This document is a fee schedule template for a federal contract feasibility assessment project at Stewart B. McKinney National Wildlife Refuge (NWR), specifically addressing marsh restoration and tidal flow improvement at the Salt Meadow Unit.
The project comprises six tasks with associated proposed costs to be completed by the contractor. Task 1 involves assessment of existing data relevant to the site. Task 2 requires assessment of existing modeling efforts. Task 3 consists of a post-award site visit and preliminary site assessment. Task 4 involves developing a standardized SBT (Shallow Bay Technology or similar approach) methodology for design purposes. Task 5 requires development and analysis of alternative solutions. Task 6 involves concept refinement and final development. The template provides a structure for the contractor to propose costs for each individual task, with a final row for the project total fee. All cost fields in the template are blank, indicating this is a pricing template awaiting contractor completion during the proposal submission process.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC226R0014_Amd_0002.pdf | ||
| B09_Amd2_Q_A_0002.pdf | ||
| B09_Amd2_Report_0002.pdf | ||
| Sol_140FC226R0014_Amd_0001.pdf | ||
| Past_Performance_Survey.pdf | ||
| Sol_140FC226R0014.pdf | ||
| SOW_Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Stewart B. McKinney NWR: Salt Meadow Unit, Marsh Restoration and Tidal Flow Improvement Feasibility Assessment
Fee Schedule
Total Fee Schedule Proposed Cost
1. Task 1: Assessment of Existing Data
2. Task 2: Assessment of Existing Modeling
3. Task 3: Post Award Site Visit and Preliminary Site Assessment
4. Task 4: Develop Standardized SBT Approach for Design
5. Task 5: Alternative Analysis Development
6. Task 6: Concept Refinement and Development
Project Total Fee: