This pre-award survey document requests contractor data from offerors interested in the REPLACE WELL #7 AT DDJC TRACY project. The solicitation seeks to replace well number 7 at the DDJC Tracy facility and was issued by the Department of the Army Corps of Engineers Engineering District Sacramento. It includes an RFP, technical documents as attachments, and schedules offerors to provide information on existing commitments, completed projects, equipment, and financial details by the scheduled site visit on July 1, 2021 to be considered for the contract award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B07 Site Visit Attendance Roster.pdf | ||
| Amendment 0003 - Reschedule Site Visit.pdf | ||
| Amendment 0002 - Site Visit Cancellation.pdf | ||
| B08 Amendment W9123821R00490001.pdf | ||
| B08 RFP W9123821R0049.pdf | ||
| B08 RFP Atch 1 - Design-Build Specifications and Drawings.pdf | ||
| B08 RFP Atch 5 - Past Performance Questionnaire.pdf | ||
| B08 RFP Atch 3 - Visitors Spreadsheet.XLSX | XLSX spreadsheet | |
| B08 RFP Atch 2 - Davis Bacon Wage Determination.6.18.2021.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4 – Pre-Award Survey
Pre-Award Survey Information
CONSTRUCTION CONTRACTOR DATA DATE:
Firm Name and Telephone Number Main Office Address (Street, City, and State)
Branch Offices Services Rendered
Construction
Design
Consultant
Organization
Individual Joint Venture
Partnership Corporation
Date Organized Date Incorporated:
State:
Names of Officers and Other Key Personnel
I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below)
Partners:
Officers:
Other Key:
Remainder: Subtotal Permanent:
Maximum Personnel at Any Time:
Date:
Total:
II—EQUIPMENT OWNED III—FINANCIAL DATA AS OF
(DATE): Present Value ($)
Current Assets:
Acquisition Cost ($) Current Liabilities:
Net Worth:
IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION WORK
IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE (LIST MOST
RECENT FIRST)
V—LARGEST JOB EVER
CONTRACTED
(If Other Than in Past Six Years)
$ LARGEST JOB IN PAST 6 YRS Contract Amount:
Date:
Description:
Owner:
$ Contract Amount:
Date:
Description:
Owner:
Avg. Annual Income
VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES
NAME AND POSITION/TITLE OF PERSON SIGNING SIGNATURE
See attachment for explanations or detailed description of item(s) reported above.
CONSTRUCTION CONTRACTOR DATA – SCHEDULE A – EXISTING COMMITMENTS
List below the construction projects your firm currently has under way, including recent awards. Also list construction projects for which your firm is the apparent successful offeror/bidder, but for which a contract has not yet been awarded.
CONTRACT
NUMBER
CONTRACT
AMOUNT
DESCRIPTION/
LOCATION
ORGANIZATION/
CONTACT PERSON/
PHONE NUMBER
PERCENT
COMPLETE
CONSTRUCTION CONTRACTOR DATA – SCHEDULE B – COMPLETED PROJECTS
List below the principal construction projects your firm has completed within the past six years, including all DOD contracts with a total value exceeding $1,000,000.00.
CONTRACT
NUMBER
CONTRACT
AMOUNT
DESCRIPTION/
LOCATION
ORGANIZATION/
CONTACT PERSON/
PHONE NUMBER
PERCENT
SUBLET
Pre-Award Survey Information
CONSTRUCTION CONTRACTOR DATA – SCHEDULE C – CONSTRUCTION AND/OR TECHNICAL EQUIPMENT
List total equipment and facilities owned for performing the prospective contract and present status as to whether or not it is currently committed to existing contracts.