Basis of Estimate
| Class B Construction Cost Estimate Template |
| National Park Service (NPS) - Denver Service Center (DSC) | 5-27-21 |
| By using this Construction Cost Estimate template, you acknowledge you read and understand the corresponding Instructions. |
PROJECT INFORMATION
| Project: | Project Name |
| Park: | Park Name |
| Park Alpha: | Park Code |
| PMIS: | TBD or PMIS number if known |
| Estimate Date: | Estimate Date |
| Prepared By: | Estimator Name |
| Company: | Company |
| Address: | Address |
| City, State Zip: | City |
| Phone: | Phone |
BACKGROUND SUPPORTING MATERIAL (Scope of Work):
Briefly describe scope of work included in the estimate, plan dates, exclusions, etc. List any Government Furnished Property (GFP)
SOURCE OF COST DATA:
Document all sources of cost information used in the estimate. (Attach additional information if necessary)
ESTIMATE ASSUMPTIONS:
Describe any assumptions made to prepare estimate and highlight areas needing clarification for future estimates.
MAJOR CHANGES FROM PREVIOUS ESTIMATE:
Describe any major changes in scope of work, materials, systems, assumptions, etc. from the previous estimate version.
DESCRIPTION OF MARK-UP & ADD-ONS:
| Location Factor: | 0.00% | Describe source and rationale for location factor here |
| Remoteness Factor: | 0.00% | Site is___miles from published commercial center. Describe other impacts included |
| Wage Rate Factor: | 0.00% | Explain method and justify value |
| State & Local Taxes: | 0.00% | Describe type of tax and rates used |
| Design Contingency: | 0.00% | Explain & Justify |
| Standard. General Conditions: | 0.00% | Explain & Justify |
| Government General Conditions: | 0.00% | Explain & Justify |
| Historic Preservation Factor: | 0.00% | Describe rationale for using this factor |
| Contractor Overhead: | 0.00% | Explain & Justify |
| Contractor Profit: | 0.00% | Explain & Justify |
| Bonds and Permits: | 0.00% | Explain & Justify |
| Contracting Method Adjustment: | 0.00% | Describe anticipated contract method and justify value used. |
| Annual Inflation Escalation Factor: | 0.00% | Projected annual inflation rate. |
| Time Until Project Midpoint (Months) | 0 | Number of months from estimate (or data) date until the projects midpoint of construction. |
OTHER COMMENTS:
Provide any additional information, qualifications, etc.
&"Arial,Bold"United States Department of the Interior National Park Service Class B Construction Cost Estimate&4
&13BASIS OF ESTIMATE
&6&F &A &11Page &P of &N &6Print Date: &D
When using City Cost Index (CCI) published by RS Means, a CCI of 112.1 should be converted to +12.1 location factor and a CCI of 93.5 converted to a -6.5 location factor.
Project Cost Summary
| Project: | Paint Exterior and Refinish Interior Floors of the Historic Roeder House Bldg 16/16A | Estimate By: | Estimator Name | ||
| Park: | Harpers Ferry National Historical Park | Date: | Estimate Date | ||
| Park Alpha: | HAFE | ||||
| Reviewed By: | Reviewer Name | ||||
| Date: | Review Date | ||||
| Asset / Project Element | Size/Count | Units | |||
| Asset / Project Element Name | 100 | Unit |
| Item No. | WBS | Description | Material Cost/Unit | Total Material Cost | Installation Cost/Unit | Total Install Cost | Direct Cost/Unit | Total Direct Costs | NET Cost/Unit | Total NET Costs |
| 1 | C30 | Interior Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 2 | B20 | Exterior Enclosure | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 3 | E10 | Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
| 4 | XX | Special Use - 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#DIV/0! | ERROR:#DIV/0! |
Subtotal Direct Construction Costs $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $0 ERROR:#DIV/0! ERROR:#DIV/0!
| Remoteness Factor | 0.00% | $0 | |||
| State & Local Taxes | 0.00% | $0 | |||
| Total Direct Construction Costs | $0 | ||||
| General & Adminstration Costs | 0.00% | $0 | |||
| Historic Preservation Factor | 0.00% | $0 | |||
| Subtotal NET Construction Cost | $0 | ||||
| Overhead | 0.00% | $0 | |||
| Profit | 0.00% | $0 | |||
| Estimated NET Construction Cost | $0 | ||||
| Bonds & Permits | 0.00% | $0 | |||
| Contracting Method Adjustment | 0.00% | $0 | |||
| Inflation Escalation | 0 | Months | Annual Rate = | 0.00% | $0 |
| Total Estimated NET Cost of Construction | $0 |
Class B Construction Cost Estimate&4 &"Arial,Regular" &"Arial,Bold"&13PROJECT COST SUMMARY
&6&F &A Page &P of &N &6Print Date: &D, &T
B20 - Exterior Enclosure
Summary Item B20 Exterior Enclosure Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| B2010 | EXTERIOR WALLS | |||||||||
| Basic Requirement | Stucco Repairs | 80 | sq | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
SUBTOTAL EXTERIOR WALLS 100 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
| Summary Item | B20 | Exterior Enclosure | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
B20 Exterior Enclosure 100 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
C30 - Interior Finishes
Summary Item C30 Interior Finishes Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| C3010 | WALL FINISHES | |||||||||
| Basic Requirement | Loss of Key, Severely Cracked or Bulging Wall Plaster | 175 | SF | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Basic Requirement | Cracked, Chipped, or Crumbling Wall Plaster | 175 | SF | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Basic Requirement | Re-adhere Loose Plaster Fragments | 5 | SF | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Basic Requirement | Plaster Crack Repairs | 75 | LF | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Basic Requirement | Limewash Coating & Paint Stabilization | 500 | SF | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Basic Requirement | Wallpaper Stabilization | 3 | SF | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Basic Requirement | Lath Stabilization | 5 | SF | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | WALL FINISHES | 100 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Summary Item | C30 | Interior Finishes | |||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | ||||||
| C3020 | FLOOR FINISHES | ||||||||||
| Basic Requirement | Wood Floor Finish Cleaning | 1300 | SF | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | FLOOR FINISHES | 100 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Summary Item | C30 | Interior Finishes | |||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | |||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | ||||||
| C3030 | CEILING FINISHES | ||||||||||
| Basic Requirement | Consolidate Plaster | 75 | SF | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| Basic Requirement | Raise-Re-adhere Distorted Plaster | 50 | SF | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | ||
| SUBTOTAL | CEILING FINISHES | 100 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Summary Item | C30 | Interior Finishes | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
C30 Interior Finishes 100 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
E10 - Equipment
Summary Item E10 Equipment Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| F1010 | SPECIAL STRUCTURES | |||||||||
| Basic Requirement | Temporary Site Protection | 1 | LS | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Basic Requirement | Shoring and Bracing | 1 | LS | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Basic Requirement | Equipment Rental | 0.5 | Months | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Basic Requirement | Small Tools | 1 | LS | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | SPECIAL STRUCTURES | 100 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Summary Item | E10 | Equipment | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
E10 Equipment 100 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T
Special Use- 1
Summary Item XX Special Use - 1 Total Cost: $0
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost | |||||
| BASE CODE | BASE ELEMENT | |||||||||
| Basic Requirement | Field Personal, Safety | 4 | wk | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Basic Requirement | Field Personal, Superintendent | 6 | wk | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| Basic Requirement | Field Personal, Quality Control | 3 | wk | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 | |
| SUBTOTAL | BASE ELEMENT | 100 | Unit | $ - 0 | $0 | $ - 0 | $0 | $ - 0 | $0 |
| Summary Item | XX | Special Use - 1 | ||||||||
| Uniformat II WBS Code | Description | Quantity | Unit | MATERIAL | INSTALLATION | TOTALS | ||||
| Material Cost/Unit | Total Material Cost | Install Cost/Unit | Total Install Cost | Total Cost/Unit | Total Cost |
XX Special Use - 1 100 Unit $ - 0 $0 $ - 0 $0 $ - 0 $0
Class B Construction Cost Estimate&8 (expanded)&6
&12LINE ITEM COST SUMMARY
&6&F, &A &9&P of &N &6&D &T