These architectural design documents detail the rehabilitation of the museum building entrance at Springfield Armory National Historic Site to achieve Americans with Disabilities Act (ABA) compliance. The project involves removing an existing temporary ramp and constructing a new accessible concrete ramp with handrails, replacing exterior and interior doors with automatic sliding doors, adding door openers, and restoring concrete dock and stair surfaces.
Key scope elements include installing a new ramp with proper slope and width, replacing entrance doors with power-assisted sliding doors that have motion sensors and push button controllers, adding automatic door openers, and ensuring all modifications meet 2024 International Building Code and ABA accessibility standards. The project preserves the historic architectural integrity of the Arsenal Building (Building 13), with careful attention to maintaining existing materials and site features. Electrical work involves modifying existing branch circuits to support the new door systems, with work to be performed within specified work hours and with archaeological monitoring required during excavation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE
NATIONAL PARK SERVICE
HISTORIC ARCHITECTURE CONSERVATION ENGINEERING REGION COUNTY
DEPARTMENT OF THE INTERIOR
UNITED STATES LOCATION WITHIN PARK
NAME OF PARK
TITLE OF PROJECT
PMIS/PKG. NO.
SHEET
DRAWING NO.
IR 1 HAMPDEN MASSACHUSETTS 1 9
195544
321347 ARSENAL BUILDING (No. 13)
SPRINGFIELD ARMORY NATIONAL HISTORIC SITE
SUBMISSION REHABILITATE MUSEUM BUILDING
ENTRANCE FOR ABA COMPLIANCE
REHABILITATE MUSEUM BUILDING ENTRANCE FOR ABA
COMPLIANCE
ARSENAL MUSEUM BUILDING 13
SPRINGFIELD ARMORY NATIONAL HISTORIC SITE
SPRINGFIELD, MASSACHUSETTS
PMIS No. 321347
LIST OF DRAWINGS
1 CS1 COVER SHEET
2 C1.1 GRADING + SITE INFO + NOTES
3 A1.0 SITE PLAN + INFO
4 A1.1 EXISTING CONDITIONS
5 A1.2 GENERAL NOTES, SYMBOLS, ABBREVIATIONS
6 A1.3 RAMP PLANS + ELEVATIONS
7 A1.4 RAMP SECTIONS + DETAILS
8 A1.5 ENTRANCE DOORS
9 E1.1 ENTRANCE DOORS ELECTRICAL PART PLANS - FIRST FLOOR
VICINITY MAP - SPRINGFIELD, MASSACHUSETTS
ARSENAL - BUILDING 13
SPRINGFIELD ARMORY NHS
ONE ARMORY SQUARE
SPRINGFIELD, MA 01105
TEMPORARY RAMP TO BE REMOVED
MAINTAIN AND PROTECT
GAS LINES
MAINTAIN AND PROTECT SEWER CLEANOUT
INSTALL CATCH BASIN PROTECTION
MAINTAIN AND PROTECT POST
INDICATOR VALVE
RETAIN WINDOW WELL, TYP.
GENERAL NOTES:
1. SYMBOLS AND LEGENDS OF PROJECT FEATURES ARE GRAPHIC
REPRESENTATIONS AND ARE NOT NECESSARILY SHOWN ON THE
DRAWINGS TO SCALE OR TO THEIR ACTUAL DIMENSION OR LOCATION.
COORDINATE DETAIL SHEET DIMENSIONS, MANUFACTURERS'
LITERATURE, SHOP DRAWINGS AND FIELD MEASUREMENTS OF
SUPPLIED PRODUCTS FOR LAYOUT OF THE PROJECT FEATURES.
2. DO NOT RELY SOLELY ON THE PROJECT DOCUMENTS. FIELD VERIFY
LOCATION OF PROJECT FEATURES.
3. PERFORM NECESSARY CONSTRUCTION NOTIFICATIONS, APPLY FOR
AND OBTAIN NECESSARY PERMITS, PAY FEES, AND POST BONDS
ASSOCIATED WITH THE WORK AS REQUIRED BY THE CONTRACT
DOCUMENTS.
4. SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS OF BUILDINGS AND
ADJACENT SITE ELEMENTS INCLUDING SIDEWALKS, RAMPS, BUILDING
ENTRANCES, STAIRWAYS, UTILITY PENETRATIONS, CONCRETE DOOR
PADS, COMPACTOR PAD, LOADING DOCKS, BOLLARDS, ETC.
5. LOCATION OF UTILITIES SHOWN HEREON ARE THE RESULT OF
SURFACE EVIDENCE AS LOCATED BY FIELD SURVEY, PLANS OF
RECORD, INFORMATION FURNISHED BY THE RESPECTIVE UTILITY
COMPANIES, AND OTHER AVAILABLE SOURCES. THIS PLAN DOES NOT
NECESSARILY DEPICT THE EXACT LOCATION OF ALL UTILITIES WHICH
MAY EXIST AT THIS TIME WITHIN THE PREMISES SURVEYED.
LOCATIONS SHOULD BE VERIFIED BY THE RESPECTIVE UTILITY
COMPANY BEFORE BEING RELIED UPON. ALL FIELD CHANGES MUST BE
APPROVED BY THE ENGINEER.*
6. LOCATION AND INVERTS OF EXISTING UTILITIES SHALL BE VERIFIED
WITH THE ENGINEER PRIOR TO CONSTRUCTION. ALL FIELD CHANGES
MUST BE APPROVED BY THE ENGINEER.*
7. THE GOVERNMENT MAKES NO GUARANTEES THAT THE UNDERGROUND
UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, NOR
THAT THEY ARE SHOWN ON DRAWINGS IN THEIR EXACT LOCATIONS.
BEFORE CONSTRUCTION, THE CONTRACTOR SHALL CALL DIG SAFE
SYSTEMS FOR CLEARANCE.
EARTHWORK:
1. CALL DIG-SAFE 811 OR 1-888-DIG-SAFE A MINIMUM OF 72 HOURS PRIOR TO
CONSTRUCTION.
2. STOP WORK IN VICINITY OF SUSPECTED CONTAMINATED SOIL,
GROUNDWATER OR OTHER MEDIA. IMMEDIATELY NOTIFY THE
GOVERNMENT/COR SO THAT APPROPRIATE TESTING AND SUBSEQUENT
ACTION CAN BE TAKEN. RESUME WORK IN THE IMMEDIATE VICINITY ONLY
UPON DIRECTION BY THE GOVERNMENT.
3. WITHIN THE LIMITS OF THE BUILDING FOOTPRINT, PERFORM EARTHWORK
OPERATIONS TO SUBGRADE ELEVATIONS. SEE DRAWINGS BY OTHERS
FOR WORK ABOVE SUBGRADE.
4. CONTRACTOR SHALL PROTECT ALL SLOPES, VEGETATION, PAVING,
WALKS, AND IMPROVEMENTS OUTSIDE THE AREAS TO BE AFFECTED BY
THE CONSTRUCTION OF THIS PROJECT.
5. REFER TO EROSION AND SEDIMENTATION CONTROL DETAILS FOR
EROSION AND SEDIMENTATION CONTROL NOTES.
6. CATCH BASINS WITHIN THE WORK AREA OR DOWN STREAM OF DRAINAGE
FLOW SHALL BE PROTECTED WITH CATCH BASIN SILT SACKS. SEE DETAIL
IMAGE BELOW.
7. WATER AND CALCIUM CHLORIDE MUST BE AVAILABLE AT ALL TIMES FOR
DUST CONTROL.
8. ALL PROJECT WORK MUST REMAIN WITHIN THE LIMIT OF WORK SHOWN
ON THE PLAN.
REGULATORY REQUIREMENTS:
1. FIELD INSPECTOR SHALL BE NOTIFIED 48 HOURS PRIOR TO
CONSTRUCTION.
2. APPROVED PLANS TO BE ON SITE AT ALL TIMES.
3. THE CONTRACTOR IS RESPONSIBLE FOR SITE SECURITY AND JOB
SAFETY. PERFORM CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH
OSHA STANDARDS AND LOCAL REQUIREMENTS.
4. DISPOSE OF DEMOLITION DEBRIS IN ACCORDANCE WITH APPLICABLE
FEDERAL, STATE, AND LOCAL REGULATIONS, ORDINANCES, AND
STATUTES.
ARCHAEOLOGICAL MONITORING:
1. ARCHAEOLOGICAL MONITORING IS REQUIRED FOR ALL AREAS THAT
WILL BE DISTURBED BY PROJECT-RELATED ACTIVITIES, INCLUDING
TRENCHING BENEATH EXISTING PAVEMENT. MONITORING SHALL
CONSIST OF DIRECT OBSERVATION OF EXCAVATION, FROM A SAFE
DISTANCE, BY AN ARCHAEOLOGIST MEETING THE SECRETARY OF THE
INTERIOR'S PROFESSIONAL STANDARDS. IN THE EVENT THAT
POTENTIALLY SIGNIFICANT OR SIGNIFICANT ARCHAEOLOGICAL
FEATURES OR DEPOSITS ARE DISCOVERED DURING MONITORING,
CONSTRUCTION ACTIVITY SHALL BE REDIRECTED AWAY FROM THE
AREA UNTIL THE FIND CAN BE DOCUMENTED.
DEMOLITION:
1. THE DEMOLITION PLAN IS PROVIDED FOR INFORMATION ONLY AND MAY
NOT INDICATE ALL ITEMS REQUIRED TO BE DEMOLISHED. PERFORM A
PRE-BID SITE INSPECTION. COORDINATE DEMOLITION OF UNIDENTIFIED
UTILITIES OR STRUCTURES WITH THE GOVERNMENT. DEMOLISH
STRUCTURES, SITE IMPROVEMENTS, UTILITIES, ETC. AS REQUIRED TO
CONSTRUCT PROPOSED FACILITY AND UTILITY SERVICES.
WORK RESTRICTIONS:
1. DO NOT CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS, FIRE HYDRANTS,
AND UTILITIES WITHOUT APPROPRIATE PERMITS.
2. WORK IS RESTRICTED TO THE HOURS OF 7AM TO 5PM ON MONDAY
THROUGH FRIDAY.
CONSTRUCTION LAYOUT:
1. PRIOR TO ORDERING MATERIALS AND BEGINNING CONSTRUCTION, FIELD
VERIFY PROPOSED UTILITY ROUTES AND IDENTIFY ANY INTERFERENCES
OR OBSTRUCTIONS WITH EXISTING UTILITIES OR PUBLIC
RIGHTS-OF-WAY.
2. IMMEDIATELY INFORM THE GOVERNMENT IN WRITING IF EXISTING
UTILITY CONDITIONS CONFLICT OR DIFFER FROM THAT INDICATED AND IF
THE WORK CANNOT BE COMPLETED AS INDICATED.
3. DIMENSIONS ARE FROM FACE OF CURB, FACE OF BUILDING, FACE OF
WALL, AND CENTER LINE OF PAVEMENT MARKINGS, UNLESS NOTED
OTHERWISE.
SITE RESTORATION:
1. REPAIR DAMAGES RESULTING FROM CONSTRUCTION LOADS, AT NO
ADDITIONAL COST TO THE GOVERNMENT.
2. RESTORE AREAS DISTURBED BY CONSTRUCTION OPERATIONS OUTSIDE
OF THE WORK AREA TO THEIR ORIGINAL CONDITION OR BETTER, AT NO
ADDITIONAL COST TO THE GOVERNMENT.
NOTES:
1. ALL CATCH BASINS WITHIN THE WORK AREA OR DOWN STREAM OF
DRAINAGE FLOW WILL BE PROTECTED WITH CATCH BASIN SILT SACKS.
2. ALL PROJECT WORK MUST REMAIN WITHIN THE LIMIT OF WORK SHOWN
ON THE PLAN.
MAP REFERENCE:
1. EXISTING CONDITIONS DEPICTED ON THIS PLAN ARE BASED ON:
1.A. PLAN ENTITLED: PLAN OF LAND IN SPRINGFIELD, MA, PREPARED
FOR FUSS & O'NEILL, INC. EXISTING CONDITIONS. DATED
07-31-2014, SHEETS 1 THROUGH 3, PREPARED BY NORTHEAST
SURVEY CONSULTANTS, 116 PLEASANT ST., SUITE 302, PO BOX
109, EASTHAMPTON, MA 01027, PROJECT NUMBER: 13-150.1,
DRAWING NAME: 13-150.1.DWG.
1.B. LIDAR CONTOURS COMPLETED BY WOOLPERT IN OCTOBER 2012,
FOR SCIENCE APPLICATIONS INTERNATIONAL CORPORATION. GIS
FILES PROVIDED TO FUSS & O'NEILL. FILES CONVERTED USING
ARCGIS AND INPUTTED INTO AUTOCAD.
2. HORIZONTAL DATUM IS MCS NAD83, VERTICAL DATUM IS NGVD88 AND
BOTH ARE BASED ON A DUAL FREQUENCY GPS SURVEY.
3. VERTICAL BENCHMARK:
SPIKE IN ROOT
OF 18" MAPLE
EL=146.19'
N 2865323.816 E 362680.491
SPIKE IN ROOT
EL=188.88'
N 2865708.473 E 362891.518
SPIKE IN ROOT
EL=196.48'
N 2866124.697 E 362779.035
SPIKE IN 20"
MAPLE
EL=192.44'
N 2865948.636 E 362476.923
HYDRANT SPINDLE
EL=130.81'
N 2866267.093 E 361615.264
HYDRANT SPINDLE
EL=144.94'
N 2865992.487 E 361877.663
CHISELED SQUARE
IN CORNER OF
CONC. PAD
EL=194.91'
N 2866287.694 E 362519.711
4. GEOTECHNICAL DATA INCLUDING TEST PIT AND BORING LOCATIONS
AND ELEVATIONS WERE OBTAINED FROM SEABOARD DRILLING.
REHAB. MUSEUM ENTRANCE
GRADING +SITE INFO + NOTES
C1.1
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
CADD:
SPRINGFIELD ARMORY NATIONAL HISTORIC SITE
DRAWING NO.
PMIS No.
SHEET
321347
02/08/2025
HACE
HACE
HACE REHABILITATE MUSEUM BUILDING
ENTRANCE FOR ABA COMPLIANCE
195544
ARCHITECTURAL SITE PLAN
SCALE
AC1.1 A
SCALE
SCALE OF FEET
A
CATCH BASIN SILK SACK
RAISED
CROSSWALK
MAIN
ENTRANCE
ARSENAL - BUILDING 13
ARMORY SQUARE
GRAVEL WALKWAY
EXISTING
ACCESSIBLE
PARKING SPACES
NEW
ACCESSIBLE
RAMP
ACCESSIBLE
ROUTE
STAIR
ENTRY
TOWER
GENERAL NOTES - REHABILITATE, REPAIR ACCESS PMIS # 321347:
1. PLANS AND ELEVATIONS in this set incorporate reproductions of measured drawings prepared from a variety of sources. Certain portions of the drawings have been updated to reflect existing conditions. Dimensions and scales are approximate; the Contractor is responsible for field verifying all dimensions and conditions.
2. DRAWINGS are prepared and coordinated with the technical specifications; both components comprise the Project Manual and govern work of this project. Where there might be discrepancies, the specifications take precedence over the drawings.
3. EXISTING CONDITIONS are noted to provide a guide to typical conditions. The Contractor shall verify all existing conditions prior to beginning work and bring any discrepancies to the Government's attention. Dimensions are for reference only; the Contractor is responsible for field verification of all dimensions and conditions on site prior to proceeding with work, preparing shop drawings, or ordering materials. The entire site, including open space, access paths, and buildings, is a NATIONAL HISTORIC LANDMARK, and the Contractor shall follow the protections directions outlined in the Division 1 General Conditions section of the Project Manual.
4. PROTECTION of existing materials to remain is the Contractor's responsibility. The building is a NATIONAL HISTORIC LANDMARK and Springfield Armory is a NATIONAL HISTORIC SITE and existing materials are significant historic features that must be retained and protected during the course of the work, including structures and landscape. Refer to the Project Manual for additional information regarding protection of building and site features.
SITE PLAN + NOTES
A1.0
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
CADD:
SPRINGFIELD ARMORY NATIONAL HISTORIC SITE
DRAWING NO.
PMIS No.
SHEET
321347
02/08/2025
HACE
HACE
HACE REHABILITATE MUSEUM BUILDING
ENTRANCE FOR ABA COMPLIANCE
195544
ARCHITECTURAL SITE PLAN
SCALE
A1.0 A
SCALE
SCALE OF FEET
A
A1.0
NE ELEVATION EXISTING CONDITION
NTS
A1.0
RENDERING OF NEW ACCESSIBLE RAMP
NTS
A1.0
A1.0
REHAB. MUSEUM ENTRANCE
GENERAL PROJECT SCOPE NOTES - REHABILITATE, REPAIR ACCESS PMIS # 321347:
A. REMOVE TEMPORARY ACCESSIBLE RAMP.
B. CONSTRUCT NEW CONCRETE ACCESSIBLE RAMP: New ramp to meet Architectural Barriers
Act (ABA) and 2024 International Building Code accessibility standards.
C. RESTORE EXISTING CONCRETE DOCK: PATCH CRACKS AND RESTORE SPALLED,
DAMAGED AREAS. Restore areas of concrete dock outside the area where new ramp is to be constructed.
D. RESTORE EXISTING CONCRETE STAIRS: PATCH CRACKS AND RESTORE SPALLED,
DAMAGED AREAS.
E. REPLACE HANDRAILS: Replace handrails with new to match existing and extend at stairs to meet ABA and IBC accessibility code standards.
F. REPLACE EXTERIOR DOORS: Replace existing doors with new automatic sliding doors that meet ABA, IBC, and NFPA Life Safety standards.
G. ADD AUTOMATIC DOOR OPENER TO INTERIOR DOOR: Add automatic door opener to interior door to meet ABA and IBC standards.
H. NEW DOORS, AUTOMATIC OPENERS, AND SIGNAGE and their installation shall comply with International Building Code 2024 and Architectural Barriers Act Accessibility Standards (ABAAS) -notably the following sections:
Chapter 3, Section 309 Operable Parts; Chapter 4, Section 404 Doors, Doorways, Gates; and Chapter 7, Section 703 Signs.
I. PROTECTION OF EXISTING MATERIALS TO REMAIN IS THE CONTRACTOR'S
RESPONSIBILITY: The building is a National Historic Landmark and part of a National Historic Site and existing materials are significant historic features that must be retained and protected during the course of the work, including structures and landscape. Refer to the project manual for additional information regarding protection of building and site features.
EXISTING CONDITIONS
A1.1
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
CADD:
SPRINGFIELD ARMORY NATIONAL HISTORIC SITE
DRAWING NO.
PMIS No.
SHEET
321347
02/08/2025
HACE
HACE
HACE REHABILITATE MUSEUM BUILDING
ENTRANCE FOR ABA COMPLIANCE
195544
EXISTING TEMPORARY RAMP
NTS
A1.1
EXISTING TEMPORARY RAMP
NTS
A1.1
EXISTING DOCK AT ENTRANCE
NTS
A1.1
EXISTING DOCK
NTS
A1.1
ENTRANCE DOORS
NTS
A1.1
EXISTING TEMPORARY RAMP
NTS
A1.1
EXISTING DOCK
NTS
A1.1
EXISTING DOCK STAIRS
NTS
A1.0
EXISTING STAIRS
NTS
A1.1
DETAIL OF TOP OF DOCK
NTS
A1.1
BA BAC
D
E
E
BA
D E
F
INTERIOR DOORS TO MUSEUM
NTS
A1.1
G
A1.2
321347
GENERAL NOTES, SYMBOLS +
ABBREVIATIONS
A1.3 321347
PLANS + ELEVATIONS
A1.4 321347
SECTIONS + DETAILS
STAIR TOWER
ENTRY
6'-11"
6' -7
DOOR 2: ADD
AUTOMATIC
OPENER TO
EXISTING
RIGHT-SIDE
DOOR
DOOR 1: REPLACE
SLIDING DOORS WITH
NEW POWER-ASSISTED
SLIDING DOORS
REQUIRED
18"x18" CLEAR
FLOOR SPACE IN
FRONT OF WALL
WHERE PUSH
CONTROLLER TO
BE INSTALLED
3'-9"
6' -8
7'-1 1/4"
A
B
EDC
F
G
7' -8
/2
7' -2
/2
6'-1"
6'-11"
R
EA
C H
R
AN
G E:
" M
IN
-4
8" M
AX
H
I
TREATMENT KEY FOR DOOR 1 AND DOOR 2:
A. Replace existing sliding automatic entrance with new single-slide, full-breakout sliding automatic entrance.
B. Prepare substrate to receive new extruded aluminum threshold. Install and bed threshold in non-shrink grout as required, ensuring level orientation and correct elevation to allow for proper door operation and compliance with ABA and ICC standards.
C. Provide and install extruded aluminum receptor channel (finish to match door assembly) if required to conceal gaps in soffit and/or bridge gaps and irregularities between door/transom assembly frame and masonry.
D. Using concealed metal framing (studs channels and/or struts) and corrosion- resistant fasteners, secure new entrance assemblies to existing structural steel and/or masonry, typ.
E. Provide continuous backer rod and flexible sealant (in approved color) at entrance assembly perimeter (head and jambs), typ.
F. Connect and install wired door and window contact sensors, typ.
G. Provide manual hookbolt assembly incorporating integral key lock with interchangeable cylinder.
H. Add automatic door opener for existing museum entrance door farther from the main entrance doors.
I. Add push button controller: to be installed outside the arc of the door swing, within the reach range ABA standards.
J. Apply skim coat to patch deteriorated areas of the floor surface inside entrance.
0'-4 1/2"
DOOR
HEADER
MOTION
SENSOR
AUTOMATIC
SLIDING
DOOR
NEW THRESHOLD:
MAX. HEIGHT OF
2" W/ BEVELED
EDGE 1:2 SLOPE
MAX. ABOVE 14"
MAX.
FINISH
FLOOR
BREAKOUT
SIDE
(EXTERIOR)
COVER
SIDE
1 4"
0' -1
/4
TR
AN
SO
M
PIVOT POINT
FINISHED FLOOR MUST NOT BE AN
INCREASE IN ELEVATION THROUGH
BREAKOUT DOORS PATH
CLEAR DOOR OPENING
32" MIN.
1 2"
1 34" 1 4"
BREAKOUT SIDE
(EXTERIOR)
VIEW FROM BREAKOUT SIDE
FIXED SIDELITE
INTERIOR
EXTERIOR
R.H. SLIDEL.H. SLIDE
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. TITLE OF SHEET
CADD:
SPRINGFIELD ARMORY NATIONAL HISTORIC SITE
DRAWING NO.
PMIS No.
SHEET
321347
02/08/2025
HACE
HACE
HACE REHABILITATE MUSEUM BUILDING
ENTRANCE FOR ABA COMPLIANCE
195544
A1.5
A1.5
REHAB. MUSEUM ENTRANCE
ENTRANCE DOORS
A1.5
PLAN OF ENTRY TOWER1
A1.5
DOOR 1: FRONT ENTRANCE DOORS2
A1.5
DOOR 2: MUSEUM ENTRY DOORS6
A1.5J
MUSEUM DOORS (DOOR 2) FROM INSIDE MUSEUM
NTS
A1.5
INTERIOR VIEW OF MAIN ENTRANCE
NTS
A1.5
H
DOOR 1: DETAIL3
A1.5
A1.5
DOOR 1: DETAIL7
A1.5
A1.5
E F G H I J
PANELBOARDS 'E' & 'F':
120/208v, 3Ø, 4W, 100A MCB.
22 2 2 2
E1.1
E1.1
SEE PLAN OF
ENTRY TOWER.
2-#12 & 1-#12G - 3/4"EMT
RUN ON CEILING.
DOWN
EXISTING BRANCH
CIRCUIT TO REMAIN.
NEAREST JB OR COUPLING.
DETERMINE IN THE FIELD.
SHEET NOTES:
1. EXISTING ELECTRIC-POWER AUTOMATIC DOORS TO BE
REPLACED WITH NEW AUTOMATIC DOORS. THIS
CONTRACTOR SHALL DISCONNECT EXISTING BRANCH
CIRCUIT TO EXISTING AUTOMATIC DOOR OPERATOR AND
PULL BACK TO CLOSEST FITTING OR JB. AFTER
INSTALLATION OF NEW AUTOMATIC DOORS FEED NEW
ELECTRIC OPERATOR WITH EXISTING BRANCH CIRCUIT.
EXTEND EMT OF THE SAME SIZE AS EXISTING TO NEW
DOOR AND TRANSITION TO FLEXIBLE METAL CONDUIT FOR
FINAL 6" LENGTH. COORDINATE WITH THE DOOR
CONTRACTOR, PRIOR TO BID, AND INCLUDE ANY
NECESSARY WIRING AND CONDUIT REQUIRED FOR A
COMPLETE AND OPERATING AUTOMATIC DOOR OPENING
SYSTEM.
2. DISCONNECT EXISTING MOTION SENSOR FOR EXISTING
AUTOMATIC DOOR OPENING ASSEMBLY.
3. PROVIDE A NEW 20A, 1P ARC-FAULT BRANCH CIRCUIT
BREAKER IN EXISTING SPACE FOR NEW BRANCH CIRCUIT
TO INTERIOR AUTOMATIC DOORS. NEATLY EDIT PANEL
SCHEDULE TO INDICATE BREAKER USE.
4. NEW AUTOMATIC DOORS FURNISHED AND SET-IN-PLACE
BY OTHERS. THIS CONTRACTOR SHALL EXTEND EXISTING
BRANCH CIRCUIT WIRING TO POWER TERMINALS OF NEW
AUTOMATIC DOORS. 2-#12 & 1-#12G IN 3/4"EMT.
TRANSITION LAST 12" TO 3/4"FC 1"-2" SLACK.
5. LOCATION OF NEW DOOR ELECTRIC SERVICE: VERIFY
WITH DOOR SUBMITTALS.
6. NEW AUTOMATIC DOOR OPENERS FURNISHED AND
SET-IN-PLACE BY OTHERS. THIS CONTRACTOR TO
PROVIDE NEW BRANCH CIRCUIT TO OPENERS ELECTRIC
SERVICE.
7. NEW BRANCH CIRCUIT FROM EXISTING PANEL E & F: SEE
PART FIRST FLOOR PLAN.
8. RUN BRANCH CIRCUIT DOWN FROM CEILING TO DOOR
OPENERS ELECTRIC SERVICE. TRANSITION LAST 12" TO
3/4"FC 1"-2" SLACK.
9. NEW WIRING TO AUTOMATIC DOOR OPENER REMOTE
PUSHBUTTON IN 3/4"EMT RUN UP TO CEILING FROM
OPENERS AND DIRECTLY DOWN TO NEW PUSHBUTTON.
10. NEW AUTOMATIC DOOR OPENERS PUSHBUTTON
ACTUATOR SURFACE MOUNTED WITH CENTERLINE 5-FEET
ABOVE THE FLOOR. EXACT LOCATION, WITHIN 1'-5' FROM
DOOR, TO BE DETERMINE IN THE FIELD BY THE COR.
HC
HC
J
ER
X
EXISTING BRANCH
CIRCUIT TO REMAIN.
NEAREST JB OR COUPLING.
DETERMINE IN THE FIELD.
1. DRAWINGS ARE CONCEPTUAL AND ARE INTENDED TO SHOW GENERAL SYSTEM
CONFIGURATION AND PERFORMANCE. NOT ALL NECESSARY DEVICES AND
COMPONENTS ARE SHOWN. PROVIDE ALL DEVICES AND COMPONENTS FOR A FULLY
FUNCTIONAL SYSTEM.
2. CONTRACT DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY AND MUST BE
USED IN CONJUNCTION TO OBTAIN COMPLETE CONSTRUCTION INFORMATION.
CONTRACTOR SHALL COORDINATE ALL DRAWINGS AND SPECIFICATIONS PRIOR TO
COMMENCING WORK. QUESTIONS REGARDING DESIGN INTENT OR SYSTEM
OPERATION SHALL BE PROMPTLY BROUGHT TO ATTENTION OF THE COR.
3. THE TERM "REMOVE" MEANS DISCONNECT AND REMOVE THE DEVICE INCLUDING
OUTLET AND BRANCH CIRCUIT WIRING AND RACEWAY.
4. THE TERM “PROVIDE” MEANS FURNISH AND INSTALL, COMPLETE AND READY FOR
USE.
5. THE TERM “CONTRACT DOCUMENTS” MEANS THE SPECIFICATIONS, DRAWINGS,
ADDENDUMS, SKETCHES AND OTHER DOCUMENTATION THAT DEFINE THE WORK.
6. ANY CONFLICTS BETWEEN SPECIFICATIONS AND DRAWINGS SHALL BE PROMPTLY
BROUGHT TO COR’S ATTENTION. THE CONTRACTOR SHALL NOT PROCEED WITH ANY
WORK EXCEPT AT THEIR OWN RISK, UNTIL CLARIFICATIONS OF CONFLICTS ARE
ISSUED TO THE CONTRACTORS BY THE COR.
GENERAL NOTES:
BUILDING SYSTEMS UPGRADES
ENTRANCE FOR ABA COMPLIANCE
SPRINGFIELD ARMORY NATIONAL HISTORIC SITE
195544
321347
RT
DT
HACEC
02/08/2025
PLAN OF ENTRY TOWER - NEW WORK
SCALE 'B'
E1.2
E1.2
PART PLAN OF ENTRY TOWER - DEMO
SCALE 'B'
E1.2
PART FIRST FLOOR PLAN
SCALE A
KEY PLAN - FIRST FLOOR PLAN
NO SCALE
REHAB. MUSEUM ENTRANCE
ENTRANCE DOORS
ELECTRICAL PART PLANS - FIRST FLOOR 321347E1.1
4 0 4 8
ASCALE
SCALE OF FEET
BSCALE
2 0 2 4
C:
\U se rs
\r to rp ey
\O ne
D riv e
- D
O I\0
PR
O
JE
CT
S\
SP
AR
\3
H C
AC
CE
SS
IB
LE
\0
D
RA
W
IN
GS
\0
1S T
FL
P
LA
N
.d w g, L ay ou t1 , 1
/2 7/
:3
0:
P M
| Sheets and Views |
| COVER |
File details come from the government source that posted it. Updated .