B08-RFP Attachment 1-Forestry Line Item Spreadsheet-5.21.20.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Forestry
- Solicitation number
- W56ZTN-20-R-0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08-W56ZTN-20-R-0003 Amendment 0001.pdf | ||
| B08-W56ZTN-20-R-0003.pdf | ||
| B08-RFP Attachment 2-Past Performance Questionnaire (Forestry-v 5.4.20).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year Ordering Period
| Base Year Ordering Period | ||||||
| Item | Unit | Estimated Quantities/No. of Units* | Maximum Quantities/No. of Units | Price per unit | Total | |
| Line Items | ||||||
| Line Item 1: Forest Stand Delineation (FSD) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 2: Forest Conservation Plan (FCP) | plan | 5.00 | No limit | $ - 0 | ||
| Line Item 3: Critical Area Management Plan (CAMP) | plan | 1.00 | No limit | $ - 0 | ||
| Line Item 4: Forest Management Plan | stand plan | 15.00 | No limit | $ - 0 | ||
| Line Item 5: Forest enhancement and invasive removal (1"-4") | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 6: Forest enhancement and invasive removal (4"-8") | acre | 25.00 | No limit | $ - 0 | ||
| Line Item 7: Forest enhancement and invasive removal (> 8") | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 8: Forest Tree planting (300 tpa ) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 9: Forest Tree planting (150 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 10: Forest Tree planting (50 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 11: Urban Tree Planting (1.5" caliper minimum) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 12: Forest Inventory | acre | 750.00 | No limit | $ - 0 | ||
| Line Item 13: Forest Product Appraisal | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 14: Timber Marking | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 15: Site preparation: site with heavy grass and shrub | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 16: UXO support (S&A): site with heavy grass and shrub | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 17: Site preparation: site with shrub and trees less than 1” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 18: UXO support (S&A): site with shrub and trees less than 1” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 19: Site preparation: site with trees 1” – 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 20: UXO support (S&A): site with trees 1” – 4” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 21: Site preparation: site with trees greater than 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 22: UXO support (S&A): site with trees greater than 4” | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 23: Intrusive Monitoring UXO support | acre | 40.00 | No limit | $ - 0 | ||
| Line Item 24: Hazard Tree Removal (Class A 0-7.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 25: Hazard Tree Removal (Class B 8-15.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 26: Hazard Tree Removal (Class C 16-23.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 27: Hazard Tree Removal (Class D 25-50 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 28: Ground Herbicide Application | acre | 25.00 | No limit | $ - 0 | ||
| Subtotal for all Line Items $1,190,140.00 | $0.00 |
*Reference RFP/Contract Section H, "Requirement's Contract Limits" for the maximum limit of the contractor’s obligation to deliver and the Government’s obligation to order.
Option Year 1 Ordering Period
| Option Year 1 Ordering Period | ||||||
| Item | Unit | Estimated Quantities/No. of Units* | Maximum Quantities/No. of Units | Price per unit | Total | |
| Line Items | ||||||
| Line Item 1: Forest Stand Delineation (FSD) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 2: Forest Conservation Plan (FCP) | plan | 5.00 | No limit | $ - 0 | ||
| Line Item 3: Critical Area Management Plan (CAMP) | plan | 1.00 | No limit | $ - 0 | ||
| Line Item 4: Forest Management Plan | stand plan | 15.00 | No limit | $ - 0 | ||
| Line Item 5: Forest enhancement and invasive removal (1"-4") | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 6: Forest enhancement and invasive removal (4"-8") | acre | 25.00 | No limit | $ - 0 | ||
| Line Item 7: Forest enhancement and invasive removal (> 8") | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 8: Forest Tree planting (300 tpa ) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 9: Forest Tree planting (150 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 10: Forest Tree planting (50 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 11: Urban Tree Planting (1.5" caliper minimum) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 12: Forest Inventory | acre | 750.00 | No limit | $ - 0 | ||
| Line Item 13: Forest Product Appraisal | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 14: Timber Marking | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 15: Site preparation: site with heavy grass and shrub | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 16: UXO support (S&A): site with heavy grass and shrub | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 17: Site preparation: site with shrub and trees less than 1” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 18: UXO support (S&A): site with shrub and trees less than 1” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 19: Site preparation: site with trees 1” – 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 20: UXO support (S&A): site with trees 1” – 4” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 21: Site preparation: site with trees greater than 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 22: UXO support (S&A): site with trees greater than 4” | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 23: Intrusive Monitoring UXO support | acre | 40.00 | No limit | $ - 0 | ||
| Line Item 24: Hazard Tree Removal (Class A 0-7.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 25: Hazard Tree Removal (Class B 8-15.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 26: Hazard Tree Removal (Class C 16-23.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 27: Hazard Tree Removal (Class D 25-50 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 28: Ground Herbicide Application | acre | 25.00 | No limit | $ - 0 | ||
| Subtotal for all Line Items $1,190,140.00 | $0.00 |
*Reference RFP/Contract Section H, "Requirement's Contract Limits" for the maximum limit of the contractor’s obligation to deliver and the Government’s obligation to order.
Option Year 2 Ordering Period
| Option Year 2 Ordering Period | ||||||
| Item | Unit | Estimated Quantities/No. of Units* | Maximum Quantities/No. of Units | Price per unit | Total | |
| Line Items | ||||||
| Line Item 1: Forest Stand Delineation (FSD) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 2: Forest Conservation Plan (FCP) | plan | 5.00 | No limit | $ - 0 | ||
| Line Item 3: Critical Area Management Plan (CAMP) | plan | 1.00 | No limit | $ - 0 | ||
| Line Item 4: Forest Management Plan | stand plan | 15.00 | No limit | $ - 0 | ||
| Line Item 5: Forest enhancement and invasive removal (1"-4") | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 6: Forest enhancement and invasive removal (4"-8") | acre | 25.00 | No limit | $ - 0 | ||
| Line Item 7: Forest enhancement and invasive removal (> 8") | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 8: Forest Tree planting (300 tpa ) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 9: Forest Tree planting (150 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 10: Forest Tree planting (50 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 11: Urban Tree Planting (1.5" caliper minimum) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 12: Forest Inventory | acre | 750.00 | No limit | $ - 0 | ||
| Line Item 13: Forest Product Appraisal | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 14: Timber Marking | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 15: Site preparation: site with heavy grass and shrub | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 16: UXO support (S&A): site with heavy grass and shrub | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 17: Site preparation: site with shrub and trees less than 1” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 18: UXO support (S&A): site with shrub and trees less than 1” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 19: Site preparation: site with trees 1” – 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 20: UXO support (S&A): site with trees 1” – 4” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 21: Site preparation: site with trees greater than 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 22: UXO support (S&A): site with trees greater than 4” | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 23: Intrusive Monitoring UXO support | acre | 40.00 | No limit | $ - 0 | ||
| Line Item 24: Hazard Tree Removal (Class A 0-7.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 25: Hazard Tree Removal (Class B 8-15.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 26: Hazard Tree Removal (Class C 16-23.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 27: Hazard Tree Removal (Class D 25-50 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 28: Ground Herbicide Application | acre | 25.00 | No limit | $ - 0 | ||
| Subtotal for all Line Items $1,190,140.00 | $0.00 |
*Reference RFP/Contract Section H, "Requirement's Contract Limits" for the maximum limit of the contractor’s obligation to deliver and the Government’s obligation to order.
Option Year 3 Ordering Period
| Option Year 3 Ordering Period | ||||||
| Item | Unit | Estimated Quantities/No. of Units* | Maximum Quantities/No. of Units | Price per unit | Total | |
| Line Items | ||||||
| Line Item 1: Forest Stand Delineation (FSD) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 2: Forest Conservation Plan (FCP) | plan | 5.00 | No limit | $ - 0 | ||
| Line Item 3: Critical Area Management Plan (CAMP) | plan | 1.00 | No limit | $ - 0 | ||
| Line Item 4: Forest Management Plan | stand plan | 15.00 | No limit | $ - 0 | ||
| Line Item 5: Forest enhancement and invasive removal (1"-4") | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 6: Forest enhancement and invasive removal (4"-8") | acre | 25.00 | No limit | $ - 0 | ||
| Line Item 7: Forest enhancement and invasive removal (> 8") | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 8: Forest Tree planting (300 tpa ) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 9: Forest Tree planting (150 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 10: Forest Tree planting (50 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 11: Urban Tree Planting (1.5" caliper minimum) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 12: Forest Inventory | acre | 750.00 | No limit | $ - 0 | ||
| Line Item 13: Forest Product Appraisal | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 14: Timber Marking | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 15: Site preparation: site with heavy grass and shrub | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 16: UXO support (S&A): site with heavy grass and shrub | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 17: Site preparation: site with shrub and trees less than 1” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 18: UXO support (S&A): site with shrub and trees less than 1” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 19: Site preparation: site with trees 1” – 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 20: UXO support (S&A): site with trees 1” – 4” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 21: Site preparation: site with trees greater than 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 22: UXO support (S&A): site with trees greater than 4” | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 23: Intrusive Monitoring UXO support | acre | 40.00 | No limit | $ - 0 | ||
| Line Item 24: Hazard Tree Removal (Class A 0-7.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 25: Hazard Tree Removal (Class B 8-15.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 26: Hazard Tree Removal (Class C 16-23.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 27: Hazard Tree Removal (Class D 25-50 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 28: Ground Herbicide Application | acre | 25.00 | No limit | $ - 0 | ||
| Subtotal for all Line Items $1,190,140.00 | $0.00 |
*Reference RFP/Contract Section H, "Requirement's Contract Limits" for the maximum limit of the contractor’s obligation to deliver and the Government’s obligation to order.
Option Year 4 Ordering Period
| Option Year 4 Ordering Period | ||||||
| Item | Unit | Estimated Quantities/No. of Units* | Maximum Quantities/No. of Units | Price per unit | Total | |
| Line Items | ||||||
| Line Item 1: Forest Stand Delineation (FSD) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 2: Forest Conservation Plan (FCP) | plan | 5.00 | No limit | $ - 0 | ||
| Line Item 3: Critical Area Management Plan (CAMP) | plan | 1.00 | No limit | $ - 0 | ||
| Line Item 4: Forest Management Plan | stand plan | 15.00 | No limit | $ - 0 | ||
| Line Item 5: Forest enhancement and invasive removal (1"-4") | acre | 10.00 | No limit | $ - 0 | ||
| Line Item 6: Forest enhancement and invasive removal (4"-8") | acre | 25.00 | No limit | $ - 0 | ||
| Line Item 7: Forest enhancement and invasive removal (> 8") | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 8: Forest Tree planting (300 tpa ) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 9: Forest Tree planting (150 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 10: Forest Tree planting (50 tpa) | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 11: Urban Tree Planting (1.5" caliper minimum) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 12: Forest Inventory | acre | 750.00 | No limit | $ - 0 | ||
| Line Item 13: Forest Product Appraisal | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 14: Timber Marking | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 15: Site preparation: site with heavy grass and shrub | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 16: UXO support (S&A): site with heavy grass and shrub | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 17: Site preparation: site with shrub and trees less than 1” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 18: UXO support (S&A): site with shrub and trees less than 1” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 19: Site preparation: site with trees 1” – 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 20: UXO support (S&A): site with trees 1” – 4” | acre | 20.00 | No limit | $ - 0 | ||
| Line Item 21: Site preparation: site with trees greater than 4” | acre | 5.00 | No limit | $ - 0 | ||
| Line Item 22: UXO support (S&A): site with trees greater than 4” | acre | 100.00 | No limit | $ - 0 | ||
| Line Item 23: Intrusive Monitoring UXO support | acre | 40.00 | No limit | $ - 0 | ||
| Line Item 24: Hazard Tree Removal (Class A 0-7.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 25: Hazard Tree Removal (Class B 8-15.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 26: Hazard Tree Removal (Class C 16-23.9 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 27: Hazard Tree Removal (Class D 25-50 inch DBH) | tree | 5.00 | No limit | $ - 0 | ||
| Line Item 28: Ground Herbicide Application | acre | 25.00 | No limit | $ - 0 | ||
| Subtotal for all Line Items $1,190,140.00 | $0.00 |