Quivira NWR, Stafford, Kansas B – Supplies or Services/Prices

REPLACE FENCE AT

QUIVIRA NATIONAL WILDLIFE REFUGE

Description of work: Providing all labor, services, equipment, specified materials, to remove existing fences and construct new refuge fences in accordance with attached Combined SOW, Drawings and Maps.

Contractor shall furnish all labor, services, equipment, specified materials, to remove existing and perform all work in connection with the construction of 13,497 ln ft. of four-strand wildlife friendly fence along priority fence map sections A, B, C, D, and F. The contractor shall also provide line item bid estimates for the construction of fence section options E, G1, G2, H, I, and I (Alt). Fence options E, G1, G2, H, I, and I (Alt) could be offered as additional contract work if extra funding becomes available. Line item fence section bids are required to help itemize and break down costs provided during the bid process, and allows invoicing and partial payments during the construction period as needed. All fence rehabilitation will be done in accordance with specific guidance, photos, drawings, general fencing specifications, and maps (See Attachment 1. Refuge Boundary Map & Individual Fence Maps).

Description of work: Providing all labor, supplies and equipment

ITEM TOTAL NO.
DESCRIPTION
QTY
UNIT
UNIT PRICE
AMOUNT
1
Mobilization and Demobilization
1
L.S.
$
$
2
Fence Section A
1,298
L.F.
$
$
3
Fence Section B
1,589
L.F.
$
$
4
Fence Section C
2,659
L.F.
$
$
5
Fence Section D
2,845
L.F.
$
$
6
Fence Section F
5,106
L.F.
$
$
7
Overhead
1
L.S.
$
$
8
Profit
1
L.S.
$
$
Total Cost
$

OPTIONAL ITEMS:

1
Fence Section E
2,517
L.F.
$
$
2
Fence Section G1
2,288
L.F.
$
$
3
Fence Section G2
10,522
L.F.
$
$
4
Fence Section H
4,418
L.F.
$
$
5
Fence Section I
5,161
L.F.
$
$
6
Fence Section I-Alternate
8,246
L.F.
$
$
Total Cost with Exercised Options
$

NOTE: It is strongly suggested for vendors to plan a site visit (visualize scope of project, ground conditions, etc.) prior to submitting for the project. Site conditions can be extremely wet during certain seasons of the year depending on annual rainfall and groundwater flow.