B08_Price_Schedule_-_Look_Rock_-_ADA_Camp_Dev_-_JJF_2-8-24.pdf

PDF 23 KB Posted

Attached to
Great Smoky Mountains NP LOOK ROCK ADA CAMPSITE
Solicitation number
140P5324R0031
Issued by

About this file

This document is a Price Schedule for the Look Rock - ADA Campsite Development project at the Great Smoky Mountains National Park. The Price Schedule lists various construction items and their estimated quantities, unit prices, and total prices, including options such as providing and installing a new drinking fountain. The related federal contract opportunity is Solicitation Number 140P5324R0031 for the Great Smoky Mountains NP LOOK ROCK ADA CAMPSITE DEVELOPMENT, issued by the Department of the Interior National Park Service Southeast Region. The Price Schedule is to be used as a basis for estimating the probable cost of the proposed work, comparing bids, and providing change order values should the scope of work change significantly. Contractors are required to perform their own quantity take-off and base their bids on their own quantities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL PARK SERVICE DATE: 2/8/2024

GREAT SMOKY MOUNTAINS NATIONAL PARK

LOOK ROCK - ADA CAMPSITE DEVELOPMENT

PRICE SCHEDULE

ITEM DESCRIPTION EST. UNIT TOTAL

QTY UNIT PRICE PRICE

CAMPSITES 34 & 34A

1 Mobilization 1 LS $ $

2 Clear and Grub 2 LS $ $

3 Excavation 10 CY $ $

4 Borrow 20 CY $ $

5 Tree Removal - 8" 3 EA $ $

6 Tree Removal - 15" 1 EA $ $

7 6" x 6" X 12' Timbers 8 EA $ $

8 No. 10 Stone - Screenings 26 TON $ $

9 Mineral Aggregate Base Course, Type A 15 TON $ $

10 Bituminous Concrete Surface Course, Type E 9 TON $ $

11 Seed and Mulch 300 SY $ $

Sub-Total = $

Option 1 - Provide and Install a New Drinking Fountain

1 Excavation 1 CY $ $

2 Mineral Aggregate Base Course, Type A 0.7 TON $ $

3 Concrete 0.40 CY $ $

4 New Drinking Fountain 1.00 EA $ $

5 3/4" HDPE Waterline 5.00 LF $ $

6 3/4" Curb Stop 1.00 EA $ $

7 Seed and Mulch 15.00 SY $ $

Sub-Total = $

Total = $

All quantities stipulated in the above schedule or other contract documents are approximate and are to be used:

(1) as a basis for estimating probable cost of the proposed work, (2) for the purpose of comparing bids submitted, and (3) for the purpose of providing Change Order values should the scope of work change significantly from the work illustrated on the proposed plans (as opposed to minor differences in actual quantities as noted in the following). The contractor shall perform his own quantity take-off, and base his bid on his own quantities. An error on the above schedule shall not be a basis for additional compenstion to the contractor.