B08_Attachment_3_-_Subcontracting_Percentage_Worksheet.docx

DOCX document 286 KB Posted

Attached to
Eisenhower National Historic Site Federal contract opportunity
Solicitation number
140P4226Q0008
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This is a Subcontracting Percentage Worksheet attachment for FAR Clause 52.219-14 related to solicitation 140P4226Q0008 for EISE HQ HVAC Replacement at Eisenhower National Historic Site, issued by the National Park Service on 19 February 2026. The worksheet provides calculation instructions for determining subcontracting labor cost percentages, with step-by-step guidance for computing direct labor, fringe benefits, and labor G&A costs for both prime contractors and subcontractors. The document includes a worked example demonstrating the formula, showing a prime contractor with $605 total labor costs and a subcontractor with $165 total labor costs, resulting in a subcontracting labor percentage of 21.43 percent.

The worksheet establishes compliance requirements under FAR Clause 52.219-14(e)(4) for construction by special trade contractors, which mandates that the prime contractor shall not pay more than 75 percent of the Government-paid amount to non-similarly situated subcontractors. This effectively requires the prime contractor or similarly situated entities to perform a minimum of 25 percent of the work, excluding material costs. Contractors are instructed to either manually calculate the subcontracting percentage using the provided formula or utilize the embedded Excel worksheet object for automated calculation. The document emphasizes that labor overhead must be demonstrable as allowable under FAR 31.205-6(m), with failure to do so resulting in elimination of the entire overhead from calculations.

View the file

Other files for this federal contract opportunity

Other files attached to Eisenhower National Historic Site, newest first.
File Type Posted
B08_Attachment_5_-_140P4226Q0008_Project_Experience_0001.docx DOCX document
Sol_140P4226Q0008_Amd_0001.pdf PDF
Site_Visit_Sign_In-EISE_HQ_HVAC_Replacement_0001.pdf PDF
Sol_140P4226Q0008.pdf PDF
B08_Attachment_1_-_SOW_EISE_HQ_HVAC_Replacement.pdf PDF
B08_Attachment_4_-_Q_A_Document.xlsx XLSX spreadsheet
B03_Attachment_2_-_WD_PA20260073.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

NATIONAL PARK SERVICE

CON OPS East Philadelphia MABO 1234 Market Street Philadelphia, PA 19107

19 February 2026

SUBJECT: FAR CLAUSE 52.219-14, SUBCONTRACTING PERCENTAGE WORKSHEET

SOLICITATION 140P4226Q0008 EISE HQ HVAC Replacement

PRIME CONTRACTOR: _________________________ SOURCE: ________________________

SUBCONTRACTOR: ___________________________ SOURCE: ________________________

Example:

To calculate, either follow the below directions OR right click the above Excel ‘Object’ and select ‘Worksheet Object’ then ‘Edit’. You can then input Direct Labor/Fringe Benefits/G&A % and it will calculate for you (as illustrated).

a) To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

b) Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

c) Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).

d) Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

e) Next, using the formula below, calculate the subcontracting labor percentage.

____(D)____

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE = %

*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

**G&A denotes General and Administrative Costs ***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.

In accordance with FAR Clause 52.219-14(e)(4), Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. Therefore, the prime contractor or similarly situated entities shall perform a minimum of 25 percent of the work, excluding the cost of materials.

NPS-CON OPS East Page 1 of 1

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 3.104

Preserving unimpaired the natural and cultural resources and values of the national park system for the enjoyment, education, and inspiration of this and future generations.

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 3.104

image1.emf

Microsoft_Excel_Worksheet.xlsx Sheet1

PRIME CONTRACTOR SUBCONTRACTOR

DIRECT LABOR $250.00 $50.00

FRINGE BENEFITS $300.00 $100.00

SUB TOTAL (A)$550 (B)$150

LABOR G&A** @ 10.00% $55.00 10.00% $15.00

TOTAL LABOR COST (C)$605 (D)$165

Subcontracting Labor Percentage 21.43% image2.jpeg image3.jpeg