B08_Attachment_7_-_Drawings_-_Exhibit_C.pdf
PDF 3 MB Posted
- Solicitation number
- 140P9725Q0053
About this file
These architectural drawings detail the roof recovery project for the White Pass Administration Building located at 290 2nd Avenue SE in Skagway, Alaska, within the Klondike Gold Rush National Historical Park. The documents, dated December 2024, comprehensively illustrate the roof recover process, including detailed parapet section and elevation details across seven sheets. The project involves removing existing parapet cladding, reinstalling metal flashings, installing new 3/4" thick vertical tongue-and-groove painted siding, and recovering the existing roof membrane with specific attention to maintaining the building's historical aesthetic. Key specifications include using treated wood furring, color-matching paint to existing surfaces, and ensuring proper drainage and fastening techniques for the new cladding and roofing system. The drawings show a phased approach with work conducted both before and after the roofing contractor's primary recovery efforts, with precise instructions for preserving and reinstalling original architectural elements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHITE PASS ADMINISTRATION
BUILDING ROOF RECOVER
COVER SHEET
A0.0
DECEMBER, 2024
2ND AVENUE
B R
O A
D W
A Y
PROJECT LOCATION
290 2ND AVENUE SE, SKAGWAY ALASKA 99804
BROADW
AY 2ND AVENUE
VIS
IT
OR'S
C
ENTER
(N
OT IN
S
COPE)
ADM
IN
IS
TRATIO
N B
UIL
DIN
G
REFERENCE S
HEET A
1.
VICINITY MAP
ADMINISTRATION BUILDING ROOF LOOKING SOUTHWEST
ADMINISTRATION BUILDING ROOF LOOKING NORTHEAST
NORTH
EAST AND WEST PARAPET ELEVATIONS
3/A1.0 - EAST PARAPET ELEVATION, (MATCHES WEST ELEVATION)
WHITE PASS ADMINISTRATION
BUILDING ROOF RECOVER
ROOF PLAN
REFERENCE SUBSEQUENT DETAIL SHEETS FOR
SCOPE OF WORK AND PHASING
ROOF PLAN - EXISTING CONDITIONS AND DETAIL LOCATIONS1
2/ A
1.
N
O R
T H
P A
R A
P E
T E
LE
V
A T
IO
N
NORTH
A1.0
A1.0
SIMILAR
SIMILAR
82'-2", VERIFY IN FIELD
'-8
V
E R
IF
Y
IN
F
IE
LD
EXISTING ROOF ASSEMBLY
1982 RESTORATION
- 4-PLY BUILT-UP MEMBRANE
- 1/2" PLYWOOD
1900 WOOD FRAMING
- 1X12 PLANKS
- 2X12 JOISTS, 16" ON CENTER
EXISTING PARAPET CLADDING
E X
IS
T
IN
G
P A
R A
P E
T C
LA
D
D
IN
G
A1.0
A1.0
A3.1
A3.2
A3.2 1
A3.3
A3.3
A3.4
A3.5
EXISTING MECHANICAL CURBS AND VENT CAPS
EXISTING MECHANICAL CURBS AND VENT CAPS
EXISTING MECHANICAL CURBS AND VENT CAPS
EXISTING BOILER FLUE
EXISTING ANTENNA
EXISTING SKYLIGHT
EXISTING 6" WIDE METAL GUTTER
SLOPE 1/2" PER FOOT
DECEMBER, 2024
FALL ANCHOR
(NPS WORK CONDUCTED
BEFORE ROOFING CONTRACTOR)
FALL ANCHOR
(NPS WORK CONDUCTED
BEFORE ROOFING CONTRACTOR)
RECOVER ROOFING SYSTEM
BUILDING ROOF RECOVER
DETAILS
NPS WORK CONDUCTED
BEFORE ROOFING CONTRACTOR
NPS WORK CONDUCTED
AFTER ROOFING CONTRACTOR
ROOFING CONTRACTOR
RECOVER EXTENTS
PARAPET SECTION DETAIL (x3) A3.1
REMOVE PARAPET
CLADDING FROM THE
INSIDE FACE OF PARAPET
REMOVE FOIL FACED
FLASHING AT ROOF EDGE
BUILT UP ROOF
MEMBRANE TO
REMAIN IN PLACE
REMOVE AND RETAIN
METAL FLASHING
BEHIND AND BELOW
CLADDING
REINSTALL METAL FLASHING
AS IT WAS ORIGINALLY INSTALLED.
INSTALL NEW PARAPET CLADING
-1X6 TREATED WD FURRING, TOP AND BOTTOM
-3/4" THICK VERTICAL T&G PAINTED SIDING
CLADDING NOTES:
1) COLOR MATCH PAINT TO EXISTING
2)KERF BACKSIDE OF BOTTOM FURRING
TO ALLOW DRAINAGE
3) THRU-FASTEN FURRING AND SIDING TO
PARAPET FRAMING AND SHEATING WITH
4" TIMBERLOK OR LEDGERLOK OR EQUAL
STRUCUTURAL FASTENER, 24" ON CENTER.
ALL FASTENERS TO BE SET IN MEMBRANE
MANUFACTURER APPROVED SEALANT.
GREY POCHE INDICATES
EXISTING CONDITIONS THAT ARE
OUTSIDE OF THIS PROJECT'S WORK AREA,
THEY ARE ITEMS TO REMAIN UNALTERED
DECEMBER, 2024
TERMINATION BAR
DETAILS
NPS WORK CONDUCTED
BEFORE ROOFING CONTRACTOR
NPS WORK CONDUCTED
AFTER ROOFING CONTRACTOR
ROOFING CONTRACTOR
RECOVER EXTENTS
PARAPET SECTION DETAIL (x3) A3.2
REMOVE AND RETAIN
PARAPET CAP FLASHING
REMOVE FOIL FACED
FLASING AT ROOF EDGE
BUILT UP ROOF
MEMBRANE TO
REMAIN IN PLACE
UNKNOWN BLOCKING
ARRANGEMENT
DADO TOP OF WOOD BLOCKING FOR
FUTURE ROOFING TERMINATION BAR.
COORDINATE DADO SIZE WITH
ROOFING CONTRACTOR
REINSTALL PARAPET CAP FLASHING
AS IT WAS ORIGINALLY INSTALLED
GREY POCHE INDICATES
EXISTING CONDITIONS THAT ARE
OUTSIDE OF THIS PROJECT'S WORK AREA,
THEY ARE ITEMS TO REMAIN UNALTERED
DECEMBER, 2024
RECOVER ROOFING SYSTEM
TERMINATION BAR
B
LO
C K
IN
G
H E
IG
H
T V
A R
IE
S
NPS WORK CONDUCTED
BEFORE ROOFING CONTRACTOR
NPS WORK CONDUCTED
AFTER ROOFING CONTRACTOR
ROOFING CONTRACTOR
RECOVER EXTENTS
WHITE PASS ADMINISTRATION
BUILDING ROOF RECOVER
DETAILS
PARAPET SECTION DETAIL (x3)
A3.3
4" EXISTING
CANT
REMOVE PARAPET
CLADDING FROM THE
INSIDE FACE OF PARAPET
REMOVE FOIL FACED
FLASHING AT ROOF EDGE
BUILT UP ROOF
MEMBRANE TO
REMAIN IN PLACE
REINSTALL PARAPET CAP FLASHING, BLOCKING,
AND TRIM AS IT WAS ORIGINALLY INSTALLED
UTILIZE NEW CUSTOM FLASHING
BETWEEN PARAPET CAP AND
PARAPET CLADDING
ELEVATION DETAIL OF
PARAPET CLADDING
FASTENER, TYPICAL
MAINTAIN CLADDING HEIGHT
ABOVE ROOF SURFACE,
MATCH EXISTING
INSTALL NEW PARAPET CLADING
-1X6 TREATED WD FURRING, TOP AND BOTTOM
-3/4" THICK VERTICAL T&G PAINTED SIDING
CLADDING NOTES:
1) COLOR MATCH PAINT TO EXISTING
2)KERF BACKSIDE OF BOTTOM FURRING
TO ALLOW DRAINAGE
3) THRU-FASTEN FURRING AND SIDING TO
PARAPET FRAMING AND SHEATING WITH
4" TIMBERLOK OR LEDGERLOK OR EQUAL
STRUCUTURAL FASTENER 24" ON CENTER.
ALL FASTENERS TO BE SET IN MEMBRANE
MANUFACTURER APPROVED SEALANT.
4" 1" 2" 1"
REMOVE AND RETAIN PARAPET
CAP FLASHING, BLOCKING AND TRIM
(BLOCKING ARRANGEMENT IS UNKNOWN)
EXISTING
CORNICE
GREY POCHE INDICATES
EXISTING CONDITIONS THAT ARE
OUTSIDE OF THIS PROJECT'S WORK AREA,
THEY ARE ITEMS TO REMAIN UNALTERED
DECEMBER, 2024
RECOVER ROOFING SYSTEM
TERMINATION BAR MODIFY BACK OF TRIM TO
ACCOMODATE TERMINATION BAR
8 1/8" 8 7/8"
NPS WORK CONDUCTED
BEFORE ROOFING CONTRACTOR
NPS WORK CONDUCTED
AFTER ROOFING CONTRACTOR
ROOFING CONTRACTOR
RECOVER EXTENTS
WHITE PASS ADMINISTRATION
BUILDING ROOF RECOVER
DETAILS
PARAPET SECTION DETAIL (x3)
A3.4
REMOVE AND RETAIN PARAPET
CAP FLASHING AND BLOCKING
(BLOCKING ARRANGEMENT IS UNKNOWN)
REMOVE PARAPET
CLADDING FROM THE
INSIDE FACE OF PARAPET
REMOVE FOIL FACED
FLASHING AT ROOF EDGE
REMOVE DRIP EDGE
(BUILT UP ROOF
MEMBRANE TO
REMAIN IN PLACE)
REINSTALL PARAPET CAP FLASHING AND
BLOCKING AS IT WAS ORIGINALLY INSTALLED
INSTALL NEW 3/4" THICK VERTICAL T&G PAINTED
PARAPET CLADDING DIRECTLY TO THE
PARAPET FRAMING (NO FURRING).
REMOVE AND REPLACE WITH A
GUTTER MATCHING THE EXISTING
MATERIALS AND APPEARANCE
MEMBRANE SECURED
TO GUTTER
REMOVE PARAPET
CLADDING FROM
THE END OF THE PARAPET
REMOVE SOLID WOOD TRIM FROM
THE END OF THE PARAPET,
ABOVE THE CORNICE
INSTALL NEW PAINTED SOLID WOOD TRIM,
MATCH ALL ASPECTS OF THE EXISTING TRIM.
A3.4
A3.4
A3.4
GREY POCHE INDICATES
EXISTING CONDITIONS THAT ARE
OUTSIDE OF THIS PROJECT'S WORK AREA,
THEY ARE ITEMS TO REMAIN UNALTERED
INSTALL NEW PAINTED SOLID WOOD COPING TRIM
BETWEEN METAL CAP FLASHING AND THE
NEW CUSTOM FLASHING. MATCH ALL ASPECTS
OF THE EXISTING TRIM ON THE OUTSIDE FACE.
E X
P O
S E
D P
A R
A P
E T
F R
A M
IN
G
A N
D S
H E
A T
H
IN
G
DECEMBER, 2024
SEAL WITH PAINTABLE SILICONE SEALANT ALL
CORNERS AND JOINTS OF WOOD TRIM AND
PARAPET CLADDING AT THE PARAPET'S END.
RECOVER ROOFING SYSTEM MEMBRANE
TERMINATION BAR
TERMINATION BAR
A
LI
G N
RECOVER ROOFING SYSTEM MEMBRANE
A3.5 WHITE PASS ADMINISTRATION
DETAILS
PARAPET ELEVATION DETAIL (x3)
NPS WORK CONDUCTED
BEFORE ROOFING CONTRACTOR
NPS WORK CONDUCTED
AFTER ROOFING CONTRACTOR
ROOFING CONTRACTOR
RECOVER EXTENTS
REMOVE PARAPET
CLADDING FROM THE
INSIDE FACE OF PARAPET
E X
IS
T
IN
G
C
O R
N
IC
E
MEMBRANE BELOW
E X
IS
T
IN
G
C O
R N
IC
E
GREY POCHE INDICATES
EXISTING CONDITIONS THAT ARE
OUTSIDE OF THIS PROJECT'S WORK AREA,
THEY ARE ITEMS TO REMAIN UNALTERED
REMOVE PARAPET
CLADDING FROM
THE END OF THE PARAPET
REMOVE SOLID WOOD TRIM FROM
THE END OF THE PARAPET,
ABOVE THE CORNICE
E X
IS
T
IN
G
C O
R N
IC
E
INSTALL NEW PARAPET CLADDING
-1X6 TREATED WD FURRING,
TOP AND BOTTOM
-3/4" THICK, VERTICAL,
T&G PAINTED SIDING
UTILIZE 8" WIDE SIDING PANEL AT
WALL END TO SPAN MEMBRANE
TERMINATION AND SECURELY
CONNECT TO PANELS AT
PARAPET END
INSTALL NEW PAINTED
SOLID WOOD TRIM
MATCHING EXISTING
INSTALL NEW PAINTED
PARAPET CLADDING
DECEMBER, 2024
REMOVE AND REPLACE WITH A
GUTTER MATCHING THE EXISTING
MATERIALS AND APPEARANCE
File details come from the government source that posted it. Updated .