B08 - Evaluation Criteria APG Equip Maint.docx

DOCX document 14 KB Posted

Attached to
Mobile & Stationary Equipment Maintenance and Repair
Solicitation number
W911QX20R0009
Issued by

About this file

This solicitation is for mobile and stationary equipment maintenance and repair services. The Army Contracting Command at Aberdeen Proving Ground is seeking preventative maintenance, inspections, repairs, and reimbursable parts for equipment over a one-year base period and two one-year options. Offerors must have experience servicing similar workloads and meeting response timeframes for emergency and normal repairs as well as inspection timelines. The solicitation will be evaluated based on technical approach, past performance, and price, with technical and past performance significantly more important than price. Offers are due by March 17, 2020.

View the file

Other files

File Type Posted
QA W911QX20R0009.docx DOCX document
Attachment 1 (Rev) - Mobile Equipment List.xlsx XLSX spreadsheet
Attachment 2 (Rev)- Stationary Equipment List.xlsx XLSX spreadsheet
Attachment 2 Stationary Equipment List.XLSX XLSX spreadsheet
B01 - Provisions and Clauses Full-Text Attachment (for Combo Synopsis-Solicitation) EQP.docx DOCX document
Attachment 1 Mobile Equipment List.XLSX XLSX spreadsheet
A02 - PWS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Evaluation Criteria – Service (Tradeoff)

The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforms to the solicitation and will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Technical, Past Performance and Price.

The Technical element of the evaluation will first be a determination as to whether the proposed product meets the performance characteristics and/or objectives in the solicitation. Those offers that meet or exceed the stated performance characteristics and/or objectives will then be evaluated in terms of technical aspects above the minimum requirements that would be most beneficial to the Government. In particular, the Government is willing to trade-off on price for offerors that exceed the following performance work characteristics/objectives and/or period of performance:

1. Experience with company and/or employees in repairing similar work load comparable with the APG equipment list.

1. Experience with company and/or employees in responding within 4 clock hours of emergency for repair of equipment.

1. Experience with company and/or employees in responding within 24 clock hours of normal repair of equipment.

1. Experience with company and/or employees in meeting the timeframes for performing semi-annual and annual inspections of the type of equipment at the ALC center.

The Technical element of the evaluation shall be based solely on information furnished by the vendor. The Government is not responsible for locating or securing any information, which is not identified in the proposal. To ensure sufficient information is available, vendors must furnish as part of their proposal all descriptive material (such as cuts, illustrations, drawings, processes or other information) necessary for the Government to determine whether the proposed effort meets or exceeds the performance characteristics and/or objectives of the requirement.

Past performance will be evaluated based on information provided by the offeror as to actual sales of the proposed effort to industry or Government agencies. Past performance will consider the ability of the offeror to meet characteristics/ objectives, delivery schedules (with warranty fulfillment and maintenance reputation included as applicable). Offerors shall include five records of sales from the previous 36 months. Offerors shall identify a point of contact for each sale by providing a name and telephone number.

Price will be evaluated based on the total proposed price, including options, (if any).

Technical and past performance are of equal importance and when combined are significantly more important than price. The Government reserves the right to award to other than the lowest price and to award without discussions.

File details come from the government source that posted it. Updated .