B08_Price_Schedule__C-Lot_Pump_Station_Repair.docx

DOCX document 19 KB Posted

Attached to
GATE-REPAIR C-LOT PUMP STATION-SHU
Solicitation number
140P4526Q0047
Issued by

About this file

This is a Contract Bid Schedule (Price Schedule) for the repair of critical components at the C-Lot Pump Station located at Sandy Hook Gateway National Recreation Area, Sandy Hook Unit, in Fort Hancock, New Jersey. The solicitation number is 140P4526Q0047, issued by the Department of the Interior National Park Service Northeast Region.

The bid schedule requires contractors to submit pricing for all itemized work, with failure to do so potentially rendering the bid non-responsive. The pricing structure is organized into three primary categories: Direct Labor Hours (including separate line items for Supervisor and Laborers/Technicians with hourly rates), Material/Supplies (including equipment for repair), and Services (including coating, pump truck services, and other services). Contractors must provide total hours and hourly rates for labor, calculate subtotals for each category, and provide a Total Base Bid amount. The schedule allows for additional line items to be inserted if needed for items not pre-populated on the form. This template does not specify response deadlines, award dates, set-asides, or contract vehicle types, serving solely as the pricing submission format for this specific repair project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT BID SCHEDULE

Replace Critical Components of C-Lot Pump Station at Sandy Hook Gateway National Recreation Area - Sandy Hook Unit

Submit bid for all items: Failure to do so may render the bid non-responsive. If there is an item that is not below that you would like to itemize out, please insert it in the appropriate area and calculate it in the totals.

Direct Labor Hours:

Supervisor _______Total Hours x $___________/hr = $__________

Laborers/Tech(s) _______Total Hours x $__________/hr = $__________

Direct Labor Hours: $ _________ TOTAL

MATERIAL/SUPPLIES:

Material /Supplies = $__________

Equip for repair = $__________

Material/Supplies: $ _________ TOTAL

SERVICES:

Services/Coating = $__________

Services/Pump Truck = $__________

Services/other = $__________

Services: $ ___________ TOTAL

TOTAL BASE BID = $____________________

File details come from the government source that posted it. Updated .