B08_Fee_Schedule-Bid_Sheet.pdf

PDF 51 KB Posted

Attached to
Feasibility Assessment Study - RI Federal contract opportunity
Solicitation number
140FC226R0014
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document is a fee schedule template for a federal contract feasibility assessment project at Stewart B. McKinney National Wildlife Refuge (NWR), specifically addressing marsh restoration and tidal flow improvement at the Salt Meadow Unit.

The project comprises six tasks with associated proposed costs to be completed by the contractor. Task 1 involves assessment of existing data relevant to the site. Task 2 requires assessment of existing modeling efforts. Task 3 consists of a post-award site visit and preliminary site assessment. Task 4 involves developing a standardized SBT (Shallow Bay Technology or similar approach) methodology for design purposes. Task 5 requires development and analysis of alternative solutions. Task 6 involves concept refinement and final development. The template provides a structure for the contractor to propose costs for each individual task, with a final row for the project total fee. All cost fields in the template are blank, indicating this is a pricing template awaiting contractor completion during the proposal submission process.

View the file

Other files for this federal contract opportunity

Other files attached to Feasibility Assessment Study - RI, newest first.
File Type Posted
Sol_140FC226R0014_Amd_0002.pdf PDF
B09_Amd2_Q_A_0002.pdf PDF
B09_Amd2_Report_0002.pdf PDF
Sol_140FC226R0014_Amd_0001.pdf PDF
Past_Performance_Survey.pdf PDF
Sol_140FC226R0014.pdf PDF
SOW_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stewart B. McKinney NWR: Salt Meadow Unit, Marsh Restoration and Tidal Flow Improvement Feasibility Assessment

Fee Schedule

Total Fee Schedule Proposed Cost

1. Task 1: Assessment of Existing Data

2. Task 2: Assessment of Existing Modeling

3. Task 3: Post Award Site Visit and Preliminary Site Assessment

4. Task 4: Develop Standardized SBT Approach for Design

5. Task 5: Alternative Analysis Development

6. Task 6: Concept Refinement and Development

Project Total Fee: