B08_Attachment 4 - CDRL_A003_Technical Summary Report.pdf
PDF 146 KB Posted
- Solicitation number
- 959006-24-R-0004
- Issued by
-
Morris K. Udall Foundation
About this file
This document is a Contract Data Requirements List (CDRL) outlining reporting requirements for a technical summary report under a contract with the Morris K. Udall Foundation. The contractor must submit a draft technical summary report within 15 months of contract award and a final report within 30 calendar days of receiving government comments on the draft. The report provides a non-confidential summary of any database issues identified, enhancements implemented, and training conducted under the contract. It must be submitted electronically in MS Word and PDF formats without restrictions, and include a list of training attendees if not confidential. The report style, formatting, and submission instructions are defined. The technical monitor is Dana Goodson at the Morris K. Udall Foundation and the contracting officer's representative is Elisa Alvarez.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Morris K. Udall and Steward L. Udall Foundation, 434 E. University Blvd., Suite 300, Tucson, AZ 85705. Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER_X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003
Technical Summary Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
NA TOTAL PRICE
7. NOT USED 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED See Block 16
15 Months after Contract Award
a. ADDRESSEE
b. COPIES
8. NOT USED 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. final See Block 16 draft reg repr
16. REMARKS TM 1 1
The Contractor’s Technical Summary report provides the Morris K. Udall and Stewart L. Udall Foundation with a non-confidential report for the Government to review for clarity, formatting, and typos (no content review).
The database technical summary will provide a brief description of any database issues identified, enhancements implemented, and training conducted. If not confidential, a list of training attendees shall be included.
Each report, both draft and final, shall be submitted to the following personnel/email addresses:
Technical Monitor is Dana Goodson at goodson@udall.gov.
Contracting Officer’s Representative is Elisa Alvarez at alvarez@udall.gov
COR 1 1
1. Format: Each report will be submitted in both MS Word (.doc) and Adobe (.pdf) format to the TM and Contracting Officer. The document will not be locked or protected in any fashion that would prevent text to be copied by the government after delivery.
(a) Report shall be written for printing on 8 1/2" X 11" standard letter size paper (Portrait orientation) although necessary attachments, figures, and sketches may be submitted on in a size/orientation that best displays the information being presented.
(b) Font shall be Times New Roman, size 12.
(c) Each page beyond the first page shall have a header identifying the site name or report title and date of report.
(d) Report shall be grammatically correct.
(e) All attachments shall be identified and referenced in the text of the report.
2. Schedule: The first DRAFT report shall be submitted within 15 months of contract award. The FINAL report is due 30 calendar days from receipt of Government comments. If comments are not received within 45 days of receipt of submission of the DRAFT report, then the DRAFT report becomes the FINAL report.
15. TOTAL --------------- > 2 2
G. PREPARED BY H. DATE I. APPROVED BY
J. DAT
Dana Goodson 6/12/23
UDALL Form 1423-1, FEB 2021 Previous editions are obsolete Page 1 of 1 Page mailto:goodson@udall.gov mailto:alvarez@udall.gov
File details come from the government source that posted it. Updated .