B08 Attachment 3_Diagram 2.pdf
PDF 240 KB Posted
- Attached to
- CERC Pond 2 Leak Repair
- Solicitation number
- 140G0121Q0050
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The above arrow points to the referenced network and telephone lines. The original 1992 fiber along with other fiber and copper wire runs to R1 and up past R1, go in a pipe on the north side of that pond. There should also be a 4 X2 ft junction box in the North West corner of the pond. The pipe comes out of the junction box. The pipe by this time will be probably 10 to 14 inches deep, and about 18 to 24 inches from the full water line. I do not have anything that I know on the west side of the pond but maintenance has put a couple of things in that area over the years. It should be on the construction maps when they did R1 and the holding ponds.
Diagram 2
File details come from the government source that posted it. Updated .