Basis of Estimate

Class B Construction Cost Estimate Template
National Park Service (NPS) - Denver Service Center (DSC) | 5-27-21
By using this Construction Cost Estimate template, you acknowledge you read and understand the corresponding Instructions.

PROJECT INFORMATION

Project:Project Name
Park:Park Name
Park Alpha:Park Code
PMIS:TBD or PMIS number if known
Estimate Date:Estimate Date
Prepared By:Estimator Name
Company:Company
Address:Address
City, State Zip:City
Phone:Phone

BACKGROUND SUPPORTING MATERIAL (Scope of Work):

Briefly describe scope of work included in the estimate, plan dates, exclusions, etc. List any Government Furnished Property (GFP)

SOURCE OF COST DATA:

Document all sources of cost information used in the estimate. (Attach additional information if necessary)

ESTIMATE ASSUMPTIONS:

Describe any assumptions made to prepare estimate and highlight areas needing clarification for future estimates.

MAJOR CHANGES FROM PREVIOUS ESTIMATE:

Describe any major changes in scope of work, materials, systems, assumptions, etc. from the previous estimate version.

DESCRIPTION OF MARK-UP & ADD-ONS:

Location Factor:0.00%Describe source and rationale for location factor here
Remoteness Factor:0.00%Site is___miles from published commercial center. Describe other impacts included
Wage Rate Factor:0.00%Explain method and justify value
State & Local Taxes:0.00%Describe type of tax and rates used
Design Contingency:0.00%Explain & Justify
Standard. General Conditions:0.00%Explain & Justify
Government General Conditions:0.00%Explain & Justify
Historic Preservation Factor:0.00%Describe rationale for using this factor
Contractor Overhead:0.00%Explain & Justify
Contractor Profit:0.00%Explain & Justify
Bonds and Permits:0.00%Explain & Justify
Contracting Method Adjustment:0.00%Describe anticipated contract method and justify value used.
Annual Inflation Escalation Factor:0.00%Projected annual inflation rate.
Time Until Project Midpoint (Months)0Number of months from estimate (or data) date until the projects midpoint of construction.

OTHER COMMENTS:

Provide any additional information, qualifications, etc.

&"Arial,Bold"United States Department of the Interior National Park Service Class B Construction Cost Estimate&4

&13BASIS OF ESTIMATE

&6&F &A &11Page &P of &N &6Print Date: &D

When using City Cost Index (CCI) published by RS Means, a CCI of 112.1 should be converted to +12.1 location factor and a CCI of 93.5 converted to a -6.5 location factor.

Project Cost Summary

Project:Paint Exterior and Refinish Interior Floors of the Historic Roeder House Bldg 16/16AEstimate By:Estimator Name
Park:Harpers Ferry National Historical ParkDate:Estimate Date
Park Alpha:HAFE
Reviewed By:Reviewer Name
Date:Review Date
Asset / Project ElementSize/CountUnits
Asset / Project Element Name100Unit
Item No.WBSDescriptionMaterial Cost/UnitTotal Material CostInstallation Cost/UnitTotal Install CostDirect Cost/UnitTotal Direct CostsNET Cost/UnitTotal NET Costs
1C30Interior Finishes$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0ERROR:#DIV/0!ERROR:#DIV/0!
2B20Exterior Enclosure$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0ERROR:#DIV/0!ERROR:#DIV/0!
3E10Equipment$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0ERROR:#DIV/0!ERROR:#DIV/0!
4XXSpecial Use - 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0ERROR:#DIV/0!ERROR:#DIV/0!

Subtotal Direct Construction Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $0 ERROR:#DIV/0! ERROR:#DIV/0!

Remoteness Factor0.00%$0
State & Local Taxes0.00%$0
Total Direct Construction Costs$0
General & Adminstration Costs0.00%$0
Historic Preservation Factor0.00%$0
Subtotal NET Construction Cost$0
Overhead0.00%$0
Profit0.00%$0
Estimated NET Construction Cost$0
Bonds & Permits0.00%$0
Contracting Method Adjustment0.00%$0
Inflation Escalation0MonthsAnnual Rate =0.00%$0
Total Estimated NET Cost of Construction$0

Class B Construction Cost Estimate&4 &"Arial,Regular" &"Arial,Bold"&13PROJECT COST SUMMARY

&6&F &A Page &P of &N &6Print Date: &D, &T

B20 - Exterior Enclosure

Summary Item B20 Exterior Enclosure Total Cost: $0

Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
B2010EXTERIOR WALLS
Basic RequirementStucco Repairs80sq$ - 0$0$ - 0$0$ - 0$0

SUBTOTAL EXTERIOR WALLS 100 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0

Summary ItemB20Exterior Enclosure
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost

B20 Exterior Enclosure 100 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0

Class B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY

&6&F, &A &9&P of &N &6&D &T

C30 - Interior Finishes

Summary Item C30 Interior Finishes Total Cost: $0

Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
C3010WALL FINISHES
Basic RequirementLoss of Key, Severely Cracked or Bulging Wall Plaster175SF$ - 0$0$ - 0$0$ - 0$0
Basic RequirementCracked, Chipped, or Crumbling Wall Plaster175SF$ - 0$0$ - 0$0$ - 0$0
Basic RequirementRe-adhere Loose Plaster Fragments5SF$ - 0$0$ - 0$0$ - 0$0
Basic RequirementPlaster Crack Repairs75LF$ - 0$0$ - 0$0$ - 0$0
Basic RequirementLimewash Coating & Paint Stabilization500SF$ - 0$0$ - 0$0$ - 0$0
Basic RequirementWallpaper Stabilization3SF$ - 0$0$ - 0$0$ - 0$0
Basic RequirementLath Stabilization5SF$ - 0$0$ - 0$0$ - 0$0
SUBTOTALWALL FINISHES100Unit$ - 0$0$ - 0$0$ - 0$0
Summary ItemC30Interior Finishes
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
C3020FLOOR FINISHES
Basic RequirementWood Floor Finish Cleaning1300SF$ - 0$0$ - 0$0$ - 0$0
SUBTOTALFLOOR FINISHES100Unit$ - 0$0$ - 0$0$ - 0$0
Summary ItemC30Interior Finishes
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
C3030CEILING FINISHES
Basic RequirementConsolidate Plaster75SF$ - 0$0$ - 0$0$ - 0$0
Basic RequirementRaise-Re-adhere Distorted Plaster50SF$ - 0$0$ - 0$0$ - 0$0
SUBTOTALCEILING FINISHES100Unit$ - 0$0$ - 0$0$ - 0$0
Summary ItemC30Interior Finishes
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost

C30 Interior Finishes 100 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0

Class B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY

&6&F, &A &9&P of &N &6&D &T

E10 - Equipment

Summary Item E10 Equipment Total Cost: $0

Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
F1010SPECIAL STRUCTURES
Basic RequirementTemporary Site Protection1LS$ - 0$0$ - 0$0$ - 0$0
Basic RequirementShoring and Bracing1LS$ - 0$0$ - 0$0$ - 0$0
Basic RequirementEquipment Rental0.5Months$ - 0$0$ - 0$0$ - 0$0
Basic RequirementSmall Tools1LS$ - 0$0$ - 0$0$ - 0$0
SUBTOTALSPECIAL STRUCTURES100Unit$ - 0$0$ - 0$0$ - 0$0
Summary ItemE10Equipment
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost

E10 Equipment 100 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0

Class B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY

&6&F, &A &9&P of &N &6&D &T

Special Use- 1

Summary Item XX Special Use - 1 Total Cost: $0

Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost
BASE CODEBASE ELEMENT
Basic RequirementField Personal, Safety4wk$ - 0$0$ - 0$0$ - 0$0
Basic RequirementField Personal, Superintendent6wk$ - 0$0$ - 0$0$ - 0$0
Basic RequirementField Personal, Quality Control3wk$ - 0$0$ - 0$0$ - 0$0
SUBTOTALBASE ELEMENT100Unit$ - 0$0$ - 0$0$ - 0$0
Summary ItemXXSpecial Use - 1
Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALS
Material Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal Cost

XX Special Use - 1 100 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0

Class B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY

&6&F, &A &9&P of &N &6&D &T