.

B. Prospective contractors who have not completed electronic annual representations and certifications at http://www.sam.gov/ in conjunction with required registration in the System for Award Management (SAM) database, shall complete and submit FAR 52.212-3 Alternative 1 Offeror Representations and Certifications - Commercial in SAM to be eligible to receive an award for this solicitation.

10. Contracting Officer:

Nicole Johnson U.S. Department of the Interior Interior Business Center Acquisition Services Directorate Email: nicole_johnson@ibc.doi.gov

11. Contracting Officer’s Representative (COR):

Name: Bryant Strain Department of the Interior, Office of Aviation Services Email: bryant_strain@ios.doi.gov

12. Wage Determination Information: In accordance with FAR Clause 52.222-41(g), the Contractor must notify each service employee working on this contract of the minimum wage and fringe benefits required to be paid pursuant to this contract or shall post a copy of the wage determination and Department of Labor Form WH-1313 in a prominent place at the worksite.

The applicable wage determination is incorporated into the contract. The WH-1313 poster is located at http://www.dol.gov/whd/regs/compliance/posters/sca.htm.In accordance with FAR 52.222-42, In compliance with the Service Contract Labor Standards statute and the regulations http://www.sam.gov/ http://www.sam.gov/ mailto:nicole_johnson@ibc.doi.gov http://www.dol.gov/whd/regs/compliance/posters/sca.htm.

of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.

This Statement is for Information Only. It is not a Wage Determination.

Employee Class Monetary Wage -- Fringe

Benefits Electronics Technician Maintenance III

$42.69

(End of Solicitation Notes)

SECTION A – REQUIREMENT DESCRIPTION

Statement of Work OAS Secondary Hangar Motion Sensor Lights

Customer: Department of the Interior, Office of Aviation Services Alaska

Purpose: The purpose of this statement of work is to repair motion sensor lights in the Office of Aviation Services’ Secondary Hangar.

Where: OAS Secondary Hangar located at 4837 Aircraft Drive Anchorage, Alaska

Background: The motion sensor lights inside OAS’ 5-bay secondary hangar are not functioning properly. When functioning properly, the lights turn on as soon as someone enters through the hangar bay doors. However, currently, there is a delay, and the lights come on when someone is already 5-10 feet inside the hangar. This delay creates a significant safety issue in that anyone entering the hangar bay enters in total darkness, increasing the odds that someone may be injured walking into a plane or plane part due to their inability to see.

Work to be performed:

• Troubleshoot and repair motion sensor lights so that as soon as someone enters through any of the hangar bay doors, the lights come on immediately.

• Complete all work in accordance with all applicable electrical codes.

Work is only to be performed during normal business hours 6:30am – 3:00pm (AST) Monday-Friday.

No government equipment will be supplied.

SECTION B – DELIVERY/PERIOD OF PERFORMANCE

The Point of Contact (POC) for delivery will be named at the time of the award.

SECTION C – INSTRUCTION TO OFFERORS

QUOTATION PREPARATION INSTRUCTIONS:

In order to participate under this acquisition, the Contractor must submit a quotation that addresses both the Technical and Price requirements identified herein. The quotation submission must be sent via email directly to the Contracting Officer.

The vendor will first complete an inspection of the hangar motion sensor lights to determine the labor, equipment and materials required to make the necessary repairs. After determining how best to complete the necessary repairs, the vendor will return to the secondary hangar to make the repairs.

1. Submit a written technical summary not to exceed 2 pages, which includes sufficient detail to demonstrate the Contractor’s understanding of and ability to meet and/or exceed the Factor 1 (Technical) elements in RFQ Section D, Basis for Award.

2. Price quote shall be submitted with completed Quote Pricing Schedule listed below. In addition to the Quote Pricing Schedule, the quoter must also include sufficient detail in a Summary Sheet to support the FFP line-item pricing for CLIN 00010 an hourly breakdown (including any applicable labor categories and estimated labor hours etc.)

required to complete the initial inspection of the hangar lights and motion sensors to determine what repairs will be necessary. The quote shall also include the hourly rate that will be utilized for completing any repairs in CLIN 00011.

NOTE: Any non-price information that is included within the price volume such as labor categories and hours may be considered in performing the technical evaluation.

The Government reserves the right to request additional information as may be necessary to determine the quoter’s qualifications for an award or to clarify any aspects of the technical or price submissions. Such information shall be furnished promptly upon the Government’s request.

The failure to submit any of the information requested in this RFQ may lead to the rejection of your quotation without further discussion.

METHOD OF QUOTE DELIVERY, DUE DATE & TIME:

a. All Quotes shall be submitted to Nicole Johnson, at Nicole_Johnson@ibc.doi.gov, no later than 4:00pm, AST on Wednesday February 19, 2025. All questions shall be submitted no later than 1:00pm, AST, Friday February 6, 2025, to Nicole Johnson Nicole_Johnson@ibc.doi.gov.

Please be advised that it is the quoter’s responsibility to assure the Government receives your submission on or before the specified due date.

SECTION D –EVALUATION OF QUOTES

52.212-2 Evaluation-Commercial Products and Commercial Services (Nov 2021)

a. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

1. Technical Summary

2. Price

Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding acceptability standards for non-cost factors. The Contractor will be selected on the basis of the Government’s evaluation of the quote against the evaluation factor set forth in the solicitation: Technical and Price. The Government will award the contract to the offer that is the best value.

b. A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

Addendum to FAR 52.212-2 -- Evaluation - Commercial Items

1. Basis for Contract Award:

This acquisition will be conducted under the procedures of FAR Part 12 -- Commercial Items and FAR Part13-- Simplified Acquisition Procedures. This acquisition will utilize Technical and Price as evaluation factors. Award will be made to the vendor using Lowest Price Technically Acceptable (LPTA). The Government intends to award without exchanges. However, the Government reserves the right to conduct exchanges if determined necessary by the Contracting Officer (ref. FAR 52.212-2 Addendum, section 1.3).

The Government will review and evaluation the quotation as follows:

2. Evaluation Factors for Award

Factor 1: Technical

Technical Approach (to be included in Executive Summary).

The vendor will be evaluated based on the extent to which their executive summary and approach demonstrates an understanding of the objective, scope, and intent of the requirement; the skills, knowledge and experience that contractor personnel possess; and resources to accomplish tasks. Vendor must adequately demonstrate how they plan to ensure that the equipment is placed back into working order.

The Government will evaluate the quote for technical acceptability on a pass or fail basis.

Partial and/or incomplete quotations will not be accepted.

Factor 2: Price

The quote will be evaluated for price reasonableness, and price will be the determining factor for all acceptable offers. A combination of the techniques and procedures described under FAR Part 13.106-3 will be utilized to ensure the price is fair and reasonable. The Government will evaluate the quote for award purposes by evaluating the total price for the priced CLIN (00010).

Evaluation of the unpriced TBD CLIN will not obligate the Government to exercise the unpriced CLIN. FFP Pricing for CLIN 00011 will be quoted upon vendor completion of CLIN 00010.

Price evaluation of CLIN 00011 to determine reasonableness will be at the discretion of the Government and may be included in a future bilateral modification to the contract.

The Quoter ensured the price is represented in two decimal positions only (example: $0.27, NOT $0.27434)

Summary Sheet. The Summary Statement will be reviewed to ensure there are no concerns with the information and explanations submitted. To be viable for award, the price submission must be determined complete and reasonable.

Offerors must use the Quote Pricing Schedule below:

QUOTE PRICING SCHEDULE

Line Item #

Routine Services Quantity

Unit of Issue

Line-Item Type Price Total Estimate Cost (Estimated quantity times price)

00010 Inspect Hangar

Lights and Sensors

TBD

Hour

Firm-Fixed Price

(FFP)

00011

Repairs to Hangar Light

Sensors

1 JOB

Each

Unpriced at

Award

TBD Upon Completion of

CLIN 00010

TBD Upon Completion of

CLIN 00010

*After CLIN 00010 is completed, the contractor shall submit a revised FFP amount for unpriced CLIN 00011 based on an actual estimate for repairs after the motion sensor light system is inspected.

1. The Vendor shall populate the Extended Price for CLIN 00010 only.

TOTAL (NTE): $

SECTION E –CONTRACT CLAUSES

52.252-2 -- Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at:

https://www.acquisition.gov/

(End of Clause) Incorporated by Reference:

CLAUSE TITLE DATE

52.202-1 Definitions Jun 2020 52.203-17 Contractor Employee Whistleblower Rights Jun 2020 52.204-13 System for Award Management Maintenance Oct 2018

52.204-18 Commercial and Government Entity Code Maintenance Aug

52.204-19 Incorporation by Reference of Representations and Certifications Dec

52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded

Jan 2025

52.212-4 Contract Terms and Conditions - Commercial Products and Commercial Services

Nov

52.222-6 Construction Wage Rate Requirements Aug

52.222-7 Withholding of Funds May

52.222-8 Payrolls and Basic Records Jul 2021 52.222-9 Apprentices and Trainees. Jul 2005

52.222-10 Compliance with Copeland Act Requirements Feb

52.222-11 Subcontracts (Labor Standards) May

52.222-12 Contract Termination-Debarment May

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations

May

52.222-14 Disputes Concerning Labor Standards Feb

52.222-15 Certification of Eligibility May https://www.acquisition.gov/

52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 Jun 2020

52.222-27 Affirmative Action Compliance Requirements for Construction Apr

52.226-7 Drug Free Workplace May

52.229-3 Federal, State, and Local Taxes Feb

52.232-25 Prompt Payment Jan 2017 52.232-39 Unenforceability of Unauthorized Obligations Jun 2013

52.233-1 Disputes May

52.241-2 Order of Precedence - Utilities Feb

52.241-3 Scope and Duration of Contract Feb

52.241-4 Change in Class of Service Feb

52.241-5 Contractor’s Facilities Feb

52.241-6 Service Provisions Feb

52.241-7 Change in Rates or Terms and Conditions of Service for Regulated Services

Feb

52.241-11 Multiple Service Locations Feb

52.242-13 Bankruptcy Jul 1995

Incorporated by Full Text:

52.212-5 Contract Terms and Conditions Required to Implement Statues or Executive Orders -- Commercial Products and Commercial Services (JAN 2025)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

https://www.acquisition.gov/far/52.203-19#FAR_52_203_19

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L.

115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.]

_x_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

_x_ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

_x_ (4) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C.

4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

_x_ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (6) [Reserved].

https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim

_x_ (7) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111- 117, section 743 of Div. C).

__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

_x_ (9) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-328).

__ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC 2023) ( Pub. L. 115–390, title II).

_x_ (11)

(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders— Prohibition. (DEC 2023) ( Pub. L. 115–390, title II).

__ (ii) Alternate I (DEC 2023) of 52.204-30.

_x_ (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025) ( 31 U.S.C. 6101 note).

_x_ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) ( 41 U.S.C. 2313).

__ (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) ( 15 U.S.C. 657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (17) [Reserved]

__ (18)

(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-6.

__ (19) https://www.acquisition.gov/far/52.204-14#FAR_52_204_14 https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 https://www.govinfo.gov/link/uscode/31/6101 https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6

(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-7.

__ (20) 52.219-8, Utilization of Small Business Concerns (JAN 2025)( 15 U.S.C. 637(d)(2) and (3)).

__ (21)

(i) 52.219-9, Small Business Subcontracting Plan (JAN 2025) ( 15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (NOV 2016) of 52.219-9.

__ (iii) Alternate II (NOV 2016) of 52.219-9.

__ (iv) Alternate III (JUN 2020) of 52.219-9.

__ (v) Alternate IV (JAN 2025) of 52.219-9.

__ (22)

(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (MAR 2020) of 52.219-13.

__ (23) 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 657s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).

__ (26)

(i) 52.219-28, Postaward Small Business Program Rerepresentation (JAN 2025) (15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (MAR 2020) of 52.219-28.

__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).

https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-29#FAR_52_219_29

__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).

__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) ( 15 U.S.C. 644(r)).

__ (30) 52.219-33, Nonmanufacturer Rule (SEP 2021) ( 15 U.S.C. 637(a)(17)).

_x_ (31) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).

_x_ (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2025)( E.O. 13126).

_x_ (33) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

_x_ (34)

(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).

__ (ii) Alternate I (FEB 1999) of 52.222-26.

_x_ (35)

(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) ( 38 U.S.C. 4212).

__ (ii) Alternate I (JUL 2014) of 52.222-35.

_x_ (36)

(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) ( 29 U.S.C. 793).

__ (ii) Alternate I (JUL 2014) of 52.222-36.

_x_ (37) 52.222-37, Employment Reports on Veterans (JUN 2020) ( 38 U.S.C. 4212).

_x_ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

_x_ (39)

(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).

https://www.acquisition.gov/far/52.219-30#FAR_52_219_30 https://www.acquisition.gov/far/52.219-32#FAR_52_219_32 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section644&num=0&edition=prelim https://www.acquisition.gov/far/52.219-33#FAR_52_219_33 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.federalregister.gov/executive-order/13126 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50

__ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

_x_ (40) 52.222-54, Employment Eligibility Verification (JAN 2025) ( Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in

FAR 22.1803.)

__ (41)

(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA– Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (MAY 2024) ( 42 U.S.C. 7671, et seq.).

__ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (MAY 2024) ( 42 U.S.C. 7671, et seq.).

__ (44) 52.223-20, Aerosols (MAY 2024) ( 42 U.S.C. 7671, et seq.).

__ (45) 52.223-21, Foams (MAY 2024) ( 42 U.S.C. 7671, et seq.).

__ (46) 52.223-23, Sustainable Products and Services (MAY 2024) ( E.O. 14057, 7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).

__ (47)

(i) 52.224-3 Privacy Training (JAN 2017) ( 5 U.S.C. 552 a).

__ (ii) Alternate I (JAN 2017) of 52.224-3.

__ (48)

(i) 52.225-1, Buy American-Supplies (OCT 2022) (41 U.S.C. chapter 83).

__ (ii) Alternate I (OCT 2022) of 52.225-1.

__ (49)

(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-54#FAR_52_222_54 https://www.federalregister.gov/executive-order/12989 https://www.federalregister.gov/executive-order/12989 https://www.acquisition.gov/far/22.1803#FAR_22_1803 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-23#FAR_52_223_23 https://www.federalregister.gov/executive-order/14057 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2112&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3805&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section4001&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim

U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108- 302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I [Reserved].

__ (iii) Alternate II (JAN 2025) of 52.225-3.

__ (iv) Alternate III (FEB 2024) of 52.225-3.

__ (v) Alternate IV (Oct 2022) of 52.225-3.

__ (50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_x_ (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C. 5150).

_x_ (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (MAY 2024) ( E.O. 13513).

__ (56) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).

__ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

_x_ (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT2018) ( 31 U.S.C. 3332).

__ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).

http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-5#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://www.acquisition.gov/far/52.225-13#FAR_52_225_13 https://www.acquisition.gov/far/52.225-26#FAR_52_225_26 https://www.acquisition.gov/far/52.226-4#FAR_52_226_4 https://www.acquisition.gov/far/52.226-5#FAR_52_226_5 https://www.acquisition.gov/far/52.226-8#FAR_52_226_8 https://www.federalregister.gov/executive-order/13513 https://www.acquisition.gov/far/52.229-12#FAR_52_229_12 https://www.acquisition.gov/far/52.232-29#FAR_52_232_29 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3805&num=0&edition=prelim https://www.acquisition.gov/far/52.232-30#FAR_52_232_30 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3805&num=0&edition=prelim https://www.acquisition.gov/far/52.232-33#FAR_52_232_33 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3332&num=0&edition=prelim https://www.acquisition.gov/far/52.232-34#FAR_52_232_34

__ (61) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

_x_ (62) 52.239-1, Privacy or Security Safeguards (AUG 1996) ( 5 U.S.C. 552a).

__ (63) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (NOV 2024) (Sections 1821-1826, Pub. L. 118-31, 41 U.S.C. 3901 note prec.).

__ (64) 52.242-5, Payments to Small Business Subcontractors (JAN 2017) (15 U.S.C. 637(d)(13)).

__ (65)

(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) ( 46 U.S.C. 55305 and 10 U.S.C. 2631).

__ (ii) Alternate I (APR 2003) of 52.247-64.

__ (iii) Alternate II (NOV 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.]

_x_ (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter67).

__ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_x_ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustmxent (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).

__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

https://www.acquisition.gov/far/52.232-36#FAR_52_232_36 https://www.acquisition.gov/far/52.239-1#FAR_52_239_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552a&num=0&edition=prelim https://www.acquisition.gov/far/52.240-1#FAR_52_240_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section3901&num=0&edition=prelim https://www.acquisition.gov/far/52.242-5#FAR_52_242_5 https://www.acquisition.gov/far/52.247-64#FAR_52_247_64 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section55305&num=0&edition=prelim https://www.acquisition.gov/far/52.247-64#FAR_52_247_64 https://www.acquisition.gov/far/52.247-64#FAR_52_247_64 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 https://www.acquisition.gov/far/52.222-42#FAR_52_222_42 https://www.acquisition.gov/far/52.222-43#FAR_52_222_43 https://www.acquisition.gov/far/52.222-44#FAR_52_222_44 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section206&num=0&edition=prelim https://www.acquisition.gov/far/52.222-51#FAR_52_222_51 https://www.acquisition.gov/far/52.222-53#FAR_52_222_53

_x_ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order

14026 (JAN 2022).

__ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O.

13706).

__ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792).

__ (10) 52.247-69, Reporting Requirement for U.S.-Flag Air Carriers Regarding Training to Prevent Human Trafficking (JAN 2025) ( 49 U.S.C. 40118(g)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)

(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1), in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).

https://www.acquisition.gov/far/52.222-55#FAR_52_222_55 https://www.acquisition.gov/far/52.222-62#FAR_52_222_62 https://www.acquisition.gov/far/52.226-6#FAR_52_226_6 https://www.acquisition.gov/far/52.247-69#FAR_52_247_69 https://www.govinfo.gov/link/uscode/49/40118 https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/52.215-2#FAR_52_215_2 https://www.acquisition.gov/far/subpart-4.7#FAR_Subpart_4_7 https://www.acquisition.gov/far/52.203-13#FAR_52_203_13

(ii) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C.

4712).

(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iv) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L.

115-91).

(v) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(vi) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117-328).

(vii)

(A) 52.204–30, Federal Acquisition Supply Chain Security Act Orders— Prohibition. (DEC 2023) ( Pub. L. 115–390, title II).

(B) Alternate I (DEC 2023) of 52.204–30.

(viii) 52.219-8, Utilization of Small Business Concerns (JAN 2025) ( 15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(ix) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(x) 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).

(xi) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

(xii) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

(xiii) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/19.702#FAR_19_702 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37

(xiv) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xv) 52.222-41, Service Contract Labor Standards (AUG 2018) ( 41 U.S.C. chapter 67).

(xvi)

(A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O 13627).

(B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xvii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment- Requirements (May 2014) (41 U.S.C. chapter 67).

(xviii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xix) 52.222-54, Employment Eligibility Verification (JAN 2025) ( E.O. 12989).

(xx) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order

14026 (JAN 2022).

(xxi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O.

13706).

(xxii)

(A) 52.224-3, Privacy Training (Jan 2017) ( 5 U.S.C. 552a).

(B) Alternate I (JAN 2017) of 52.224-3.

(xxiii) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

(xxiv) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-chapter67-front&num=0&edition=prelim https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-51#FAR_52_222_51 https://www.acquisition.gov/far/52.222-53#FAR_52_222_53 https://www.acquisition.gov/far/52.222-54#FAR_52_222_54 https://www.federalregister.gov/executive-order/12989 https://www.acquisition.gov/far/52.222-55#FAR_52_222_55 https://www.acquisition.gov/far/52.222-62#FAR_52_222_62 https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 https://www.acquisition.gov/far/52.225-26#FAR_52_225_26 https://www.acquisition.gov/far/52.226-6#FAR_52_226_6 https://www.acquisition.gov/far/52.226-6#FAR_52_226_6

(xxv) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801). Flow down required in accordance with paragraph (c) of 52.232-40.

(xxvi) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (NOV 2024) (Sections 1821-1826, Pub. L. 118-31, 41 U.S.C. 3901 note prec.).

(xxvii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) ( 46 U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

52.217-8 – Option to Extend Services (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.

52-233-3 – Protest After Award (AUG 1996)

(a) Upon receipt of a notice of protest (as defined in FAR 33.101) or a determination that a protest is likely (see FAR 33.102(d)), the Contracting Officer may, by written order to the Contractor, direct the Contractor to stop performance of the work called for by this contract. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stop-page. Upon receipt of the final decision in the protest, the Contracting Officer shall either-

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.

(b)If a stop-work order issued under this clause is canceled either before or after a final decision in the protest, the Contractor shall resume work. The Contracting Officer shall make an equitable https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://www.acquisition.gov/far/52.240-1#FAR_52_240_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section3901&num=0&edition=prelim https://www.acquisition.gov/far/52.247-64#FAR_52_247_64…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .