This document provides technical specifications for concrete repairs at Crab Orchard Dam in Williamson County, Illinois. The project involves designing concrete mix designs, furnishing and placing structural concrete, and performing concrete repairs to rehabilitate the ogee crest of the dam's service spillway. Concrete work must meet minimum 4,500 psi compressive strength standards at 28 days. The contractor will control water levels during construction by operating the dam's outlet works and must not draw down the reservoir below elevation 401.0 feet. The specifications establish requirements for formwork, reinforcement, concrete materials, admixtures, finishing, and quality control testing. The contractor must submit mix designs, placement schedules, and qualifications in accordance with the procedures defined in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
FOR
CONCRETE REPAIRS AT CRAB ORCHARD DAM
Crab Orchard National Wildlife Refuge Williamson County, Illinois
Submitted to
U.S. Fish & Wildlife Service Falls Church, Virginia
Submitted by
Gannett Fleming, Inc.
207 Senate Avenue Camp Hill, Pennsylvania 17011
GF Project 46286
October 2020
Concrete Repairs at Crab Orchard Dam TOC-1
TECHNICAL SPECIFICATIONS
FOR
CONCRETE REPAIRS AT CRAB ORCHARD DAM
BID SCHEDULE
TABLE OF CONTENTS
ARTICLE TITLE PAGE NOS.
DIVISION 1 - GENERAL PROVISIONS
01010 Summary of Work 01010-1 01010-2 01061 Project Permits 01061-1 01061-2 01092 Abbreviations 01092-1 01092-2 01300 Submittals 01300-1 01300-4 01506 Bonds and Insurance 01506-1 01506-2 01551 Site Access and Parking Areas 01551-1 01551-4 01552 Staging, Stockpile, and Waste Fill Areas 01552-1 01552-2 01590 Field Offices and Temporary Utilities 01590-1 01590-4 01700 Contract Closeout 01700-1 01700-2
DIVISION 2 - SITE WORK
02139 Temporary Control of Water and Reservoir Levels 02139-1 02139-2 02212 Erosion Protection and Sediment Control 02212-1 02212-2 02901 Reclamation of Disturbed Areas 02901-1 02901-2
DIVISION 3 - CONCRETE
03100 Concrete Formwork 03100-1 03100-6 03200 Concrete Reinforcement 03200-1 03200-4 03300 Concrete 03300-1 03300-20 03370 Concrete Curing 03370-1 03370-4 03392 Concrete Repairs 03392-1 03392-10 03811 Concrete Removal 03811-1 03811-6
ARTICLE TITLE PAGE NOS.
DIVISION 4 - MASONRY
*** Division Not Used ***
DIVISION 5 - METALS
*** Division Not Used ***
Concrete Repairs at Crab Orchard Dam TOC-2
DIVISION 6 – WOOD AND PLASTICS
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
*** Division Not Used ***
DIVISION 8 – DOORS AND WINDOWS
*** Division Not Used ***
DIVISION 9 – FINISHES
*** Division Not Used ***
DIVISION 10 – SPECIALTIES
*** Division Not Used ***
DIVISION 11 – EQUIPMENT
*** Division Not Used ***
DIVISION 12 – FURNISHINGS
*** Division Not Used ***
DIVISION 13 – SPECIAL CONSTRUCTION
Concrete Repairs at Crab Orchard Dam TOC-3
ARTICLE TITLE PAGE NO.
DIVISION 14 – CONVEYING SYSTEMS
DIVISION 15 – MECHANICAL
DIVISION 16 – ELECTRICAL
DIVISION 17 – REFERENCE DATA
END OF CONTENTS
Concrete Repairs at Crab Orchard Dam
DIVISION 1
GENERAL PROVISIONS
Concrete Repairs at Crab Orchard Dam 01010-1 Summary of Work
SECTION 01010
SUMMARY OF WORK
PART 1 GENERAL
1.01 SUMMARY
A. The work outlined in these Specifications includes concrete repairs at Crab Orchard Dam.
1.02 SITE LOCATION
A. Project location is Crab Orchard Dam, located on Government land in the Crab
Orchard National Wildlife Refuge, Williamson County, Illinois. Exact location of Project is indicated on the "Location Map" on the first sheet of the Drawings.
1.03 APPLICABLE CODES, STANDARDS, AND SPECIFICATIONS
A. Comply with codes and standards applicable to each type of work and as listed in individual sections.
1. Where a conflict occurs between referenced documents and the Technical
Specifications, the Technical Specifications shall govern.
2. Where a conflict occurs between different referenced documents, the document containing the more stringent requirements governs.
3. The applicable version of a referenced document shall be the dated version specified for that document. When a date is not specified, the version current as of the date established for receipt of bids shall govern.
4. Materials, applications, and tests specified by reference to published standards of a society, association, code, or other published standards are included in the Specifications as if written in their entirety.
1.04 DRAWINGS
A. Project Drawings: The Drawings accompanying these Specifications are hereby made a part of the Contract. The Work relative to the Contracts is indicated in the set of Drawings.
1.05 MODIFICATIONS
A. Contracting Officer’s Representative reserve right to make changes in order and execution of Work done under Contract as, in judgement of Contracting Officer’s Representative, may be necessary or expedient to carry out intent of design and Contract. No increase in unit prices over Contract rates will be paid to the Contractor as a result of such changes.
Concrete Repairs at Crab Orchard Dam 01010-2 Summary of Work
1.06 PROFILES AND TOPOGRAPHY
A. Profiles, topography, and details for the work are schematic in nature and, with the exception of dimensioned construction details, are presented only for the purpose of conveying the concept and the limit of specified work. The Contractor shall verify all details in the field. The misuse of noted information for other than that indicated and subsequent suffering of damages as a result of misuse shall not be cause for any claim by the Contractor. Information is believed to be reasonably correct, but is not guaranteed.
1.07 PHYSICAL DATA
A. Become fully informed concerning location of public or private facilities and structures on, under, or over Project, which may interfere with operations. It is assumed Contractor has prepared bid and entered into Contract with full understanding of conditions to be encountered, and responsibilities in connection with that.
1.08 ADJACENT PROPERTY AND RIGHT-OF-WAY
A. Do not trespass, store material or equipment or in any other manner occupy any property outside of the construction right-of-ways, easements or limits of disturbance shown on the Drawings without written permission of the owner of the property. Any damage done by the Contractor to property outside of said work areas shall be restored immediately to the property owner's satisfaction at the Contractor's expense.
1.09 UTILITY OWNERS
A. Do not operate, move, relocate, or in any way interfere with the operation of existing utilities at, near, or outside the work area without first contacting a qualified representative of the utility involved and obtaining a written approval from this representative.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
NOT USED
PART 4 MEASUREMENT AND PAYMENT
END OF SECTION
Concrete Repairs at Crab Orchard Dam 01061-1 Project Permits
SECTION 01061
PROJECT PERMITS
1.01 GENERAL
A. This section includes, but is not limited to, permitting requirements necessary to complete the work. Permits obtained by the Contractor are described in Part 3 of this section of the specifications.
1.02 SUBMITTALS
A. The Contractor shall submit copies of all permits obtained by the Contractor to the Contracting Officer’s Representative in accordance with Section 01300: Submittals.
PART 3 EXECUTION
3.01 PROJECT PERMITS OBTAINED BY CONTRACTOR
A. The Contractor shall determine if a National Pollutant Discharge Elimination System (NPDES) Permit, Section 402 of the Clean Water Act is required to complete the Concrete Repairs. If it is required, the Contractor is responsible for applying for and obtaining the permit.
B. The Contractor shall be required to obtain all other permits in accordance with local, state, and federal regulations.
3.03 PROJECT PERMIT COMPLIANCE
A. By submitting a bid, the Contractor acknowledges an understanding of the terms and conditions of, and shall be fully responsible for, all project permits required for the execution of the work; including all project permits required to be obtained by the Contractor.
PART 4 MEASUREMENT AND PAYMENT
4.01 MEASUREMENT
A. All work required in this section will not be measured for payment.
Concrete Repairs at Crab Orchard Dam 01061-2 Project Permits
4.02 PAYMENT
Compensation to the Contractor for all work required in this section shall be included in the prices bid in the schedule for other items of work. No separate payment to the Contractor will be made for the work required in this section.
Concrete Repairs at Crab Orchard Dam 01092-1 Abbreviations
SECTION 01092
ABBREVIATIONS
1.01 ABBREVIATIONS
A. Abbreviations that may be used throughout the Specifications and the organization or document represented are:
AA Aluminum Association AAMA Architectural Aluminum Manufacturer's Association AASHTO American Association of State and Highway Transportation Officials ACI American Concrete Institute AIA American Institute of Architects AIEE American Institute of Electrical Engineers AISC American Institute of Steel Construction AISI American Iron and Steel Institute AMA American Materials Association ANSI American National Standards Institute ASA American Standards Association (now USAS) ASCE American Society for Civil Engineers ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials AWS American Welding Society AWWA American Water Works Association CFR Code of Federal Regulations CMP Corrugated Metal Pipe CO Contracting Officer COR Contracting Officer’s Representative CRSI Concrete Reinforcing Steel Institute CS Commercial Standards of U.S. Department of Standards CSI Construction Specifications Institute FAR Federal Acquisition Regulations FML Flexible Membrane Lining FS Federal Specifications GI Government Inspector HASP Health and Safety Plan IBC International Building Code NBC National Building Code NBS National Bureau of Standards NGVD National Geodetic Vertical Datum NPDES National Pollution Discharge Elimination System NRMCA National Ready Mix Concrete Association OSHA Occupational Safety and Health Administration, U.S. Department of
Labor PCA Portland Cement Association SPI Steel Products Institute
Concrete Repairs at Crab Orchard Dam 01092-2 Abbreviations
SSPC Steel Structures Painting Council UBC Uniform Building Code UL Underwriters Laboratories USACE U.S. Army Corps of Engineers USBR U.S. Bureau of Reclamation USFWS U.S. Fish & Wildlife Service
B. Additional definitions, if any, will be defined as they appear in the Specifications.
1.02 DEFINITIONS
A. Definitions used in these Specifications include:
1. Government - the U.S. Fish & Wildlife Service (USFWS).
2. Contracting Officer (CO) - the person authorized by the USFWS to award and administer this Contract. The CO shall make all final decisions concerning contractual matters and has sole authority to direct changes to, or make any binding agreements concerning, this Contract.
3. Contracting Officer’s Representative (COR) - the person authorized by the USFWS and appointed by the CO, to represent the CO for all technical matters that arise under this Contract. The limited authorities and responsibilities of this person are specifically delegated in writing by the CO.
4. On-Site Construction Inspector (CI) - the person authorized by the USFWS and appointed by the CO under a separate Title III Engineering Services Task Order and Contract to observe the Work performed under this Contract to ensure that it conforms to the technical specifications and drawings of this Contract requirements.
5. Work - The entire construction of the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents.
6. Neat Lines - the dimension as shown on the Drawings of a line from a specified or labeled reference point.
B. Additional definitions, if any, will be defined as they appear in the Specifications.
Concrete Repairs at Crab Orchard Dam 01300-1 Submittals
SECTION 01300
SUBMITTALS
1.01 WORK SCOPE
A. This Section includes provisions for providing submittals to the Contracting Officer’s Representative.
1.02 SUBMITTAL REQUIREMENTS
A. Refer to FAR 52.236-5, Materials and Workmanship, and Specifications and Drawings for Construction.
B. Do not order, use, or install any item specified as requiring a submittal prior to approval. The Contractor shall submit manufacturer's/supplier’s literature containing detailed specifications, test results, and performance data or shop drawings fully describing the items. The Contractor is solely responsible for any item that has been ordered/delivered prior to submittal approval.
C. Submittals shall be electronically transmitted to the COR and the CI. Samples shall be delivered by mail or courier to the COR and the CI.
D. The following identification data shall be contained with the submittal:
1. Contract name and number
2. Contractors name
3. Reference to the applicable specification paragraph and Drawings
4. Indication of the intended use of the item in the Work.
E. The Contractor shall allow a minimum of 10 days, or as otherwise shown in Table 1 for the Government’s review of each required submittal or re-submittal.
F. After review, submittals will be returned by the COR marked as follows: Approved;
Approved as Noted; Revise and Resubmit; or Rejected.
1. Approved: When submittals are returned Approved, it is understood that they have been found to be in conformance with the Contract Documents. The COR's approval of the submittals does not relieve the Contractor from responsibility for errors or discrepancies in such submittals.
2. Approved as Noted: When submittals are returned Approved as Noted, it is understood that the submittals have been found to be in conformance with the Contract Documents, provided the changes noted by the COR are incorporated.
Submittals returned Approved as Noted will not require resubmission.
3. Revise and Resubmit: When submittals are returned noted Revise and Resubmit, it is understood that the Contractor shall make the required corrections and resubmit corrected submittals to COR and CI. No fabrication is allowed.
Concrete Repairs at Crab Orchard Dam 01300-2 Submittals
4. Rejected: When submittals are returned Rejected, it is understood that the Contractor shall make completely new submittals
G. A list of required submittals is listed in Table 1 of this Section. This listing in Table 1 is not necessarily inclusive of all required submittals. See each Specification Section and the Drawings for required submittals.
H. Do not order items or perform work related to shop drawings, samples or material requiring testing prior to obtaining the required approvals of shop drawings or samples from the COR.
I. Where testing is required for submittal purposes of products or materials to show compliance with Specification requirements, such testing shall be performed by and at the expense of the Contractor. Testing agencies employed by the Contractor for such purposes shall be approved by the Contracting Officer's Representative. All required test results shall be submitted and approved by the Contracting Officer’s Representative before installation. In addition, only approved products or materials shall be delivered and stockpiled/stored at the site.
1.03 SAMPLES
A. Submit all samples in duplicate.
B. Provide samples of sufficient size to permit an accurate appraisal of color, texture, finish, workmanship, and other specified characteristics.
C. Samples shall be submitted with shop drawings when both are required.
1.04 MODIFICATION COST PROPOSALS
A. Refer to FAR 52.243-4, Changes.
NOT USED
Concrete Repairs at Crab Orchard Dam 01300-3 Submittals
TABLE 1
LIST OF SUBMITTALS
Item Reference
Section Submittals Required Due Date
Project Permits 01061 All Project Permits Obtained by the Contractor
10 days prior to performing work as stipulated by the permit(s)
Construction Access Roads and Parking Areas
01551 Design of Temporary Access Roads, as needed
With Project Bid
01551 Traffic Control Plan, as needed 10 Days Prior to Work
Contract Closeout 01700 Record documents, Test Reports, Guaranties and Certificates
10 Days Prior to Final Payment
Demolition 02075 Concrete Removal Plan 100 Days Prior to Work
Temporary Control of Water and Reservoir Levels
02139 Temporary Control of Water Plan With Project Bid
Erosion Protection and Sediment Control
02212 Erosion Protection and Sediment Control Plan
10 Days Prior to Work
Concrete Formwork 03100 Formwork Product Data
10 Days Prior to Delivery to Site
03100 Shop Drawings 10 Days Prior to Usage
Concrete Reinforcement
03200 Shop drawings 10 Days Prior to Delivery to Site
03200 Test Reports 10 Days Prior to Delivery to Site
Structural Concrete
03300 Product data 10 Days Prior to Concrete Placement
03300 Samples, As Requested 10 Days Prior to Concrete Placement
03300 Certifications and Test Reports 10 Days Prior to Concrete Placement
03300 Mix Design 10 Days Prior to Concrete Placement
03300 Test Reports 10 Days Prior to Concrete Placement
03300 Concrete Placement Schedule 10 Days Prior to Concrete Placement
Concrete Repairs at Crab Orchard Dam 01300-4 Submittals
Item Reference
Section Submittals Required Due Date
Structural Concrete
03300 Independent Test Laboratory Certification
10 Days Prior to Concrete Placement
03300 Qualifications of Contractor’s Personnel
10 Days Prior to Concrete Placement
03300 Waterstop Product Data 10 Days Prior to Concrete Placement
Concrete Repairs
03392 Concrete Repair Contractor Qualifications
10 Days Prior to Work
03300 Concrete Repair Product Manufacturer Qualifications
10 Days Prior to Work
03300 Product Data 10 Days Prior to Work
03300 Samples, As Requested Within 7 Days following testing
03300 Concrete Repair Plan 14 Days Following Notice to Proceed
03300 As-Built Drawings 10 Days after Final Inspection
03300 Certification that all repair materials were supplied by one manufacturer
10 Days after Final Inspection
03300
Certification that all repairs were installed in accordance with the manufacturers recommendations and project specifications
10 Days after Final Inspection
A. All work required in this Section will not be measured for payment.
4.02 PAYMENT
A. Compensation to the Contractor for all work in this Section shall be included in the prices bid in the Bid Schedule for the items for which submittals are required. Separate payment will not be made to the Contractor for any of the Work required in this Section.
Concrete Repairs at Crab Orchard Dam 01506-1 Bonds and Insurances
SECTION 01506
BONDS AND INSURANCE
A. Furnish performance and payment bonds in accordance with FAR Clause 52.232-5.
B. Furnish insurance in accordance with FAR Clause 52.228-5, and Department of
Interior Acquisition Regulation Clause 1452.228-70.
A. All costs associated with bonds will not be measured for payment.
B. All costs associated with insurance will not be measured for payment.
A. Compensation to the Contractor for premiums to obtain bonds shall be included in the prices bid in the Bid Schedule for other items of work. No separate payment will be made to the Contractor for bonds.
B. Compensation to the Contractor for insurance shall be included in the prices bid in the
Bid Schedule for other items of work. No separate payment will be made to the Contractor for insurance premiums.
Concrete Repairs at Crab Orchard Dam 01506-2 Bonds and Insurances
THIS PAGE INTENTIONALLY BLANK
Concrete Repairs at Crab Orchard Dam 01551-1 Site Access and Parking Areas
SECTION 01551
SITE ACCESS AND PARKING AREAS
1.01 GENERAL
A. Primary access roads to the Work Site shall be the existing paved and unpaved Refuge and County roads as shown on the Drawings.
B. If a temporary access road is necessary to access the service spillway, it shall be constructed in the area downstream of the service spillway within the limits shown on the Drawings. The access road shall be accessed from Highway 26. A recommended layout of a proposed access road has been included in the Drawings. The Contractor shall submit the design of any temporary access to satisfactorily complete the concrete repairs to the Owner for review and approval.
C. All other Refuge roads shall be closed to the Contractor's use during construction unless access is specifically approved by the Contracting Officer's Representative.
D. Parking areas for the Work Site shall be at the staging areas shown on the Drawings.
1.02 PROTECTION OF EXISTING ROADS
A. The Contractor shall be responsible for any damage to Refuge and County roads resulting from his construction activities. The Contractor shall repair all damages to Refuge and County roads, in accordance with all County and refuge requirements, at no additional cost to the Government.
B. Any damage to the existing Refuge access roads, culverts, or headwalls caused by construction activity shall be repaired by the Contractor to the satisfaction of the Contracting Officer's Representative, and at no additional cost to the Government.
1.03 PROTECTION OF EXISTING PARKING AREAS
A. The Contractor shall be responsible for any damage to any of the designated parking areas resulting from their construction activities. The Contractor shall repair all damages to parking areas to the satisfaction of the Owner at no additional cost to the Government.
1.04 RELATED SECTIONS
A. Section 01300: Submittals
B. Section 02901: Reclamation of Disturbed Areas
Concrete Repairs at Crab Orchard Dam 01551-2 Site Access and Parking Areas
1.05 TEMPORARY CONSTRUCTION ACCESS ROADS
A. The Contractor may construct temporary access roads for their operations, if prior written approval is obtained from the Contracting Officer's Representative.
Temporary access roads will be designed by the Contractor and the design will be submitted to the Owner for approval prior to construction.
1. Temporary access roads shall follow the contour of the natural terrain to the extent possible. Slopes should not exceed 10 percent.
2. Roads shall be at least 14 feet wide for one-way traffic and 20 feet wide for two-way traffic.
3. All cuts and fills shall be 3:1 or flatter to the extent possible.
4. Drainage ditches shall be provided as needed.
B. If temporary access roads are approved and constructed, they shall be maintained throughout construction. At the end of construction remove all temporary access roads, as required by the Contracting Officer's Representative, in accordance with the provisions of Section 02901: Reclamation of Disturbed Areas.
1.06 TRAFFIC CONTROL
A. Provide traffic control on Refuge and County roads during construction, as needed to perform the Work and as required by the Contracting Officer’s Representative.
1.07 SUBMITTALS
A. Design of temporary access roads will be developed by the Contractor and submitted to the Owner with the Contractor’s bid for the project.
B. If traffic control is required on a County road, a traffic control plan and road signage plan will be developed by the Contractor and submitted to the County for review and approval. The County-approved plans shall be submitted to the Contracting Officer’s
2.01 WARNING SIGNS
A. Traffic warning signs and their deployment shall conform to the Manual of Uniform Traffic Control Devices.
3.01 TRAFFIC CONTROL DURING CONSTRUCTION
A. Traffic control and warning shall be performed during construction in accordance with the Manual of Uniform Traffic Control Devices and requirements of the County Road Department.
Concrete Repairs at Crab Orchard Dam 01551-3 Site Access and Parking Areas
B. Warning signs shall be maintained in good condition by the Contractor throughout construction.
C. The Contractor shall remove all mud and debris from County roads that results from the Contractor’s operations as required by the County or the Contracting Officer’s
A. Temporary site access will not be measured for payment.
A. Compensation to the Contractor for all costs associated with constructing temporary access to the project location will be made at the lump sum price in the Bid Schedule for Temporary Site Access.
Concrete Repairs at Crab Orchard Dam 01551-4 Site Access and Parking Areas
Concrete Repairs at Crab Orchard Dam 01552-1 Staging, Stockpile, and October 2020 Waste Fill Areas
SECTION 01552
STAGING, STOCKPILE, AND WASTE FILL AREAS
A. This Section includes the requirements for Contractor operations in:
1. Construction Trailer Parking Areas, located in the Contractor’s Staging and
Stockpile Area, as shown on the Drawings.
2. Staging and Stockpile Areas, located in the Contractor’s Staging and Stockpile
Area, as shown on the Drawings.
1.02 STAGING AND STOCKPILE AREAS
A. Park construction trailers in the areas identified as Staging and Stockpile Areas, if necessary.
B. Clean up and reclaim the Staging and Stockpile Area at the end of construction in accordance with Section 02901: Reclamation of Disturbed Areas.
C. Stockpile all construction materials in the identified Staging and Stockpile Areas.
D. Stockpiling of construction materials outside the identified limits of the Contractor
Staging and Stockpiling Areas is not permitted unless approved by the Contracting Officer's Representative.
1.03 SECURITY OF CONSTRUCTION TRAILERS, STAGING AND STOCKPILE AREA
A. The Contractor is responsible for securing the Staging and Stockpile Areas. The Contractor shall provide any security measures deemed necessary by the Contractor to protect the work areas. All security fences and gates, if required, shall be removed by the Contractor at the end of construction.
B. Requirements for construction trailers shall be in accordance with Section 01590:
Field Offices and Temporary Utilities.
A. Section 01590: Field Offices and Temporary Utilities
B. Section 02901: Reclamation of Disturbed Areas
Concrete Repairs at Crab Orchard Dam 01552-2 Staging, Stockpile, and October 2020 Waste Fill Areas
A. Compensation to the Contractor for all work required in this Section shall be included in the prices bid in the Bid Schedule for other items of Work. No separate payment will be made to the Contractor for Work required in this Section.
Concrete Repairs at Crab Orchard Dam 01590-1 Field Offices and Temporary Utilities
SECTION 01590
FIELD OFFICES AND TEMPORARY UTILITIES
A. This Section includes, but is not limited to, the requirements for furnishing:
1. Field Offices.
2. Electricity, Lighting, Heating, and Air Conditioning.
3. Telephone Service.
4. Water for Construction and Drinking.
5. Toilets.
1.02 CONTRACTOR’S FIELD OFFICE
A. The Contractor shall provide field office space sufficient to meet Contractor needs, including progress meetings, throughout the construction period. The field office may be a structure or trailer as approved by the COR. The Contractor’s field office shall be located in the Field Office Areas as shown on the Drawings. The Contractor may propose alternate field office locations, subject to approval by the Contracting Officer's Representative.
B. The Contractor shall equip the field office with adequate facilities for lighting, toilet, lavatory, and heating and air-conditioning as necessary. The Contractor shall provide electric power to the field office. The Field Office Areas contain existing Government electricity connections. The Contractor shall establish a metered connection for power with the local utility company and pay for the power as required. Portable power is not permitted to power the field office.
C. The Contractor shall provide security and facilities to protect the field office from unauthorized entry, vandalism or theft.
D. The field office shall remain the property of the Contractor at completion of the
Project. The field office shall meet all governing federal, state, and local regulations and codes.
1.03 CONSTRUCTION INSPECTOR’S FIELD OFFICE
A. The Contractor shall provide the Construction Inspector with a separate office space in the Contractor’s trailer with a desk, suitable office chair, and filing cabinet.
Concrete Repairs at Crab Orchard Dam 01590-2 Field Offices and Temporary Utilities
1.04 TEMPORARY UTILITIES - REFER TO FAR 52.236-14, AVAILABILITY AND USE
OF UTILITY SERVICES
A. Provide temporary electrical service as required to accomplish the construction, including powering HVAC, lighting, the field office, and any other use by the Contractor. Provide temporary electric feeder and electoral service for the field office. The Contractor may choose to provide temporary electrical service by providing portable power.
1. The Contractor shall be responsible for coordination and arranging services with the local utility companies.
2. The Contractor is responsible for the cost of electricity for his operations and for the field office.
1.05 LIGHTING
A. Provide light bulbs required for all temporary construction lighting and replace when necessary.
B. As needed, provide and maintain temporary lighting at all barricades as required for safety.
1.06 WATER FOR CONSTRUCTION AND DRINKING
A. The Contractor shall provide all water for construction and drinking. The water in Crab Orchard Reservoir is not available to the Contractor for construction use. Water from Crab Orchard Reservoir is not suitable for drinking and may not be used in preparing or placing concrete repair materials.
B. The Contractor shall provide, protect, and maintain adequate quantities of water for use on the Project, including adequate supplies of potable water complying with NSF/ANSI 61, Drinking Water System Components – Health Effects.
C. Water for construction use shall conform to the requirements of ASTM C 1602, and be clean and free from injurious amounts of oils, acids, alkalis, salts, organic materials, or other substances that may be deleterious to concrete or reinforcement.
D. Obtain permission from the Contracting Officer's Representative for obtaining water from other sources on the Refuge prior to using any such sources.
1.07 TOILETS
A. The Contractor shall provide and maintain suitable, weather-tight, painted, sanitary toilet facilities for all work persons during the construction period. When toilet facilities are no longer required, promptly remove them from the site. The Contractor shall at a minimum empty the facilities of waste, clean, and disinfect once per week.
Concrete Repairs at Crab Orchard Dam 01590-3 Field Offices and Temporary Utilities
B. Provide and maintain facilities in accordance with requirements of applicable local and state health authorities, OSHA, and the USBR manual titled Reclamation Safety and Health Standards.
C. Keep all toilet facilities clean and supplied with toilet paper at all times.
1.08 RELATED SECTIONS
A. Section 01552: Staging, Stockpile and Waste Fill Areas in the prices bid in the Bid Schedule for other items of Work. No separate payment
Concrete Repairs at Crab Orchard Dam 01590-4 Field Offices and Temporary Utilities
Concrete Repairs at Crab Orchard Dam 01700-1 Contract Closeout
SECTION 01700
CONTRACT CLOSEOUT
1.01 FINAL INSPECTION
A. Request a final inspection in writing at least ten (10) days prior to the anticipated date of completion.
B. Work will not be considered ready for final inspection until all the Work has been completed in full compliance with all contract terms and conditions. The Contractor or his project supervisor shall be at the job site during the final inspection.
1.02 CLEANING UP
A. Refer to FAR 52.236-12, Cleaning Up.
1.03 RECORD DOCUMENTS
A. Provide and maintain at the project site one complete job set of the drawings, shop drawings, and specifications in good, clean, and readable condition. The job set drawings and specifications shall be available for review at any time by the Contracting Officer's Representative.
B. Neatly inscribe on the drawings, shop drawings, and specifications job set all changes in work. Note changes with red pencil or red ink. Note all data and changes on the job set in sufficient detail and clarity and provide information necessary to prepare accurate record drawings. Information shall be recorded concurrently with construction progress. No work shall be concealed or covered in a manner that would prevent inspection until required information is recorded and approved by the Contracting Officer's Representative. Each item of actual construction shall be recorded. If record drawings are not kept up to date, the Contracting Officer's Representative may recommend retainage be withheld from progress payments.
C. Specifications shall be legibly marked and each item of actual construction recorded including the following:
1. Manufacturer, trade name, and model number of each product actually installed, particularly optional items and substitute items.
2. Changes made by addenda and modifications.
D. Maintain operation and maintenance information, inspection certifications, and field test records required by individual Specifications.
E. Submit the original job set of red-lined project drawings and specifications, signed by the Site Superintendent, at the time of final acceptance and prior to final payment.
Concrete Repairs at Crab Orchard Dam 01700-2 Contract Closeout
Note all data and changes on the marked-up project drawings in sufficient detail and clarity and provide information necessary for preparation of record drawings, including electronic files of survey data for instrumentation locations and elevations and any items or facilities that changed from the design drawings.
1.04 GUARANTEES, WARRANTIES, AND CERTIFICATES
A. Submit all guarantees, warranties, and certificates.
B. Refer to FAR 52.246-21, Warranty of Construction.
1.05 SUBMITTALS
A. Submit record documents, test reports, guarantees, and certificates in accordance with these Specifications and Section 01300: Submittals.
in the prices bid in the Bid Schedule for other items of Work. No separate payment to the Contractor will be made for Work required in this Section.
END OF DIVISION 1
DIVISION 2
SITE WORK
Concrete Repairs at Crab Orchard Dam 02139-1 Temporary Control of Water and October 2020 Reservoir Levels
SECTION 02139
TEMPORARY CONTROL OF WATER AND RESERVOIR LEVELS
A. Control of water and reservoir level during construction of concrete repair work at Crab Orchard Dam.
1.02 CONTROLLING RESERVOIR LEVEL DURING CONSTRUCTION
A. Reservoir Operations: The Crab Orchard Reservoir can be lowered to elevation 401.0 feet (4.0 feet below the crest of the service spillway) using the outlet works at the dam. The outlet works structure is located to the right of the service spillway and consists of three 5-foot wide by 6-foot high sluice gates. The lift assemblies are located on the operating deck below the bridge deck. The Reservoir can be lowered approximately 1 foot over a two-week period, assuming no additional inflow due to precipitation occurs. The Contractor shall be responsible for operation of the outlet works to control the Reservoir level as well as providing appropriate equipment to operate the outlet works. Prior to the start of Construction, the Contractor shall demonstrate proper operation of the outlet works to Refuge personnel, the Construction Inspector, and the COR. This demonstration shall be coordinated with the Construction Inspector and COR with two (2) weeks’ notice. The Contractor shall notify the Construction Inspector prior to operation of the outlet works. Rapid drawdown, which may compromise the stability of the dam, will be avoided. The reservoir water surface elevation may rise rapidly. The Contractor is responsible for monitoring weather forecasts and operating the outlet works if additional operation of the outlet works is necessary to control the Reservoir level based on anticipated forecasts. Normally gate settings will not be changed more than two times daily, and settings that would result in drawing the reservoir below the desired elevation will be avoided. If control is not required, the outlet gates will be closed, and releases will be over the service spillway. The reservoir shall not be drawn down below elevation
401.0 feet (4.0 feet below the crest of the spillway).
1.03 CONTROLLING WATER DURING CONSTRUCTION
A. Temporary diversion of water works within the reservoir is not deemed necessary to complete the concrete repair at Crab Orchard Dam and will not be permitted. The Contractor may utilize protective works on the crest of the spillway, such as sandbags, as outlined in Section 3.03C.
Concrete Repairs at Crab Orchard Dam 02139-2 Temporary Control of Water and October 2020 Reservoir Levels
3.03 CONTROLLING WATER AND RESERVOIR LEVELS DURING CONSTRUCTION
A. The Contractor will be required to maintain all work areas within the spillways in a dry, water-free condition. When needed, the Contractor will operate the outlet works as discussed in Section 02139 Article 1.04 to lower the Reservoir levels. Schedule all work when weather and project conditions permit satisfactory control of water.
Allow sufficient time in the work schedule for cleaning and drying of surfaces, inspection of surfaces by the Construction Inspector, and completion of Work.
B. When working on or near the spillway crest or in the channel downstream from the crest, if releases are made through the spillway, facilities shall be provided by the Contractor as necessary to isolate work areas from the releases.
C. To minimize the effects of waves over the spillway crest when the reservoir level is lowered, temporary installation of sand bags or other approved methods on the spillway crest will be permitted. Such installations will be limited to 50 percent of the crest length at a time. The installations shall be designed and constructed in a manner which will provide for rapid removal when directed by the Contracting Officer’s Representative or the Construction Inspector and shall not exceed 12 inches in height. In addition, these installations should be designed to be removed by high water in the event the site is unattended. Installation of such temporary devices is subject to the approval of the Construction Inspector and the Contracting Officer’s
D. After having served their purpose, all approved protective works shall be removed so as not to interfere with the operation or usefulness of either the spillways or outlet works and, in a manner, approved by the Construction Inspector and the Contracting Officer’s Representative.
3.04 DAMAGES AND DELAYS
A. During construction provide flood protection for all work. All damages and delays caused by inadequate flood protection during construction shall be the responsibility of the Contractor and the Contractor shall not be entitled to additional payment.
A. Temporary control of water and reservoir level will not be measured for payment.
A. Compensation to the Contractor for all costs associated with providing means for temporary control of water and the reservoir level will be made at the lump sum price in the Bid Schedule for Temporary Control of Water and Reservoir Level.
Concrete Repairs at Crab Orchard Dam 02212-1 Erosion Protection and October 2020 Sediment Control
SECTION 02212
EROSION PROTECTION AND SEDIMENT CONTROL
1.01 WORK INCLUDES
A. Designing and implementing all temporary erosion protection and sediment control facilities required to protect the reservoir and stream during the concrete repairs.
1.02 DEFINITIONS
A. Sediment and Erosion Control devices as defined herein shall mean silt fences, hay bales, sediment ponds, gravel for staging area, or other devices approved by the
1.03 SUBMITTALS
A. At least 10 calendar days prior to beginning of any construction work, submit a plan to the Contracting Officer’s Representative for review, comment, and acceptance, showing the Contractor’s methods for control of surface water runoff. If the Contractor does not feel erosion and sedimentation control measures are necessary to complete the project, the Contractor shall submit a letter to Contracting Officer’s Representative indicating as such for review and acceptance. The plan shall be in accordance with Section 01300: Submittals.
2.01 EROSION AND SEDIMENT CONTROL
A. Product data for the product proposed by the Contractor for erosion and sediment control will be submitted with the erosion and sediment control plan.
3.01 EROSION AND SEDIMENT CONTROL
A. The means and methods to install erosion and sediment control measures at the project site will be included within the erosion and sediment control plan.
B. Do not remove silt fences or other erosion control facilities without written approval from the Contracting Officer's Representative.
Concrete Repairs at Crab Orchard Dam 02212-2 Erosion Protection and October 2020 Sediment Control in the prices bid in the Bid Schedule for other items of Work. Separate payment to the Contractor shall not be made for any of the Work required in this Section.
Concrete Repairs at Crab Orchard Dam 02901-1 Reclamation of Disturbed Areas
SECTION 02901
RECLAMATION OF DISTURBED AREAS
1.01 WORK INCLUDES
A. Reclaiming disturbed areas resulting from the concrete repairs at Crab Orchard Dam.
B. Reclaiming disturbed areas of the Contractor Staging and Stockpile Areas, if required.
1.02 PROTECTION
A. Areas outside the limits of site disturbance shall be protected from damage by the Contractor. Any disturbance of vegetation or native ground outside of the limits of site disturbance shown on the Drawings shall be reclaimed by the Contractor at no additional expense to the Government.
1.03 RELATED SECTIONS
A. Section 01552: Staging, Stockpile, and Waste Fill Areas
B. Section 02212: Erosion Protection and Sediment Control
2.01 RECLAMATION MATERIALS
A. Approved topsoil, grass seed, fertilizer and other materials will be provided by the Contractor to restore disturbed areas as needed.
3.01 PREPARING AND SEEDING DISTURBED AREAS
A. Prior to reclaiming any disturbed area, remove all Contractor's equipment, debris, construction materials, office facilities, temporary fences, or gates, and all other Contractor's properties.
B. Evenly grade disturbed areas as needed.
C. Place topsoil, fertilizer, and seed within and outside areas affected by construction.
Reseed and re-fertilize areas that fail to show uniform stand of grass.
Concrete Repairs at Crab Orchard Dam 02901-2 Reclamation of Disturbed Areas in the prices bid in the Bid Schedule for other items of Work. Separate payment to the Contractor shall not be made for any of the Work required in this Section.
END OF DIVISION 2
DIVISION 3
CONCRETE
Concrete Repairs at Crab Orchard Dam 03100-1 Concrete Formwork
SECTION 03100
CONCRETE FORMWORK
A. Formwork for service spillway ogee crest and other concrete repairs.
1.02 RELATED SECTIONS
A. Section 03200: Concrete Reinforcement
B. Section 03300: Structural Concrete
C. Section 03370: Concrete Curing
D. Section 03392: Concrete Repair
1.03 REFERENCES
A. ACI 318: Building Code Requirements for Structural Concrete.
B. ACI 301: Standard Specification for Structural Concrete.
C. ACI 347R: Guide to Formwork for Concrete.
D. PS 1: Construction and Industrial Plywood.
E. Where these Specifications differ from the requirements of ACI, the more stringent requirements shall apply.
1.04 SYSTEM DESCRIPTION
A. Design, engineer, and construct formwork, shoring, and bracing to meet design and code requirements so that resultant concrete conforms to required shapes, lines, and dimensions shown on the Drawings.
1.05 QUALITY ASSURANCE
A. Construct and erect concrete formwork in accordance with ACI 301 and the recommendations of ACI 347R.
1.06 REGULATORY REQUIREMENTS
Concrete Repairs at Crab Orchard Dam 03100-2 Concrete Formwork
A. Conform to all applicable local, municipal, state, and federal building code regulations.
1.07 SUBMITTALS
A. Shop drawings for formwork shall be submitted to the Contracting Officer’s Representative and the Construction Inspector at least 10 days prior to use of the formwork.
B. Submit formwork product data under provisions of Section 01300: Submittals.
2.01 FORM MATERIALS
A. Plywood: Douglas Fir species; solid one side grade; sound, undamaged sheets with straight edges.
B. Glass Fiber Fabric Reinforced Plastic Forms: Matched, tight fitting, stiffened to withstand the pressure resulting from placement and vibration of concrete without deflection detrimental to structural tolerances and appearance of finished concrete surfaces.
C. Lumber: Fir species; No. 2 grade or better; with grade stamp clearly visible.
D. Steel: Minimum 16 gage sheet, well matched, tight fitting, stiffened to withstand the pressure resulting from placement and vibration of concrete without deflection detrimental to structural tolerances and appearance of finished concrete surfaces.
2.02 FORMWORK ACCESSORIES
A. Form Ties: Removable metal or fixed cone type; 3/4-inch break back dimension; free of defects that will leave holes larger than 1-inch-diameter in concrete surface.
B. Form Release Agent: Colorless material which will not stain concrete, absorb moisture, or impair natural bonding or color characteristics of concrete.
C. Fillets for Chamfered Corners and All Exposed Edges: Shall be wood strips or rigid plastic, 3/4-inch by 3/4-inch, unless otherwise shown on the Drawings.
D. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Sized as required; of strength and character to maintain formwork in place while placing concrete.
Concrete Repairs at Crab Orchard Dam 03100-3 Concrete Formwork
3.01 INSPECTION
A. Verify lines, levels, and measurements before proceeding with formwork.
3.02 PREPARATION
A. Hand-trim sides and bottoms of earth forms; remove loose dirt prior to placing concrete.
B. Minimize form joints and symmetrically align joints and make forms watertight to prevent leakage of mortar and concrete.
C. Arrange and assemble formwork to permit stripping so that concrete is not damaged during the removal.
D. Arrange forms to allow stripping without removal of principal shores, where required to remain in place.
3.03 ERECTION
A. Provide bracing to ensure stability of formwork. Strengthen formwork liable to be overstressed by construction loads.
B. Provide temporary ports in formwork to facilitate cleaning and inspection. Locate openings at bottom of forms to allow flushing water to drain. Close ports with tight fitting panels, flush with inside face of forms, neatly fitted so that joints will not be apparent in exposed concrete surfaces.
C. Provide chamfer strips on all exposed corners.
D. Construct formwork to maintain tolerances in accordance with Section 2 of ACI 301, Manual of Concrete Practice.
3.04 APPLICATION OF FORM RELEASE AGENT
A. Apply form release agent on formwork in accordance with manufacturer's instructions. Apply prior to placing reinforcing steel, anchoring devices, and embedded items.
B. Do not apply form release agent where concrete surfaces are scheduled to receive special finishes which may be affected by the agent. Soak contact surfaces of untreated forms with clean water. Keep surfaces wet prior to placing concrete.
C. After form release agent is applied to form, the concrete shall be placed within 14 days. If concrete is not placed within 14 days, the forms shall be removed, cleaned, and form release agent reapplied.
Concrete Repairs at Crab Orchard Dam 03100-4 Concrete Formwork
3.05 INSERTS, EMBEDDED PARTS, AND OPENINGS
A. Provide formed openings where required for work embedded in or passing through concrete.
B. Coordinate work of other sections in forming and setting openings, slots, recesses, chases, sleeves, bolts, anchors, and other inserts.
C. Install accessories, in accordance with manufacturer's instructions, level, and plumb.
Ensure items are not disturbed during concrete placement.
3.06 FORM REMOVAL
A. Notify Contracting Officer's Representative prior to removing formwork.
B. Do not remove forms until concrete has sufficient strength to support its own weight and construction and design loads that may be imposed upon it. Remove load supporting forms when concrete has attained 75 percent of required 28-day compressive strength as demonstrated by QC testing of test cylinders.
C. Do not remove any forms prior to 24 hours but not greater than 72 hours to allow for repairs if needed after completion of the respective concrete placement.
D. Do not damage concrete surfaces during form removal.
E. Finish all concrete surfaces prior to applying curing compound, in accordance with the requirements of Section 03300: Concrete, and Section 03370: Concrete Curing.
3.07 CLEANING
A. Clean forms to remove foreign matter as erection proceeds.
B. Ensure that water and debris drain to exterior through clean-out ports.
C. During cold weather, remove ice and snow from forms. Do not use de-icing salts.
Do not use water to clear out completed forms, unless formwork and construction proceed within heated enclosure. Use compressed air to remove foreign matter.
A. Concrete formwork will not be measured for payment.
Concrete Repairs at Crab Orchard Dam 03100-5 Concrete Formwork
A. All work required in this Section shall be included in the prices bid in the Bid Schedule for items for which concrete formwork is required. No separate payment
Concrete Repairs at Crab Orchard Dam 03100-6 Concrete Formwork
Concrete Repairs at Crab Orchard Dam 03200-1 Concrete Reinforcement
SECTION 03200
CONCRETE REINFORCEMENT
A. Section Includes: Furnishing and installing reinforcement for concrete structures and concrete repairs.
A. Section 03100: Concrete Formwork
B. Section 03300: Structural Concrete
C. Section 03392: Concrete Repairs
D. Section 03811: Concrete Removal
A. ACI 315: Details and Detailing of Concrete Reinforcement.
B. ACI 318; Building Code Requirements for Reinforced Concrete.
C. ASTM A 615: Standard Specification for Deformed and Plain Billet-Steel Bars for
Concrete Reinforcement.
D. ASTM A663; Specification for Steel Bars, Carbon, Merchant Quality, Mechanical
Properties.
E. ASTM A1064; Standard Specification for Carbon-Steel Wire and Welded Wire
Reinforcement, Plain and Deformed, for Concrete.
F. CRSI: Manual of Standard Practice.
G. Where these Specifications differ from the requirements of ACI, the more stringent requirements shall apply.
1.03 SUBMITTALS
A. Submit Drawings and Product Data:
1. Prepare shop drawings of concrete reinforcement in accordance with
American Concrete Institute's ACI 315.
Concrete Repairs at Crab Orchard Dam 03200-2 Concrete Reinforcement
2. Provide drawings showing all fabrication dimensions and locations for placing reinforcement and bar supports; indicate bending diagrams, splicing and lap of rods, shapes, dimensions and details of bar reinforcing and accessories.
B. Test Reports:
1. Submit copies of reports showing the results of tests, conducted in accordance with the American Society for Testing and Materials Specifications.
2. Test Requirements may be waived, based upon certified copies of mill test reports.
1.04 DELIVERY STORAGE AND HANDLING
A. Storage of Materials:
1. Store reinforcing materials in a manner to prevent excessive rusting and fouling with dirt, grease and other bond-breaking coatings.
2. Identify bundles of reinforcing steel with tags wired to steel.
2.01 MATERIALS
A. Reinforcing Steel:
1. Reinforcing Bars: ASTM A615, Grade 60, deformed steel.
2. Wire: ASTM A82
3. Welded Wire Fabric: ASTM A185
4. Metal…