This is a Specifications document for a federal contract opportunity with Yosemite National Park requiring the supply and delivery of miscellaneous building materials for the reconstruction of the Tuolumne Meadows Ranger Office.

The contractor shall supply all items listed in the Quote and Price Schedule (Attachment 01) or provide comparable alternatives with manufacturer and part numbers. Items must be organized into four bundles (Bundle 1, Bundle 2, Bundle 3, and Bundle 4), with each bundle wrapped and delivered together as a complete unit. Multiple deliveries are permitted, but each individual bundle must remain intact. Delivery must occur within 45 days after receipt of order (ARO) to Attn: Building and Grounds, 5083 Foresta Road, El Portal, California 95318. Delivery scheduling requires at least 48 hours advance notice, and unless pre-approved by the National Park Service, deliveries will not be accepted on Fridays, weekends, or Federal holidays. If the contractor cannot provide specified items, the contracting officer must be contacted to approve suitable alternatives. Contractors should verify current road conditions prior to hauling, as vehicles over 45 feet are prohibited and 1-way controlled traffic exists 20 miles east of Mariposa due to rockslide repairs. Highway 41 to Wawona may close during inclement weather. Travel restrictions and related delays are considered existing conditions and will not be grounds for additional compensation.

View the file

Other files for this federal contract opportunity

Other files attached to YOSE-PURCHASE MISC BUILDING SUPPLIES, newest first.
File Type Posted
Sol_140P8526Q0079.pdf PDF
B08_Attachment_1_Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building Supplies for Yosemite NP Page 1 of 2

Specifications

Miscellaneous Building Materials

Yosemite National Park

Description:

Yosemite National Park has a requirement for supply and delivery of miscellaneous building materials for the reconstruction of the Tuolumne Meadows Ranger Office

Specifications:

The contractor shall supply all items listed or a comparable alternative (comparable alternatives must provide manufacturer/part number). Items shall be bundled/marked by location assigned to each list. If the contractor cannot provide items specified in the list, the contractor shall contact the contracting officer to ensure the alternative is suitable to meet the needs of the NPS.

All items listed on the Quote and Price Schedule (Atch 01) have been grouped into four (4) bundles. Multiple deliveries may be made, however each individual bundle must be wrapped and delivered together as a complete unit. Each bundle must be labeled as follows:

• BUNDLE 1

• BUNDLE 2

• BUNDLE 3

• BUNDLE 4

Delivery:

Delivery shall be made within 45 days after receipt of order (ARO).

Items must be bundled and marked as listed below and delivered to:

Attn: Building and Grounds

5083 Foresta Road

El Portal, Ca. 95318

Delivery must be scheduled at least 48 hours in advance. Unless pre-approved by the NPS, deliveries will not be accepted on Friday, weekends, or Federal holidays.

*Note- Visit www.nps.gov/yose to obtain the latest status and locations for road construction activities, estimated dates of construction, and estimated delays.

Travel restrictions: Vehicles over 45 feet are prohibited and 1-way controlled traffic for all other vehicles 20 miles East of Mariposa (Mariposa County) 24 hours per day, seven days per week due to rockslide repairs. The road leading to Wawona (Hwy 41) can close during inclement weather, see Caltrans website at http://www.dot.ca.gov. Please verify current road conditions prior to

Building Supplies for Yosemite NP Page 2 of 2 hauling. These delays and restrictions must be considered part of the existing conditions within the park and will not be cause for any additional compensation because of travel restrictions or related work.